Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 16, 2004 Time:
1400 Preparer:
Andrea Longston U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.
NOTE:
W'heneverfuel has been removed from the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfuelpool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 2890 ppm a.)
For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (ITRM 2.1) >2200 ppm b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE
<2>W (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 2
3-4 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS Tcmperaturcs derived from TE04 and TE06.
RCS TEMIP = 95OF; 13 days shutdown; RCS 695%
Subtotal =
3 RCS Time to Boil 52 min (Applicable at Cold or Refueling Shutdown)
POWER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-O0 or G-021A.05/B-03 available (0-1) 1 G-03 or G-04/A-061B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal 4
INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =
3
'ufos reod*s-eee oil IIII rweod was deleted In accordance Page r
of 9
Acta t
reomo nomt PBF-1562 F0
-Page I of 9 Revision 2 1I030W02
References:
NP 10.3.6 NP 10.2.1
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT
- 1.
Containment integrity (TS 15.11.D) (Containment Operable) (ITS TS 3.6.1) set
- 2.
Containment Closure CL-1E maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SO available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut
( or 4) 0
( or 2) 2 (0-1) 1 Subtotal 0
I 2-3 4-5-6 Condition RED ORANGE
<:E>
(01) 1 Subtotal =
4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)
NOTE:
Take creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04availabiity (*).
Subtotal Condition
- 1.
"A" SFP cooling pump available 0-1 RED with power available from:
2 ORANGE G-02 or G-01 via 2B-32 (0-1) n/a 3
YELLOW
-(*) an independent off-site power 4-5 GREEN source different than that for Train B below
- 2.
WB' SFP cooling pump available with power available from:
G-03 or G-04 via IB-42
- (*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:
NW n/a OF SE n/a OF SFP Average Temp SFP Time to Boil Subtotal =
n/a n/a OF n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
No change from previous shift.
PBF-1562 Revision 2 10/30/02 Retertnces: NP 10.3.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT II.
UNIT:
1 DATE:
April 16, 2004 TIME:
1400 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
POWER AVAILABLE:
INVENTORY:
YELLOW GREEN YELLOW CONTAINMENT:
SFP COOLING:
GREEN NA PROTECTED EOUIPMENT:
-COMMENTS:
Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 52 minutes RCS is at 69 % Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 I130/02 Refrexnces: NP 10.3.6 NP 10.21 Page 5 of 9