1UlR28 Point Beach Nuclear Plant UMR28 OCC Interactive Turnover Meeting Agenda Tuesday April 13, 2004 Start Time:

1800 NSB Cafeteria BRIEFING NOTES ATTENDEES Shift Outage Directors Shift Outage Managers (SOM)

Operations Coordinators (SOC)

Maintenance Coordinators (MOC)

Engineer/ Projects Coordinators (EOM)

Rad Protection Manager (RPM)

Site Safety Coordinator(SSC)

Shutdown Safety Assessor(SSA)

Site Management (SSM)

General Supervisors First Une Supervisors Agenda

1. Safety Issue Discussion (SSC)
2. Radiation Protection (RPM)
3. Operations Coordinator Turnover (SOC)
4. Shutdown Safety Assessment (SSA)

S. Maintenance Coordinator Turnover (MOC)

6. Engineering CoordinatorTurnover (EOM)
7. Major Projects Update (EOM)
8. Schedule Review (SOM)
9. Management Expectations (SSM)
10. ACEMAN Assessment Results (SOM)
11. Shift Goals (SOM)

Items Included In Daily Package:

Site Communication Safety Snippet Outage Alara Report Outage Status Report Shutdown Safety Assessment Outage Schedule Operating Unit Schedule Medium/High Risk Activities Information in this record was deleted in accordance with e Freedom of Information Act, e; eptions '-"

1 FOIA/fj4 1

Site Communication Revised 4/12/04 Priorities:

  • The Safe Operation of Unit 2
  • Safely Commence Scheduled Outage Work Activities on Unit 1 and Common Systems Using Unit I R28 Recovery and Restart Checklist I" Priority Increase RCS Inventory and Exit Safety Assessment "Yellow" Conditions on Core Cooling and Inventory 2nd Priority Focused Specialty Activities

-SG Eddy Current and Sludge Lancing

-Main Turbine and Generator Work

-Rx Vessel Head Inspection

-Hx Hydro Lance and Eddy Current 31d Priority Remaining Scheduled Work Communication Improvement Initiatives Due to the recent problems encountered with outage activities, changes are being made to improve communication and turnovers and to focus our efforts on achieving all green shutdown safety assessment parameters. Effective 4/13/2004 at 0600 the following expectations are in effect:

Outage Briefing Schedule - NSB Cafeteria:

Day Shift Night Shift Activity 0600-0640 1800-1840 OCCTumover**

0645- 0725 1845 - 1925 l Supervisor Communication of OCC Turnover to Work Force l

0730- 0800 1930 -2000 Supervisor Feedback to OCC of Turnover to Work Force

    • Outage Briefing Schedule Notes:

The following personnel are required to attend the OCC turnover meeting:

Upcoming shift supervisory personnel, General Supervisors, temporary supervisors, managers, and other personnel performing in a supervisory capacity for outage activities.

  • Attendance will be taken at the OCC turnover meeting.
  • It is recognized that this will result in longer durations for the outage. Since the safest place to be is on schedule, the outage schedule is being revised to include these meetings.
  • Very few exceptions will be made to the briefing schedule requirement. The OCC will control all exceptions.

Additional Changes:

  • Just in Time Information Sharing identified in the Priority Working Schedule shall be developed and presented for the associated significant task.
  • A responsible Manager will be assigned to selected work activities as directed by the OCC. These managers will monitor the job from pre-job briefing through completion or end of their shift.

These changes are being implemented immediately. Please provide feedback to your supervisor on ways to improve this process.

2

Committed to Nuclear Excellen DLIRIIEY LIF PolNT ERCH

  • UIR2n Point Beach Nuclear Plant U1R28 Refueling Outage

. - -i SafetTopic for eek-ofAprilC11-17th.

Theme for the week This week's theme is Housekeeping. What does housekeeping have to do with safety?

Lots! A clean and orderly workplace is essential to avoid falls, fires and many other kinds of accidents and injuries.

Daily Safety Snippets Sunday "Outage rubble can lead to trouble" On April21, 2001 the Point Beach declared an Unusual Event due to a small fire In the Unit 1 containment building during a refueling outage. The fire was in a bag of rags on the manway platform of the Alpha steam generator in Unit

1. The fire brigade was summoned and put out the fire within about 20 minutes.
  • Monday

'When you clean up hazards, you scrub out accidents" Why Is good housekeeping Important? Just think about it. A clean workplace has less fire hazards, fewer safety hazards and lust plain looks better. A clean workplace promotes pride in your lob.

Tuesday "Improper storing can be more than annoying" What are those yellow cabinets for? Remember to properly store all flammable chemicals In fire cabinets. These should be in properly labeled containers and the storage capacity of the cabinet should never be exceeded.

Wednesday "Avoid a fatal scene; Keep your job site clean" A building contractor died when he was trapped In the burning basement of a house under construction. Another worker was using an oxyacetylene cutting torch to cut I-beams over the basement of the house. Stray sparks set fire to some sawdust and scrap wood used as packing material. The worker escaped and sounded the alarm, however the contractor jumped Into the basement, In a fatal attempt to put the fire out.

Thursday "Ashes to ashes, dust to dust; A clean workplace is a must" At the Pi a couple of years ago during a refueling outage on unit 1, welding sparks Ignited a small fire in some rags In containment. An alert fire watch was able to put out the fire immediately but the fire was preventable with some very basic housekeeping practices.

Friday "bon't be a slob; Clean up after each job" After going through the snippets for this week makes you feel as If you have just gotten a lecture from your mother about keeping your room tidy, that's okay. Mom was rightl Housekeeping Is everyone's job and working together will not only ensure a dean workspace, It will also help to ensure a safe one.

Saturdav "Clean up and care will speed up repair" It is a good practice to assign one coworker as the 'housekeeping conscious on each job. This person Is responsible not to dean up after you but to remind everybody on the job to clean up after themselves. This helps to minimize the gradual buildup of clutter as the lob progresses.

r Y

Point Beach Nuclear Plant Outage 1 R28 DAY Supporting Operational Excellence 9

Path N I Picture Meets Outage Radiation Performance Doesn't MAet Exceeds So-6.lmmM A

  • g IThis indicator measures cumulative dose radiation exposure and total number of personnel-contamination events (PCE's > 5000 cpm) during refueling outages. The dose indicator is measured in Rem and individual PCE events.

Meets:

<=75 Rem Actual Cum.

Exceeds:

<=71 Rem Dose:

22.946 Rem IDay 9 -Apnl 12 1

Actual = 0.312 Cumulative = 22.946 Cumulative Forecast = 31.640 Meets: <=18 Exceeds: <=12 Actual PCE's:

5

__I Stu Thomas I

Personnel Contamination Events Cummulative Dose Exposure 20 18

, 16 C 14 j12 E 10 2

0 i

Ie Ie he' I

Ii

.#I 4

Actual

..Forecast

~'Goal

_9 ID W.

