Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 16, 2004 Time:

0300 Preparer:

T. R. Branam U

I R

28 NOTE:

Refer to base procedure NP 10.3. 6for safety assessment checklist KSF definltions.

NOTE:

Wheneverfitel has been renjovedfront the reactor vessel and refueling cavity, all key safetyfinctions are GREEN e-rcept spentifielpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2892 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) >2200 ppm b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition (0-1) 1 (0-2) 2 (0-1)

I (0-1) 1 0-1 RED 2

ORANGE 3.4 5

2 Subtotal=

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

I YELLOW

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 f

RCS Temperatures derived from TE04 and TEO6.

RCS TEMP = 95'F; 13 days shutdown; RCS 70%

Subtotal 3

RCS Time to Boil 52 nin (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-021A-051B-03 available (0-1)

I G-03 or G-041A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level >20 percent w/head on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal 3

111101axion in t this record was deleted in accordance with Freedom of Information Act, eeOIA os-10/30102 1`

Pag I of 9 Relcrencms: NP 10.3.6 NP 10.2.1 PBF-1 562 Revision 2

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.l.D) {Containment Operable) {ITSTS3.6.1 set

2.

Containment Closure CL-1E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch

]

installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2-3 4-5-6 Condition RED ORANGE

_ CED_

(0-1)

I Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsitepower source during periods of single X-03 orX-04 availability ()

Subtotal Condition I,

"A" SFP cooling pump available 0-1 RED vith power available from:

2 ORANGE

.G-02 or G-0I via 2B-32 (0-1) n/a 3

YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

(*) an independent-off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Tempe tures:

NW n

OF SE n/a OF SFP Average Temp n/a OF SFP Time to Boil n/a (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a

  • 1 Subtotal =

n/a GIVE A B+IEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

No change from previous shirt.

PBF-562 Revision2 10/30102 Rercrences: NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 16,2004 TIME:

0300 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EQUIPMENT:

'+bMMENTS:

Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boil is 52 minutes RCS is at 70% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision2 10130/02 Rererencs: NP 103.6 NP 10.2.1 Page 5 of 9