Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 19. 2004 Time:

0200 Preparer:

Randy Hastings U

1 R

28 NOTE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

NOTE:

V~henever fuel has been remnovedfromn the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0. Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2892 ppnm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM2.1) >2200ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 RED 2

ORANGE 3-4_

5

<2REN Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 GK; RCS Temperature derived from T/Cs TE04 and TEO6.

RCS TENIP = 97-F; 16 daysslistdown; RCS 69%

Subtotal =

3 RCS Time to Boil 43 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY

1.

Independent off-site power sources available to A-05 and A-06 (totally independent at the 4160 V, 13.8 kV, and 345 kV levels)

2.

G-01 or G-02/A-05/B-03 available G-03 or G-04/A-06/B-04 available

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subtotal l

2 3

4-5 Condition RED ORANGE (0-2) 2 (0-1)

I (0-1) 1 (0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

I

4.

Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal =

3

  • *QQ-1;" figt FIS e.-Iao.

in accordance w e Freedom of Information e I of 9 PBF-1562 Revision 2 10/30102

References:

NP 10.3.6 NP 10.2.1 i S~'-

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1) 1 Subtotal 0

1 2-3 4-5-6 Condition RED ORANGE (0-1) 1 Subtotal 4

SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent offsite powersource during periods of single X-03 or X-04 availability (*).

Subtotal Condition

1.

"A' SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G.02 or G-01 via 2B-32 (0-1) n/a 3

YELLOW

.(*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Temp SFP Time to Boil Subtotal =

n/a n/a n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

(Jerry Strharsky) Changed time to boil based on conservative times provided by SEP-1 Attachment C for 3/4 pipe vessel level rather than interpolating data.

PBF-1562 Revision 2 10130/02 Page 2 of 9

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

April 19, 2004 TIME:

0)200 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

GREEN YELLOW GREEN INVENTORY:

CONTAINMENT:

SFP COOLING:

YELLOW GREEN N/A PROTECTED EOUIPMENT:

COMMENTS:

Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 43 minutes RCS is at 69 % Reactor Vessel level Hot leg vent path is the removed Pressurizer manway PBF-1562 Revision 2 10/30/02 Pane 5 of 9

References:

NP 10.3.6 NP 10.2.1