0 W

00 a

03 0

80 II 60 40 412 0 I

....... I-0 2

4 6

8 10 12 14 16 18 20 22 24 26 Actual FForecast Goal 0 2 4 6 8 10 1214 1618 20 22 24 26 28 30 32 34

Conhmitad to NuclearIDlnc e Outage Status Report Plant:

Point Beach Unit I Day:

Tuesday Today's Date/ Time:

4/13/04 /

1600 Outage Duration: Day 10 of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Significant near misses 0

Total for this outage 0

Summary:

Radiological Dose outage to date 22.946 Projected to date 31.640 Outage Goal s75 R Difference

-8.694 Number of PCEs 5

Sumrnmary:

Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

Summary:

Plant Status Mode:

E] Hot Standby (Mode 3)

Lii Hot Shutdown (Mode 4) Cl1 Cold Shutdown (Atode 5)

Z Refueling Shutdown (mode 6)

RCS:

Temperature:

100 Pressure:

Vented to Atmosphere RV Level:

67%

Time to Boll:

48 Minutes Shutdown Safety Assessment Reactivity:

Green Core Cooling:

Yellow Power Availability:

Green Containment:

Green Inventory:

Yellow Spent Fuel Pool Cooling:

N/A Protected Equl ment:

Je Major ActIvities Completed In Last 24 Hours Critical Path and l ear Critical Path Activities (Next 24 Hours)

Polar Crane Checkout Schedule:

Troubleshoot & Repair Z-13 Polar Crane Incore Thimble Withdrawal Activities Required to Exit Yellow Risk Conditions

1) B RCP Motor Move
2)

ORT 15 Fuel Transfer System Checkout

3) Reactor Vessel Head Stud Removal
4) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/20/04 Scott Manthei 4/04/04 IP2A Charging Pump Troubleshooting 4/16104 Clay Hill 4/08/04 K2B Instrument Air Compressor Solenoid Replacement 4/115/04 Jeff Helbing 4/08/04 Incorporate Lessons Learned from I s Reduced Inventory Orange Path 4/18/04 Dave Dyzak 4/08/04 B RCP Motor Oil Sludge 4/13/04 Jim McGough 4/12/04 G.500 Head gasket leak 4/13/04 Clay Hill 4/12/04 SG Wet layup chemicals needed 4/13/04 Randy Richards Upcoming Ma or Milestones Scheduled Actual Scheduled Actual Datel Time Date Time Date

-Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup>2000 4/25/04 l

0900 Head Lift 4/09104 0900 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 Pag5 I of I

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 13,2004 TIME:

1430 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFEP COOLING:

GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EOUIPMENT:

4 Fire Protection Condition III: Crediting existing fire rounds as fire prevention contingency RCS Time to Boii is 48 minutes RCS is at 67% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Revision 2 10130/02 Rerertnces: NP 103.6 NP 10.2.1 Page hoof 9

