s LC Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 18,2004 Time:
0200 Preparer:
James Hanna U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSFdeflnitions.
NOTE:
If'lieneverfitel has been remnovedfromn the reactor vessel and refueling cavity, all key safetyfimctions are GREEN excent spentfuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 2890 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition (0-1) 1 (0-2) 2 (0-1)
I (0-I)
I 0-1 RED 2
ORANGE 3-4 5
C GEEN Subtotal 5
CORE COOLING Subtotal Condition I.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5<G:
RCS Temperature derived from T/Cs TE04 and TE06.
RCS TEMIP = 98'F; 15 days shutdown; RCS 69%
Subtotal -
3 RCS Time to Boll 43 min (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally
.2 ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-051B-03 available (0-1)
I G-03 or G-04/A-06/B-04 available (0-I)
I
- 3.
G-05 available, Reactor Cavity filled to a 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-I) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent Wvhead on 0-I RED (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
YELLOW
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal 3
--- acioluuru was aeleted inacowrD dancX e A
B in accordance with t e Freedom of Information Act, e tePoIo PBF-1562 F01 A Revision 2 10/30/02 Page I of 9
References:
NP 10.3.6 A
NP 10.2 q1 I.
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.1.D) {Containment Operable) {ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0
1 2-3 4-5-6 Condition RED ORANGE
<EE (0-1) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsite power source duringperiods of single X-03 or X-04 availabiliy (*).
Subtotal Condition
- 1.
"A" SFP cooling pump available 0-1 RED with power available from:
2 ORANGE G-02orG-0I via2B-32 (0-1) n/a 3
YELLOW
-(s) an independent off-site power 4-5 GREEN source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
(*) an independent off-site power source different than that for
-Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil E-12 hours.
(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:
NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal =
n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
(Jerry Strharsky) Changed time to boil based on consen'ative times provided by SEP-I Attachment C for % pipe vessel level rather than Interpolating data.
PBF-1 562 Revision 2 10130/02 References NP 10.3.6 NP 10.21 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
1 DATE:
April 18, 2004 TIME:
0200 KEY SAFETY FUNCTIONS:
REACTIVITY:
CORE COOLING:
POWER AVAILABLE:
INVENTORY:
CONTAINMIENT:
SFP COOLING:
GREEN YELLOW GREEN YELLOW GREEN N/A PROTECTED EOUIPMENT:
COMMENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 43 minutes RCS is at 69% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10130/02
References:
NP 10.3.6 NP 102.1 Page 5 of 9.