Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051920083
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 04/18/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051920083 (3)


Text

t -

N RQ.

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 18,2004 Time:

14()0 Preparer:

Jun Leiker U

I R

28 '

NOTE:

Refer to base procedure NP 10.3.6 for safety assessment checklist KSF definitions.

NOTE:

IWheneverfitel has been renzovedfroin the reactor vessel and refueling cavity, all key safety functions are GREEN except spent fitel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2S92 pprn a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1)

]

2.

Number of boration paths (0-2) 2

3.

No fuel motion (0-1) 1

4.

SR instrumentation operable (0-1)

I Subtotal 0-1 2

6-Condition RED ORANGE

__E Subtotal =

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 (i)

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Temperature derived from TICs TE04 and TE06.

RCS TEMI1' = 97"F; 15 dayssiutdlown; RCS 68%

Subtotal =

3 RCS Time to Boil 43 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV.

3 and 345 kV levels)

(0-2) 2 5GR

2.

G-01 or G-021A-05/B-03 available (0-1) 1 G-03 or G-041A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to Ž 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent wlhead on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0

(

L

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

3

.6...,,lt iv tInllS record was deleted in accordance witht Freedom of Information PBF156 Act exPagteoof Revision 2X1J Page$I

-ng I of 9

References:

NP 10.3.6 NP 10.2.1 Al

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-1 E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-I)

I Subtotal 0

2-3

@3-6 Condition RED ORANGE (0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition I

'A" SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G-02 or G-01 via 2B-32 (0-1) n/a 3

YELLOW

  • (*) an independent off-site power 4-5 GREEN source different than that for Train B below
2.

WB" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

-() an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil > 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal =

n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

(Jerry Strharskly) Changed time to boil based on conservative times provided by SEP-1 Attachment C for 314 pipe vessel level rather than interpolating data.

PBF-1562 Revision 2 10130/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Bcach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

April 18, 2004 TIME:

140(0 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWYER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EOUIPMENT:

Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 43 minutes RCS is at 68 % Reactor Vessel level Hot leg vent path is the removed Pressurizer manway PBF-1562 Revision2 ioW3/0o2

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9