after 13APR04 12:00 I

U1R28 WORKING SCHEDULE

  • 1 after 13APR04 12:00 U

RESF ST WO EQID DESCRIPTION RD ES EF APR

_R 1

ES EF

_0_22_0__2_

_4_

6_

8__ 0_12_14_16__ 8_20.2210._2._4_6__8_

_12__4._

1 CE44CGATR CE4 77 0303636 IST-SISI REM INSUL FOR FAC PROG-CTMT44 FT GEN AREA 4

04APR04 16:00A 13APR04 15:59 g-b4CGATr *E IVNSEt oi INSqL FOR FAC 1 DARY INSERVICE RNB -C

'ECT MT 44 FT GNw ON0303636 I

REA,

_4

__4 vLNt4ANIEoY CEIRRENT INS EC I

NG-SC1ANEC EPT 76 0301978 SC-GA EDDY CURRENT INSPECT COND (IAN) 34 09APR04 10:OOA 14APR04 21:59 rCOCA (IAN) c DS

_N

~~~"__ ll 1_"CbNDENSER0E4ERAtNG)030I9?7I

_1 10214143H YDl OLANCE SC-1D C

)ENSIR (BOTH W 1

MM0214143 MM2 76 0214143 SC-la HYDROLANCE SC-B CONDENSER (BOTH WATERBOXES) 44 09APR04 11:OOA 17APR04 15:59 IMlZBOXES)

I -.

~ lI I

l X,

T__T_

~_

n

=

i.

ro A600-20E ES IZE,ND CAL UN EFHEA INSPECTIO IE

.UIPENT I

CE-1600-20 CE8 76 0213472 R-1 ENERGIZE AND CAL UNDERHEAD INSPECTION EQUIPMENT 26 13APR04 02:OOA 16APR04 17:59



1 CE44POHSI+

CE4 77 0303636 IST-SISI MODIFY FAC SEISMIC 4

13APR04 13APR04 SCAFF - PAB 44 FT 12:00 15:59 OVERHEAD 1 EM0215236A EM 76 0215236 Z-02491 Z-024B1 PERFORM 4

13APR04 13APR04 CHECKOUT 12:00' 15:59 1

O-RT-015A OPS 77 0215962 O-RT-015 FUEL XFR SYSTEM 8

13APR04 13APR04 (c

CHECK OUT 12:00' 19:59 1

TG-30360 TGG 76 0302153 TG-01-T CLEAN AND INSPECT 10 13APR04 13APR04

  1. 1 AND2 BEARINGS 12:00' 21:59 I

NG-SGX-ASL EPT 76 0301939 HX-001B OFFLOAD SIG SLUDGE 12 13APR04 13APR04 LANCE EQUIPMENT 12:00' 23:59 1

MM0214093 MM2 76 0214093 HX-048 HX-048 - HYDROLANCE 10 13APR04 14APR04 CLEAN GLAND STEAM 15:00' 14:59 1

MM0214079 MM2 76 0214079 HX-020A HX-20A, HYDROLANCE 30 13APR04 16APR04 CLEAN UP FEEDWATER 15:00' 14:59 HEATER

_______A_______ _ ]_.._

ANEBHSl4

=SEC

  • 0236A Col tWP: Contf

-30360PLE

mSGX!SLt ZWP
A&B 40IM II021f4jH I

I Ann.Ac.F1 IFY FAC SEISMIC DARI INSERVICE EIl PERFORM Ct NMENT FUEL UPI kFR iYSTEM CHE FUEL MANIPULAT ent G"neral Area h AND NSPECT #1 MHIGH PRESSU LASIG SLUDC

!FSTEAM GE I PZR General M 18 - HYiDROLANCE S~C INS ECI

~ND afni RE' CL

%FF.

'ECI coul IER02

)UT

UEL enanv 2 BI lIRE kNCE ATO nanc AN PAB 44 FT C ON0303636 5236 TRANSFER i ARINGS NE0302153 EQUIPMENT t0301939 LAND STEA AI, mlE Ys HEAD EM IHECKOUT0l I1A11 15912

- a ME.

In d bfl!

1 A4Anr k C-2p

_uwu 1t wvucl<7cnu41u

=--I

-AN I P FEEDWATl EATER I

I I

I I

I.

-t

, PA

===w ini t!IJRiWNT TFET 5 TPAU E

NERATAR A&

1-I EP0301956 EPT 76 0301956 HX-001A EDDY CURRENT TEST STEAM GENERATOR A 133 13APR04 15:00' 19APR04 03:59 UJUI

  • I

.I 03 01957E(

CURRENT TESTE TEJ MG NERATOR E J

I EP0301957 I EPT 76 0301957 HX-001B EDDY CURRENT TEST 1133 13APR04 STEAM GENERATOR B. I 15:00' 19APR04 03:59 I.1 I I I.

_I

/

Run Date 13APR04 15:32 LT-51 PRIORITY PUBLICATION-ES Sheet 1 of 8 0 Primavera Systems, Inc.

I FL-50 Priority Publication S

after 13APR04 12:00 U1R28 WORKING SCHEDULE I

after 13APR04 12:00 U

ID RESP WO WO EQID DESCRIPTION RD ES EF APR I

ST EI I

I12,14,1Q.18J20.221 0.2 4

J 6

14 16, 818772,22 0.L 2.

4 1 6 ; A,IO iu12 14,161 I

PM-BRIEF1 ADM ADMIN OCC INTERACTIVE TURNOVER and FOLLOWUP 2

13APR04 18:00 13APR04 19:59 1

T-0711-H WCC 0010711 Z-024A I RC Z-24A RMP-9096 I

13APR04 13APR04 MM REVO-1 20:00 20:59 1

T-8402-H WCC 001840Z Z-024A 1 FH Z-24A RP-1A OPS 1

13APR04 13APR04 REV1-3 20:00 20:59 1 Z13-PREJOB EM Z-013 Z-013 PREJOB BREIF I

13APR04 13APR04 FOR TIS AND REPAIR 20:00 20:59 1

OP0215233 OPS 76 0215233 Z-016 PERFORM 2

13APR04 13APR04 MANIPULATOR PMT 20:00 21:59 1

TG-30490 TGG 76 0302153 TG-01-T REMOVE STEAM GLD 2

13APR04 13APR04 SEGMENTS-OUTER 20:00 21:59 GLAND-PT2 L

TG-30650 TGG 76 0302153 TG-01lT REMOVE HP 3

13APR04 13APR04 HORIZONTAL JOINT 20:00 22:59 BOLT STUDS-PT2 1

TG-30410 TGG 76 0302153 TG-01-T CLEAN/INSPECT GOV 4

13APR04 13APR04 PED OIL SEAL &

20:00 23:59 ENDCOVER-PT2 1

TG0215002 TGG 76 0215002 HX-054A HX.54A - INSTALL NEW 6 13APR04 14APR04 EH COOLER 20:00-01:59 I

TG0215004 TGG 76 0215004 HX-054B HX-54B - INSTALL NEW 6

13APR04 14APR04 EH COOLER 20:00 01:59 I

TG-30240 TGG 76 0302153 TG-01-T CLEAN I INSPECT 10 13APR04 14APR04 GOVERNOR PEDESTAL 20:00' 09:59 1

TG-30615 TGG 76 0302153 TG-01-T PERFROM REPAIRS TO 10 13APR04 14APR04 CYLINDER BASED ON 20:00 09:59 INSPECTION 2M-BRIEF' T-07 0011 T-84i 0011 Z13-PRE OP021!

021 TG-31 030:

TG-31

030, TG431 030 TGO21 021!

TG021I 021!

TG-3d 030 TG-3d 030 TG-31 INTtRACTIVE TI I RC Z-24A RMP-9 I1 Rg Z-24A RMP I F Z-24A RP-IA

!-013 PREJOB BR

_I:

PERF1ORM MANIPI

  • RhACTOR CA\\

REMQVE STEAM MHIGH PRESSU IEM15VE HP HORI "HIGH PRESS LEANA!NSPECT

_HIGH PRE!

'IXN54A STA1 ME,~EU-CTI 4X-54B - INSTAU

_EECT LEAN I INSPECT PERF!ROM REPAIF

