-Ix Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 15,2004 Time:

0400 Preparer:

T. R. Branam U

I R

28 NVOTE:

Refer to base procedure NP 10.3. 6for safety assessment checklist KSF definitions.

NOTE:

Tl7seneverfiuel has been remon'etfrom the reactor vessel and refueling cavity, allkeysafetyfiuictions are GREEN except spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 1892 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE CM>

(0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0.1 2

3-4 5

Subtotal S

CORE COOLING Subtotal Condition

1.

Number ofSG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 t

RCS TEMP - 97 0F; 12 days shutdown; RCS 70%

Subtotal 3

RCS Time to Boil 51 inin (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-OS and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-061B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition

1.

Pressurizer level 2:20 percent V/head on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

oL O

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal 3

III~rrfltlo in hisrecod w s deete 1111urmatnon in this record was deleted in accordance with e Freedom of Information Actsio 2

Ac e tonsI of 9 Rcvision 2 10/30/02 e

f

References:

NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINM ENT

1.

Containment inteirity (TS l5..D) {Containment Operable) (ITSTS3.6.1) set

2.

Containment Closure CL-I E maintained and closure < time to boil

3.

No fiel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)

I Subtotal 0 4-5-6 Condition RED ORANGE

<Eov_

(0-o)

I Subtotal =

4 I

SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS) l NOTE:

Take credilfor only one P-12 independent offsite power source tiuring periods of single X-03 orX-04 anvilaf iium (*).

Subtotal Condition

1.

"A SFP cooling pump available 0-1 RED

,with power available from:

2 ORANGE G-02 or G-0I via 21-32 (0-1) n/a 3

YELLOW 4()

an independent oft-site power 4-5 GREEN source different than that for Train B below

2.

"B" SFP cooling pump available with poweravailable from:

G-03 or G-04 via I B42 an independent off-site powver source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW nla OF SE nla OF SFP Average Temp n/a OF SFP Time to Boil n/a Subtotal =

n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

No change from previous shift.

Pmr-I Dea Revisivio 2 1013O0/10 RtetcfCleL NP Is}.6 Ni' 101 I Pai-c 2or9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

DATE:

April 15,2004 TIME:

0400 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EQUIPMENT:

tffM'MENTS:

Fire Protection Condition III: Crediting existing fire rounds'as fire prevention contingency RCS Time to Boil is 51 minutes RCS is at 70% Rcactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-I 562 Revision 2 10/30/02 MerL'Inces: NP 10.3.6 NP 10.2.1 Page 5 of 9