Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 19. 2004 Time:
0200 Preparer:
Randy Hastings U
1 R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
V~henever fuel has been remnovedfromn the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0. Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 2892 ppnm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM2.1) >2200ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 RED 2
ORANGE 3-4_
5
<2REN Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 GK; RCS Temperature derived from T/Cs TE04 and TEO6.
RCS TENIP = 97-F; 16 daysslistdown; RCS 69%
Subtotal =
3 RCS Time to Boil 43 min (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY
- 1.
Independent off-site power sources available to A-05 and A-06 (totally independent at the 4160 V, 13.8 kV, and 345 kV levels)
- 2.
G-01 or G-02/A-05/B-03 available G-03 or G-04/A-06/B-04 available
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Subtotal l
2 3
4-5 Condition RED ORANGE (0-2) 2 (0-1)
I (0-1) 1 (0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
I
- 4.
Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal =
3
- *QQ-1;" figt FIS e.-Iao.
in accordance w e Freedom of Information e I of 9 PBF-1562 Revision 2 10/30102
References:
NP 10.3.6 NP 10.2.1 i S~'-
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1) 1 Subtotal 0
1 2-3 4-5-6 Condition RED ORANGE (0-1) 1 Subtotal 4
SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take credit for only one P-12 independent offsite powersource during periods of single X-03 or X-04 availability (*).
Subtotal Condition
- 1.
"A' SFP cooling pump available 0-1 RED with power available from:
2 ORANGE G.02 or G-01 via 2B-32 (0-1) n/a 3
YELLOW
.(*) an independent off-site power 4-5 GREEN source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
.(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:
NW n/a OF SE n/a OF SFP Average Temp SFP Time to Boil Subtotal =
n/a n/a n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
(Jerry Strharsky) Changed time to boil based on conservative times provided by SEP-1 Attachment C for 3/4 pipe vessel level rather than interpolating data.
PBF-1562 Revision 2 10130/02 Page 2 of 9
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 19, 2004 TIME:
0)200 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
GREEN YELLOW GREEN INVENTORY:
CONTAINMENT:
SFP COOLING:
YELLOW GREEN N/A PROTECTED EOUIPMENT:
COMMENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 43 minutes RCS is at 69 % Reactor Vessel level Hot leg vent path is the removed Pressurizer manway PBF-1562 Revision 2 10/30/02 Pane 5 of 9
References:
NP 10.3.6 NP 10.2.1