LEAN GOVERNC 7VE MM f 6MN RE%

FOR r OR MAN SEG URB ITAL

TUF PED

~E Tn EN 1IYDF N EH

-IVF VERM O CY EDES and FOLLOI EVo-1 REVO-1 1-3 75 AND REF

'MT PULATOR AENTS -O NE JOINT BOLT BINE OIL SEAL &

RBINE COOLER AULIC FLUI COOLER WULIC FLUIC OR PEDEST, GH PRESSL JNDER BAS GH PRESSL TAL BASE-P LAlMD-PT2 DS-142 COVER-PT2 DLEF DIER rURBINE IN IN$PECTION URBINE I

TG-30695 TGGI 76 0302153 TG-01-T CLEAN GOVERNOR 1 20 13APRW4 I 14APR04 PEDESTAL BASE-PT2 I 1 20:00 1 19:59

_t 030 15:

_l_

IIPIIG:PRESSURE I iriRiNi-II T

I

.7r" -

.I.

I Run Date 13APR04 15:32l LT-51 PRIORITY PUBLICATION-ES Sheet 2 of 8 O Primavera Systems. Inc.

I FL-50 Priority Publication l

after 13APRO4 12:00 1

U1R28 WORKING SCHEDULE I

after 13APRO4 12.00 U I ID

'RES STO WO I

EQID I

DESCRIPTION IRI ES I

EF 114APR 5

______120__22_0__2___4 16.1_8.2__72_I I

, 2_ 4I L6

~

8,1002114,16

-~

_J__

_12___14_

1611____6__

RDI1 4

?4 02Z.1L

~

1 1

TG0302151 TGG 76 0302151 TG-01 AUTOSTOP OIL RELIEF VALVES OVERHAUL 20 13APR04 20:00' 14APR04 19:59 TG030:

030 TG99491 1 54At~STOP OIL R~I.14F VALES OVERlqAU1

._11 Etl

_A2 02h 'PI hEPLACE E) TR lCTIC N BELLOWS I

TURBINE GENERI

HTS)

TOl t(GE 4ERIC: SEE I I

TG9949102N TGG 76 9949102 TG-01-TI LPI-REPLACE 85 13APR04 23APR04 EXTRACTION BELLOW 20:00 00:59 (NIGHTS) 1 TGSUPPORT TGG TG-01-T PROVIDE CRANE.

279 13APR04 29APR04 RIGGER, AND 20:00 18:59 TOOLROOM SUPPORT(PT2) 1 EM0407780 EM 0407780 Z-013 Z-013 PERFORM 8

13APR04 14APR04 TROUBLESHOOTING 21:00 04:59 AND REPAIR 1

TG-30511 TGG 76 0302153 TG-01-T LEWNSPECTIREPAI 10 13APR04 14APR04 OUTER STEAM GLAND 22:00 11:59 CASINGS 1

TG-30630 TGG 76 0302153 TG-01-T NDE HP NOZZLE 8

14APR04 14APR04 BLOCK IN-PLACE 02:00 13:59 1

MM-8480C3 MM1 76 0214134 R-1 REMOVE REMAINING 4

14APR04 14APR04 STUDS I CLOSE STUD 05:00 08:59 HOLES 1

TG-30470 TGG 76 0302153 TG-01-T PERFORM HP SPINDLE 60 14APR04 18APR04 ROTOR BORE 05:00 16:59 INSPECTION-PT2 1

AM-BRIEF2 ADM OCC INTERACTIVE 2

14APR04 14APR04 TURNOVER and 06:00' 07:59 FOLLOWUP I

IT300BRIEF OPS PRE JOB BRIEF FOR I

14APR04 14APR04 ITr300A 08:00' 08:59 1

EZMRCP-K1 EM 76 0215205 P-oo1B-M JIT INFO SHARING FOR 2 14APR04 14APR04 P-lB MOTOR LIFT 08:00 09:59 1

T-8370-H WCC 0018370 RMP 1 CW RMP 9155-1 CE 2

14APR04 14APR04 REV0-2 08:00 09:59 I994diD Um4--

TGSUPP 377' 377T

'ROVIDE CRANE. RIC GER. AND TOOLF 001AI SUPIPORT(PT21

L'



I EMo4 04 T,

I-51jjLE!N1INSPE' TiR3UBL EPAI ESHOOTING 1 OUTER ST AN

-e

_-L-w lqlv

~

~

r,

_o TG.a0630NDE Hi 03O02153*

MM.8480C3R 0214134

, TG-304701' I

0302153 IIAM-BRIEF.

8 IT300BI EZMRCI 021!

T-83 II 0011 TG00 030:

.N(

.RF IZZLI IVE I IRE DRM BLOCK IN4 WHIGHF EMAINING S FCTOR VESE hP SPINDLE LA(

RE' rut EL RO

) RE0AIR GLAND CASING!

IE TR3RBINE

E SURE TURBINE SI CLOSE STUD KND /SSEMBLY OR BORE INSPE(

OL li1c ES N4PT

  • mi -

imi -

u

'Cl lET

-KI 20!

37t I5 INTl PRE.

R RWP ICW DUSI NH

.RACTIVE Tl OB BRIEF F FO SHARINC

-ACTOR CO, RCP Seal M; RMP 9155.1 CW RMP 91i BLAST INNE GH PRESSU R1b inti

't~

)VEIg and FOLLOI r.3O R P-1B MOTOR Ll IT PtMP MOTOR nance tEV042

-E RV0-2 EAMGLAND CAS TURBINE VUF ING I

TG-30soo TGG 76 0302153 TG-01.T DUSTBLAST INNER STEAM GLAND CASINGS-PT2 2

14APR04 08:00 14APR04 09:59 1I._

I_

.I..L Run Date 13APR04 15:321 LT-51 PRIORITY PUBLICATION-ES Sheet 3 of 8 0 Prlmavera Systems, Inc.

I FL-50 Priority Publication I

after 13APR04 12:00 I

U1R28 WORKING SCHEDULE I

after 13APR04 12:00 U

ID RESP WO WO EQID DESCRIPTION RD1 ES AEF I

APR ST S

E 113

.24_6__

_1__

_ _ _ _ _ _ _ _ _ _ _ _ _ _ __0_._24

_ _ _ _8_1__

1 rr-300ASMP CH HX-001A SAMPLE SIG HX-1A PER IT-300A 3

14APR04 08:00-14APR04 10:59 I

TG9919338 TGG 76 9919338 PIPING EB-MS-2751 - REALIGN 14 14APR04 15APR04 PIPING DOWNSTREAM 08:00 11:59 OF VALVE-PT2 1

TG0302135 TGG 76 0302135 MS-02033-O MS-2033 -OVERHAUL 22 14APR04 16APR04 LH GOV VALVE 08:00 09:59 OPERATOR 1

TG0302133 TGG 76 0302133 MS-02026 MS-2026 - OVERHAUL 45 14APR04 19APR04 LH STOP VALVE.PT2 08:00 12:59 1

TG0302134 TGG 76 0302134 MS-02027 MS-2027 - OVERHAUL 49 14APR04 19APR04 RH STOP VALVE-PT2 08:00 16:59 1

IC0400553A tC1 76 0400553 SERVICE SERVICE MAINT 40 14APR04 20APR04 SUPPORT-EQ 08:00' 07:59 VERIFYING I

TG9949102D TGG 76 9949102 TG-01-T1 LPI-REPLACE 80 14APR04 23APR04 EXTRACTION BELLOWS 08:00 07:59 (DAYS-PT2 1

MM-8480RA MMI 76 0214134 R-1 JIT INFO SHARING, I

14APR04 14APR04 CAVITY SEAL RING &

09:00-09:59 TOP HAT 1

MM-8480RB MM1 76 0214134 R-1 IPTE BRIEF. INSTALL I

14APR04 14APR04 CAVITY SEAL RING &

10:00 10:59 TOP HAT 1

EZMRCP-K2 EM 76 0215205 P-001B-M P-1B PRE-JOB BRIEF 2

14APR04 14APR04 FOR MOTOR MOVE 10:00 11:59 1

TG-30510 TGG 76 0302153 TG-01-T CLEAN I INSPECT 4

