Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920083
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/18/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920083 (3)


Text

t - N RQ.

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date: April 18,2004 Time: 14()0 Preparer: Jun Leiker U I R 28 '

NOTE: Refer to base procedureNP 10.3.6forsafety assessment checklist KSF definitions.

NOTE: IWheneverfitel has been renzovedfroin the reactorvessel and refueling cavity, all key safety functions are GREEN except spent fitel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY Subtotal Condition

1. RCS Boron concentration = 2S92 pprn a.) For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.) For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) ] 0-1 RED
2. Number of boration paths (0-2) 2 2 ORANGE
3. No fuel motion (0-1) 1
4. SR instrumentation operable (0-1) I 6- __E Subtotal =

CORE COOLING Subtotal Condition

1. Number of SG available for DHR (0-2) 0 0-1 RED
2. Refueling cavity filled (0-1) 0 2
3. Number of trains RHR available (0-2) 2 (i)
4. RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature derived from TICs TE04 and TE06.

RCS TEMI1' = 97"F; 15 dayssiutdlown; RCS 68% Subtotal = 3 RCS Time to Boil 43 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I. Independent off-site power sources I RED available to A-05 and A-06 (totally 2 ORANGE independent at the 4160 V, 13.8 kV. 3 and 345 kV levels) (0-2) 2 5GR

2. G-01 or G-021A-05/B-03 available (0-1) 1 G-03 or G-041A-06/B-04 available (0-1) 1
3. G-05 available, Reactor Cavity filled to Ž23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) 0 Subtotal = 4 INVENTORY Subtotal Condition
1. Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2
2. Refueling Cavity filled (see definition) (0-3) 0 ( L
3. RCS level above REDUCED INVENTORY (0-1) 1 4
4. Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal = 3

.6...,,lt iv tInllS record was deleted in accordance witht Freedom of Information PBF156 Act exPagteoof

References:

NP 10.3.6 Revision 2X1J -ng Page$II of 9 NP 10.2.1 Al

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Subtotal Condition

1. Containment integrity (TS 15.1.D) (Containment 0 RED Operable) (ITS TS 3.6.1) set (O or 4) 0 ORANGE
2. Containment Closure CL-1 E maintained 2-3 and closure < time to boil (O or 2) 2 @3-6
3. No fuel motion (0-I) I
4. DHR Capability:

- cavity flooded and internals out OR

- at least one SG available OR

- one fan cooler with Equip hatch installed and personnel hatches capable of being shut (0-1) 1 Subtotal = 4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE: Take creditfor only one P-12 independent offsite power sourceduringperiods of single X-03 or X-04 availability(*).

Subtotal Condition I 'A" SFP cooling pump available 0-1 RED with power available from: 2 ORANGE

- G-02 or G-01 via 2B-32 (0-1) n/a 3 YELLOW

  • (*) an independent off-site power 4-5 GREEN source different than that for Train B below (0-1) n/a
2. WB" SFP cooling pump available with power available from:

- G-03 or G-04 via IB-42 (0-1) n/a

-() an independent off-site power source different than that for Train A above (0-1) n/a

3. Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. (0-1) n/a SFP Temperatures: Subtotal = n/a NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

(Jerry Strharskly) Changed time to boil based on conservative times provided by SEP-1 Attachment C for 314pipe vessel level rather than interpolating data.

PBF-1562

References:

NP 10.3.6 Revision 2 10130/02 Page 2 of 9 NP 10.2.1

Point Bcach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT: 1 DATE: April 18, 2004 TIME: 140(0 KEY SAFETY FUNCTIONS:

REACTIVITY: GREEN CORE COOLING: YELLOW POWYER AVAILABLE: GREEN INVENTORY: YELLOW CONTAINMENT: GREEN SFP COOLING: N/A PROTECTED EOUIPMENT:

Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 43 minutes RCS is at 68 % Reactor Vessel level Hot leg vent path is the removed Pressurizer manway PBF-1562

References:

NP 10.3.6 Revision2 ioW3/0o2 Page 5 of 9 NP 10.2.1