14APR04 14APR04 INNER STEAM GLAND 10:00 13:59 CASINGS I

TG-30600 TGG 76 0302153 TC-01-T INSPECT HP TURBINE 4

14APR04 14APR04 EXHAUST PIPING 10:00 13:59 IT-31 TG!

TGI TGI TGI MI 00A 991 3I 331 SAMI MS.2 ILE SIG HX-1 h SG MAIN F

'51 - REAUG AP EEE N

P

-R IT4,300A LINq CHECK VAL PING'.DOWNSTRE BM (COI DF V)'

D SHUTDOV LVE-PT2 991 3t _

IIMAIN STE 030 3! US-2 33-OVERH U LHGOVVALVE H

TOI 33 3!

030 13 U-2 26. OVER U LH S#OP VALVE4 m 030 13 __ _ __

030 1 S-2 27-OVER kU RH STOP VALVE-n

030, 13

= __

100 53 SE ICE MAINT UP ORT;EQ VERIFYI G.

340C 55

.:re-3perved tech ST - Restart CL no !

'dr l 149 2

P-tEPLACE OCTICN BELLOWS (D S) 994 t0 _la_

MM8 7:

mm 134 R

'510C I s4.

'6001 1 s A

.300P 15904 INFO SHARI FACTOR VE!

TE BRIEF. I REACTOR V l1B PRE-JOE EREACTOR NP: RCP Se.

LEAN I INSPI HIGH F SPECT HPT

_HIGH F ILL S/G HX A SGIV lG, SE S.T

  • ST SS BR I.O CT RE' URIE IA AIN CAVITY SEAL RIN AND ASSEMBLY kLL (AVITY SEAL TL AND ASSEMBL EF FbR MOTOR A

)LANt PUMP MOT Inten4nce INNER STEAM GL SURE TURBINE INE OHAUST PIF SURI TURBINE FOR 4T-300A FEE6 LINE CHECI GI&

Rib~

'OV

~NN ING I:V 1

TOP

&I CAS

`AT OP HAT NGS 1

IT-300A OPS 77 0215904 1 o-Tr-0300A FILL SIG HX-1A FOR IT-300A 3

14APR04 14APR04 11:00 W

13:59 LVEq (COD SHU

~

L ___ ___ ____

I. ___ ____ ___ ___ ____ __

tI l

l l {

l Run Date 13APR04 15:32i LT-51 PRIORITY PUBLICATION-ES Sheet 4 of 8 O Primavera Systems, Inc.

I FL-50 Priority Publicatlon T

after 13APR04 12:00 U1R28 WORKING SCHEDULE I

after 13APR04 12:00 U

ID RES WO EQID DESCRIPTION RD ES EF I

APR

.D I

III II_0112_14_16*

68_

_1416_18_20.221 0

  • 2 *_4 I 6_

8, 10112_14_16 1

TG-30580 TGG 76 0302153 TG-01-T MEASURE HP OUTER STM GLD CLEARANCES 2

14APR04 12:00 14APR04 13:59 I

EZMRCP-K EM 76 0215205 P-001B-M P1B MOVE MOTOR 6

14APR04 14APR04 FROM PUMP TO STAND 12 00' 17:59 1

IT-300AB OPS 77 0215904 O-IT-0300A PRESSURIZE S/G 2

14APR04 14APR04 HX-IA TO 100 PSIG 14:00 15:59 FOR IT-300A 1

TG-30620 TGG 76 0302153 TG-01-T FINAL CLEAN NO771Z 15 14APR04 15APR04 BLOCK IN-PLACE 14:00 08:59 I

TG-30590 TGG 76 0302153 TG-01-T BLUE CHECK LOWER 16 14APR04 1SAPR04 HALF OUTER STEAM 14:00-09:59 GLAND CASINGS 1

IC10.1OA IC 76 0300885 ICP-10.010 A S/G INSTRUMENT 5

14APR04 14APR04 BLOWDOWN 16:00 20:59 1

PM-BRIEF2 ADM OCC INTERACTIVE 2

14APR04 14APR04 TURNOVER and 18:00-19:59 FOLLOWUP 1

T-9697-R WCC 0009697 HX-001B 1 MS HX-18 WLU MMV 2

14APR04 14APR04 REVO-1 20:00 21:59 1

MM-8480R1 MMI 76 0214134 R-1 INSTALL CAVIlY SEAL 4

14APR04 14APR04 RING 20:00 23:59 1

IT-300Ai OPS 77 0215904 O-IT-0300A RAISE SIG A PRESS TO I 14APR04 14APR04 500 PSIG IAW IT-3W0A 21:00 21:59 1

RP1D-005 OPS O-RP-001D ESTABLISH RP ID 4

14APRo4 15APR04 INITIAL CONDIONS 21:00 00:59 1

IT-300A2 OPS 77 0215904 O-IT-0300A SEAT LEAKAGE TEST 3

14APR04 15APR04 OF CS-466AA &

22:00 00:59 CS-466BB I

I II II II II II I

II I

I T

-305 3021 IRCP 2152 IT-0 TG.

O:

TG S~WHIGH P RWP: RCP

~00AIJRESS 30c20F1jAl_ 4

-'P Mc 5e.

)RI 3 h

,LE 3UTE)l STM GLD t

,SURIp TURBINE I

TOR ~ROM PUMP kCTOX COOLANT I MaIntenance

'E StB HX.IA TO AIN FEED LINE Cl-AN N6)ZZLE BLOC L E ro EC cit 4RANCES MTAN P MC TOR PSI FOR IT.300)

VAL JES (COLD

PLA E 1h71I PPF
qqt Ir

. ___S 0 5 90 BLUE HE:K LOWER HALF 0 m

R ST z

0313215 Hi C100.1 0AA S 030088U PM-BRIEFP T.96 000!

MM4W 021.

IT.

02 RP1 IT-3 1sTRpMENT BLOM ESG TRANSMI1M INT1RACTIVE TU 1 MS HX1 B WLUI t MS HX-11B W INSTALL CAVITY

_EREACTOR 1jRAISE S/G A PRE

).A:SG MAIN FE

£ssrABUSH RP1 A2StAT LEAKAG 904A SG MA

MPSAMPLE SIG

_A SO MA

,BU(

VER REY L

RIN SEL TO SC INE mAL s a zED I 3 PEI

-ED I IAM GLAND I-GH PRESSU WOOWN, Fl1 nd FOLLOW 1EV0.1 ND ASSEME o PSIG IAW I HECK VALV CONDION!

TCS-4SAA 1 INE CHECK IT-300O INE CHECK' I

IT-300BSMP CH 0-iT-0300A SAMPLE SIG HX-1B PER IT-3008 3

14APR04 15APR04 22:00-00:59 I'

I I

I J

3 j

1 j

.I I

II I

I L

I Run Date 13APR04 15:32 l

LT.51 PRIORITY PUBLICATION-ES O Primavera Svstems, In.

I FL-50 Priority Publication I

after 13APR04 12:00 U1R28 WORKING SCHEDULE after 13APR04 12:00 U

RESF WO WO I

EQID DESCRIPTION RD ES I

EF 14 15

_ST

.1_0112.14,16,18i20,22i 0. 2. 4-16 1 8.10012,14.1681820.922l 0 2.41 6 ; 8.10112.14.16 I

NG-SClANRV EPT 76 0301978 SC-1A SC-IA - EDDY CURRENT REVIEW I RERUN (1AN) 12 14APR04 22:00 15APR04 09:59 1 NG-SCIASEC EPT 76 0301978 SC-1A EDDY CURRENT 24 14APR04 15APRO4 INSPECT COND (lAS) 2200 21:59 t

MM-8480R2 MMI 76 0214134 R-1 CHECK SANDBOX &

I 15APR04 15APR04 TOP HAT COVER BOLT 00:00 00:59 TOROUE I

IT300ABR OPS HX-001B PRE JOB BRIEF FOR I

15APR04 15APR04 IT-300B 01:00 01:59 1

RPID-010 OPS O-RP-001D FILL LOWER CAVITY 10 15APR04 15APR04 01:00 10:59 1

IT-300B OPS 77 0215905 O-IT-0300B FILL B SIG TO MSIV 6

15APR04 15APR04 AND PRESSURIZE TO 02:00 07:59 100 PSIG 1

CAMP-113A CH HX-001A CAMP-113 SAMPLE A 3

15APR04 15APR04 STEAM GENERATOR 03:00 05:59 (NO SPARGE) 1 AM-BRIEF3 ADM OCC INTERACTIVE 2

15APR04 15APR04 TURNOVER and 06:00-07:59 FOLLOWUP 1

CAVFILLJIT OPS 77 0215926 O-IT-0760 JIT INFO SHARING FOR 1

15APR04 15APR04 CAVITY FILL & IT-760 08:00 08:59 1

0123A-10 OPS 01 -23A INSTALL PORTABLE 3

15APR04 15APR04 CAVITY FILTER UNIT 08:00 10:59 (TRI-NUKE) 1 O023A-15 EM OP-23A PHASE CHECK AND 3

15APR04 15APR04 START TRI NUKE 08:00 10:59 FILTRATION UNIT I

IC10.1OB IC 76 0300885 ICP-10.010 B SIG INSTRUMENT 5

15APR04 15APR04 SLOWDOWN 08:00 12:59 II I

II II I

I II I

I II II NG-SI NG-SI C301

1lA -Ecj~bDY CURREIN qENT NC SPEC REVIEW tRE

)NDENSER T COND (AI 3C

'fiEEP U P -

AM.

I I

U8~0*CHECK SAI 2141345REACTOI T300*BIRRE JOB tP1Dl010IGLL Loy IT'r300BFILL B3 021590e~

CA1~hP-1 3ACAMT IAM-BRIEF:

CAVFIL 021!

0123i 01231 ICIa.

030C TG-3(

030; D~x &

SSEl EF F4 CAVI M

ro M.

3 SG ISAI INTI I IT IN EUNI NSTA

'HAS 3 SrG MUS rOP HAT CO AND ASSE IR IT-300B ULL LOWER IV AND PRE MIAIN FEED I PLE A STEA RACTntE TU O SHARING r 1 HIGH HE LL PORTABI NSTALLICOi CHECK AN NSTALUCO INSTRUMEN MSG TRAh 3LAST THE I

TG-30460 TGG 76 0302153 1 TG-01-T DUSTBLAST THE HP BLADE RINGS 9 I 15APR04 I 15APR04 08:00 16:59 L

A.

.IL L

£ *...-4.L......

Run Date 13APR04 15:321 LT-51 PRIORITY PUBLICATION-ES Sheet 6 of 8 C Prmavera Systems, Inc.

I FL-50 Priority Publication T

after 13APR04 12:00 l

U1R28 WORKING SCHEDULE I

after 13APR04 12:00 U I ID

_RESP ST WO EQID DESCRIPTION RD ES EF I

1 14 15 ST

_0 Q12.14.16,18,20,221 0. 2. 4 - 6. 8.10i12, 4.16.18.20.221 0. 2.4 1 6, f8.IQ 112.14.16 I

MM0214089 MM2 76 0214089 HX-024 HX-24. HYDROLANCE CLEAN CONDENSATE COOLER 10 15APR04 08:00o 16APR04 07:59 MMO21.

021.

1 EP0301963 EPT 76 0301963 HX-021A HX-021A - EDDY 36 1SAPR04 16APRo4 CURRENT INSPECT SA 08:00-19:59 LP FW HEATER 1

IT760-BRF OPS 77 0215926 O-IT-0760 BRIEF PRIOR TO HH SI 1

15APR04 15APR04 CHECK FULL FLOW 09:00 09:59 TEST PREPS 1

TG-30625 TGG 76 0302153 TG-01-T OBTAIN TIGHT-WIRE 20 15APR04 16APR04 MEASUREMENTS OF 09:00 08:59 HP CYLINDER 1

MM-8480D3 MMI 76 0214134 R-1 JIT INFO SHARING 2

15APR04 15APRO4 PRIOR TO HEAD LIFT 10:00 11:59 I

IT-760-A OPS 77 0215926 O-IT-0760 HIGH HEAD SI CHECK 6

15APRO4 15APR04 FULL FLOW TEST 10:00 15:59 PREPS 1

TG-30520 TGG 76 0302153 TG-01-T MEASURE HP INNER 16 15APRO4 16APR04 is STEAM GLAND 10:00 01:59 CASINGS I

RP1A-052 OPS O-RP-001A SET CLOSURE FOR 3

15APR04 15APR04 REACTOR HEAD LIFT 11:00 13:59 I

MM-8480D MM1 76 0214134 R-1 IPTE BRIEF FOR HEAD 2

15APR04 15APR04 LIFT 12:00 13:59 1

EM-8480D EM 76 0214134 R-1 DISCONNECT PATCH 1

15APR04 15APR04 CABLES FOR 13:00 13:59 DEDICATED T=S I

MM-8485B1 MM3 76 0214119 P-oo1B PLACE BACKSEAT I

15APR04 15APR04 COLLECTION SYS IN 13:00 13:59 SERVICE (8 FT.)

1 NRC-CALL-7 ADM MILESTONE O.D. CALL NRC TO T

15APR04 15APRO4 WITNESS REACTOR 13:00 13:59 HEAD LIFT EP030 030 IT76 02 TG MM IT X-2O.

HYDRoLAI HX402 IA - EDDY C FBRI -F PRIOR TC U IIT iHIGH -

'OB AIN TIGHT-V 3I D3J I INFO SHAS I

REACTOR

'o GH HEADSI 520M SURE HP 153-A-05: SET CLOSUF

_PREPA 1J348 DIPTE BRIEf 2141 REACT M84 aoDISCON?

021 134REACT 684 5BIPLACE B 021 119lREACT

.-CA L70.D. CAL IT-3J 1 RAISE B 021 905B SG 1I IT-300B1 OPS 77 0215905 1 O-IT-0300B RAISE B SIG TO 500 PSIG IAW IT-3008 2

15APR04 I 15APR04 13:00 14:59 Run Date 13APR04 15:321 LT-51 PRIORITY PUBLICATION-ES Sheet 7 of 8 PIP O Pd~mavera Systerns, Inc.

I FL-50 Priority Publication

after 13APR04 12:00 I

U1R28 WORKING SCHEDULE after 13APR04 12:00 U

to RESP WO WO EQID DESCRIPTION RD ES EF 13 14 15 ST II 12.14.16 2

20.2210

  • 2. 4 8112j1416 20i221 8

A.

i12.14.16 1

T-3426-H WCC 0013426 P-O0tB I RC P-10i RMP 2

15APR04 15APR04 T-3 126-H1 RC Fl 90024/119 MM REVO-1 14:00 15:59 100 342<1 R 1

MM-8480D1 MM1 76 0214134 R-1 MOVE REACTOR 4

15APR04 15APRo4

.M 80D1MOVE I VESSELHEADTO 14:00 17:59 02 413 RHLDA0243 RWP: F 1

IT-30082 OPS 77 0215905 O-IT-0300B CS-476AA & CS-476-BB 3

15APR04 15APR04 SEAT LEAKAGE TEST 15:00 17:59

.21590 1

0156-020 OPS 01-56 FIULTRANSFERCANAL 16 15APRO04 16APR04 C 156-42OFILLE 15:00 06:59 1

HEADUFT PPG MILESTONE REACTOR VESSEL 0

15APR04

.H ADUFT RE HEAD UFT 1_:00 1

RP4A-030 EM O-RP-004A CLEAR WALKWAY FOR 2 1SAPR04 15APR04

.P4A.030CU MANIPULATOR 16:00 17:59 I

[T-760-8 OPS 77 0215926 O-IT-0760 HIGH HEAD Si CHECK 4

15APR04 15APR04 760.8HIG FULL FLOW TEST 16:00 19:59

.T.6021592 I

RPIA-060 OPS O-RP401A FILL CAVITY FOR ROD 4

15APR04 15APR04 PIA-OW1U UNLATCH 16:00 19:59 TG.30540 TGG 76 0302153 TG-01-T CLEAN / INSPECT HP 10 15APR04 16APR04 TG-30540C BLADE RINGS 17:00 02:59 0302154 Run Date 13APR04 15:32l LT-51 PRIORITY PUBUCATION-ES Shoet 8 of 8 C Primavera Systems, Inc I

FL-50 Priority Publication I

after 13APR04 12:00 I

WORKWEEK SCHEDULE 1-thru 14APR04 0500 U

ID RESPlT WO EQID DESCRIPTION lRD ES EF I

RISK ResrC3 APR Il YI ST IIID 1.6. 8.10112.14.16.18.20220. 2. 4 6. 810214,16j1820221 01214. 6 ;

0 CE0210986 CE6 77 SEC SECSUPPORTrMR 123 05APR04 04MAY04 DR-N ML-N 928 E 2q ECSUPPORTMR99-011*B 99-0111B 07:W0A 14:59 ORT3-NR-L rn-appo tech spc ST - Restart CLn req'd O

CE0210989 CES 75 SEC SEC. INSTALLNEW 123 05APR04 04MAY04 DR-N ML-N 926 rE EC INS#ALLNEW EQUIPM 99-011*E EQUIP MR 99-0tE 07:OOA 14:59 ORT3-N R-L pp tech spec ST - Restart CL rerq'de*

2 CH0300510 CH 7

H EM-SAMPI RCS DO TSR 3A.5.1 48 11APR04 17APR04 DR-N ML-N CS DO tSR 3a.5.1 05:OOA 11:59 ORT3-N R-L app tech spbc ST-Restart CL nc rq'deq 2

CH0300497 CH 77 EM-SAMPI RCS CL TSR 3.4.52 48 11APR04 17APR04 DR-N ML-N CS CL OSR 3.452 07:OOA 1 1:59 ORT3-N R-L____

pp techspc ST - Restart CL rc reqd 1

CH0300357 CH 77 EM-SAMPL RCS CL TSR 3.4.5.2 48 12APR4 17APR04 DR-N ML-N R 3A.5.1 05:W0A 11:59 ORT3-N R-L re-app tech spec ST - Restart CL nq reqd 1

CH0300370 CH i 77

,HEM-SAMPt RCS DO TSR 3.4.5.1 48 12APR04 17APR04 DR-N ML-N C DO pSR 3_.5.1 05:OOA 11:59 ORT3-N R-L pp I tech spc ST - Restart CL neqt n'd 1

CH0300400 CH 77 n HEM-SAMPL RCS BORON SR 3.9.1 7

48 12APR04 17APR04 DR-N ML-N CS BORON SR 3.9.1.1 05:OOA 11:59 ORT3-N R-L _

re-app tech spic ST - Restart CL nret reqd 0

CH0300194 CH 77 M-APt BAST BORON TSR 27 12APR04 15APR04 DR-N ML-N H0300194 T BRON T'SR 3.5.1.2 3.5.1.2 07:OOA 14:59 ORT3-N R-L re-app tech spec ST - Restart CL nc t reqNd 2

CH0300523 CH 77 M-SAMPI SGDFO GAMMA SCAN 27 12APRO4 16APR04 DR-N ML-N OBFO GAMMA SCAN 07:OOA 14:59 ORT3-N R-L 0

_re-app tech spec ST - Restart CL rKqt r,'d E

414s1EiI I I"l1l111l11.,l11 2

CH0300549 CH 77 EM-SAMP RE-229 ISOTOPIC 27 12APR04 l1APR04 DR-N ML-N 4

HE030S20 IOTOPIC 07:OOA 14:59 ORT3-N R-L p P tech sp ec ST - Restart CL n reqrd 0

EM0305201 EM 76 125V STATION TECH SPEC I

13APR04 13APR04 DR-N ML-N 420,44 M030

TAT, TECH SPEC 1A IES WEEKLY BATTERIES WEEKLY 10:OOA 12:59 ORT3-N R-M 0350 r2Z5OV SYSTEM MULTI ADR NON-NUMBERED EQUIPMENT 0

EM0309069 M

76 D-105 WEEKLYSTATION

.3 13APR04 13APR04 DR-N ML-N EM03090 9WEEKLY STATION BATTE INSPECTION BATTERYINSPECTION 13:00'

.15:59 ORT3-NR-M 03090 inI5VDCSTATION RY j___

.Pre-aptroved tech spec ST Restart CL not reqd:

Run Date 13APR04 15:37i LT-52 WORKWEEK ACTIVMES DURING U1R28 Sheet I of 3 O Primavera Systems. Inc.

FL-52 Workweek Activities during U1R28

after 13APR04 12:00 WORKWEEK SCHEDULE thm 14APR04 0500 U

D RESPlTl WO EOID DESCRIPT1ON J.RD ES EF RISK Resrce APR I

314

_Y ST l.6 8 1002 14.16,18,20,221 0 2. 4 6. 8 10112.14,16,18.20.221 0. 2 0

EM0309133 EM P 76 D-106 WEEKLY STATION 3

13APR04 13APR04 DR-Y ML-Y 20.44 EM 0913 3WEEKLY STATION B TIERY INSPECTION BATTERY INSPECTION 16:00 18:59 ORT3-N R-M 0913M125V DC STAnN BATTERY I

I Pre-approved tech spe ST-Restart CL not eq'd

-. I m I ff:e Z1 e

_1_l_

0 EP0306798 EPI 77 SERVICE FLAMMABLE STORAGE I

15APR04 15APR04 DR-Y ML.Y EP030679:jAM BLE S LOCKER INSPECTION 00:00-00:59 ORT3-Y R-L

, EP030679 MISC BuLp

_ 1 Preap__

ti O FG0309950 FG3 P 77 SERVICE FLAMMABLE STORAGE 24 14APR04 15APR04 DR-Y ML-Y 453 FG030995 'LMMABLE STO GE CABINET INSPE ON CABINET INSPECTION 05:00' 16:59 ORT3-Y R-L 030995C ___5._Lt q

OUTSIDE PA-

~~re-approved tech spec ST - Restart CLtred O

FG0309945 FG3 P 77 SERVICE FLAMMABLE STORAGE 24 15APR04 16APR04 DR-Y ML-Y 4 53 FG030994 M

CABINET INSPECTION 05:00' 16:59 ORT3-Y R-L 0309 INSIDE PA 0309 0

RE-234-B04 HP HP RMS RE-234/235 AIR I

14APR04 14APR04 DR-Y ML-Y RMS RE-234-B04RE-234I235 AIR SAM PLE C SAMPLE CHANGE OUT 17:00-17:59 ORT3-Y R-L

'pre-approved tech s ec ST O

RE-211-B04 HP l HPRMS RE-211/212AIR l I 15APR04 15APR04 DR-Y ML-Y RMS

'RE-211-B04RE-211 t12 AI SAMPLE CHANGE OUT 00:00 00:59 ORT3-Y R-L.

Pre-app vedt 0

HP0301850 HP P

77 HPRMS QUARTERLY 16 15APR04 15APR04 DR-Y ML-Y HP03018S UAR FUNCTIONAL TEST OF 05:00-20:59 ORT3-Y R-L 030185

-RMS031 I. I-I -

U

~ra 0

IC0213607 ICI 'P 77 Z-107H EXPLOSIVE DETECTOR 1

14APR04 14APR04 DR-Y ML-Y 330 l IC02 3607EXPLOSIVE D9TECTOR CLEANIN CLEANING 08:00 08:59 ORT3-Y R-L 02 36073PORTABLE E"(PLOSIVES DETEC OR I

.Pre-approved te h spec ST - Restart L not 0

IC0300670 IC1 IP 77 Z-107H REPLACE MEMBRANE 1

14APR04 14APR04 DR-Y ML-Y 330 IC03 06TOREPLACE MEMBRANE 08:00W 08:59 ORT3-Y R-L0 067dJPORTABLE EkPLOSivES DETE OR Pre-approved te6h spec ST - Restart L not 2

IC2.5BRUN iC5 S 76 ICP-02.005 SGLOGICTEST-TRAIN 2 13APR04 13APR04 DR-NML-N 330.

IC2.5BRU GLOGIC TEST-TRAINB(

WKSTAGGERED)

I I

STAGGERED) 1200I 13591 ORT3-NR-M 321 I

030099 SLOGIC l K05.

pred tech spec ST estbrt CL not req'd Run Date 13APR04 15:371 LT-52 WORKWEEK ACTIVITIES DURING U1R28 I

Sheet 2 of 3 O Prlmavera Systems, Inc.

FL-52 Workweek Activities during Ul R28

after 13APR04 12:00 I

WORKWEEK SCHEDULE I

thru 14APR04 0500 U

ID RESP T WO EQID DESCRIPTION RD ES EF RISK ResI c APR

_Y ST ID 68112i14i1i82j2024.6.10112,14.16.18.20,221 0 2.4, 6, 0

OP0215353 OPI _

76 O-PC-MIDS OPERATIONS MID 28 09APR04 17APR04 DR-Y ML-Y

02153, IPERATIONS MID SHIFT LY ROUTINE_

SHIFT WEEKLY 00:OOA 06:59 ORT3-N R-L O-m-_

ROUTINE rpprov I tech spec ST - Restart CL n teq'd 2

OP0216093 OP1 P 75 O-PC-009.5 ROTATIONAL 2

14APR04 14APR04 DR-N ML-N K07 OPo216og3ROTATI NAL LUBRICATlONOF UNIT 2 SI LUBRICATION OF UNIT 00:00-01:59 ORT3-N R-L 0216093MROT TIONAL LUBRICATIpN OF UNIT 2 SI PU AP B~i 2Sl Pre-appr Ned tech spec ST-Restart CL not reqd O

OP0215372 OPI _

77 TS-EP-001 POWER AVAILABILITY I

15APR04 15APR04 DR-N ML-N lOP021s372,OWER kVAIL VERIFICATIONS 00:00' 00:59 ORT3-N R-L 0215371POWE R AVA Papp e

0 OP0215432 OP2 76 0-PC-DAYS OPERATIONS DAY 38 13APR04 18APR04 DR-N ML-N P0 t PERATiONS DAY SHIFT W KLY ROUTINE SHIFT WEEKLY.

08:OOA 14:59 ORT3-N R-.

I--

ROUTINE P__-_p roved teth spec ST - Restart L not reqd 0

OP0215554 OP3 f 76 O-PC-029 LOAD TEST G-05, G-501 3 13APR04 13APR04 DR-N ML-N Opl Z15554LOAD TEST G-05, G-t 16:00-18:59 ORT3-N R-L I 1555i4WGAS TURBINE. i UXILIARIES AND LOAD TESTS l I l l

.136 iPrepproved tedhspe. ST -RestartCL not ;eq'd OP0215653 lOP3 Pn O-PC045.3 l PUMPOUT l3 l13APR04 13APR04 DR-N ML-N lOp 156s3EJ MP OUT CIRCULA ING WATER PUMP TS CIRCULATING WATER 16:00-18:59 ORT3-N R-L I 15653_CIRCULATING ATER PUMP PIT PUVPING S

OP0308216 OP3 S 77 O-PC-045.1 BLOWDOWN l 1 13APR04 13APR04 DR-N ML-N 528 3062j1BLOW DOWN INSTF UMENT AIR'SYSTEM INSTRUMENTAIR 17:00-17:59 ORT3-N R-L X030821PERIODIC LOW OWN OF AIR RECEIfERS AND PIPING SYSTM Pre-approved tech sr xc ST - Restart CL ckl req'd 2

OP0303334 l OP3 Pl 77 TS-ECCS-00lSAFEGUARDS SYSTEMl 3 @13APR04 13APR04 DR-N ML-N OP03;3334SAFEGUARDS SYSTEMVENTNG (,AONTHLY)

VENnING (MONTHLY) 20:00 22:59 ORT3-N R-M Qp 0303334SAFEGUARDS SYSTEM VENTING (MONTHLY)UN 2 Pre-approved te :h spec ST - Restart CL not reqc d O

OP0215548 OP3 77 O-PC-SWING OPSSWINGSHIFT 49 14APR04 20APR04 DR-N ML-N 0P02155480S SWING SHlFTr TKLY WEEKLY ROUTINE 16:00-22:59 ORT3-N R-L OPERA1 ONS SVNG SHIFT WEEKLY ROUTINE 02155481 P.-approved tech spe ST - F 2

U2GNDR00l OP3 TG-01 DRAIN U2 MAIN I

14APR04 14APR04 524 U2GNDR00DRAIN U2 MAIN ELECTRI ELECTRICAL 18:00 18:59

§ A

GENERATOR PER PC provedtedpec

__ _ _ _ _21.3 Pre-approved___

__tech_

_pe__

Run Date 13APR04 15:371 LT-52 WORKWEEK ACTIVITIES DURING U1 R28 Sheet 3 of 3 C Prmavera Systems, Inc.

FL-52 Workweek ActIvIties during UIR28

Run Date 13APR04 15:411 Work Activity Risk Assignment Sheet I of 1 U

ACT WO GRP HPE EQUIPMENT Activity Cal DUR START FINISH aPR ID ST RISK Description ID i

'18t 0 6 12 6

611 0

EM0305201 76 EM DR-N ML-N 125V STATION TECH SPEC 1

1 13APR04 13APR04 125V SYSTEM MULTI ANDIOR NON-NUMBERED EQUIPMENT ORT3-N R-M BATTERIES WEEKLY 10:OOA 12:59 05201 - B0452 0

EM0309069 76 EM DR-N ML-N D-105 WEEKLY STATION BATTERY 1

3 13APR04 13APR04 125V DC STATION BATTERY ORT3-N R-M INSPECTION 13 00-15:59 0309069 - 804B2 0

EM0309133 76 EM DR-Y ML-Y D-106 WEEKLY STATION BATTERY 1

3 13APR04 3APR04 0125V DC STATION BATTERY ORT3-N R-M INSPECTION 16:00 18:59 0309133 - B04B2 1

EZMRCP-K 76 EM DR-Y ML-Y P-0011B-M P1B MOVE MOTOR FROM 1

6 14APR04 14APR04 EREACTOR COOLANT PUMP MOTOR ORT3-N R-H PUMP TO STAND 12:W-17:59 0215205 - 128EM 2

IC2 5BRUN 76 IC5 DR-N ML-N ICP-02.005 SG LOGICTEST-TRAIN B 1

2 13APR04 13APR04 SAFEGUARDS LOGIC ORT3-N R-M (4WK STAGGERED) 12:00 13:59

)300999 - B04B2 1I MM-8480D1 76 MMI DR-N ML-N R-1 MOVE REACTOR VESSEL 1

4 15APR04 15APR04 EREACTOR VESSEL AND ASSEMBLY ORT3-Y R-H HEAD TO RHLDA 14:00 17:59 0214134 - 128MM I

MM-8485B1 76 MM3 DR-Y ML Y P-001B PLACE BACKSEAT 1

1 15APR04 15APR04 IREACTOR COOLANT PUMP ORT3-Y R-M COLLECTION SYS IN 13:00 13:59 0214119 - 128MM OP0303334 77 OP3 DR-N ML-N TS-ECCS-002 SAFEGUARDS SYSTEM 3

3 13APR04 13APR04 0SAFEGUARDS SYSTEM VENTING (MONTHLY) UNIT 2 ORT3-N R-M VENTING (MONTHLY) 20:00 22:59 0303334 - B03A2 1

RPIA-060 OPS DR-N ML-N O-RP-W01A FILL CAVIlY FOR ROD 114 15APR04 15APR04 EFILL UPPER CAVITY FOR UNLATCHING RODS (RP-1A ORT3-N R-M UNLATCH 16:00 19:59 1280P NMC I WE LT-81 HUMAN ERROR RISK BARCHART MENOMONE PBNP U1 Refueling 28 Outage FL-81 HUMAN ERROR POTENTIAL O Primavera Systems, Inc.I