S--r-1 Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:
April 11. 2004 Time:
2330 Preparer:
Rick W\\'oodi U
I R
28 NOTE:
Refer to base procedure NP 10.3.6for safety assessment checklist KSF defuiitions.
NOTE:
Jis<eneverfiuel has been removed from the reactor vessel and refueling cavity, all key safetifiurctions are GREEN except spent fuel pool cooling.
KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY
- 1.
RCS Boron concentration = 2888 ppm a.)
For RSD, RC9 boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)
For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C
- 2.
Number of boration paths
- 3.
No fuel motion
- 4.
SR instrumentation operable Subtotal Condition RED ORANGE (0-1) 1 (0-2) 2 (0-1) 1 (0-1)
I 0-1 2
3-4 5
Subtotal =
5 CORE COOLING Subtotal Condition
- 1.
Number of SG available for DHR (0-2) 0 0-1 RED
- 2.
Refueling cavity filled (0-1) 0 2
- 3.
Number of trains RHR available (0-2) 2 3
- 4.
RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP = 1001; 8 days shutdown; RCS 69%
Subtotal =
3 RCS Time to Boil 43 mmi (Applicable at Cold or Refueling Shutdown)
PONER AVAILABILITY Subtotal Condition
- 1.
Independent off-site power sources I
RED available to A-05 and A-06 (totally 2
ORANGE independent at the 4160 V, 13.8 kV, 3
and 345 kV levels)
(0-2) 2 4-5
- 2.
G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1
- 3.
G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
(0-1) 0 Subtotal =
4 INVENTORY Subtotal Condition
- 1.
Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2
- 2.
Refueling Cavity filled (see definition)
(0-3) 0 3
- 3.
RCS level above REDUCED INVENTORY (0-1) 1 4
- 4.
Makeup from VCT/BLENDER and'or RWST available (0-2) 2 Subtotal 3
_flf Y~f 3~ Q l T t M
- e.. d
. J LI I L J in accordance with t e Freedom of Information Act, exemptions V PBF-1562 F 1A A./,4
.E Revision 2 10130/02 /
References:
NP 10.3.6 NP 10.2.1 Page I of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT I.
Containment integrity (TS 15.1.D) {Containment Operable} {ITS TS 3.6.1) set
- 2.
Containment Closure CL-IE maintained and closure < time to boil
- 3.
No fuel motion
- 4.
DHR Capability:
cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1)
I Subtotal 0
2-3 4-5-6 Condition RED ORANGE
__.~
(0-1) 1 Subtotal -
4
- SPEN, (ONLY APPLICABLE when NOTE:
Take creditfor only one P-12 inrdependlen I.
"A" SFP cooling pump available with power available from:
G-02 or G-01 via 2B-32 an independent off-site power source different than that for Train B below
- 2.
"B" SFP cooling pump available with power available from:
G-03 or G-04 via IB42
.(*) an independent off-site power source different than that for Train A above
- 3.
Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SFP Temperatures:
NW n/a OF SE n/a OF SFP Average Temp n/a OF SFP Time to Boil n/a r FUEL POOL COOLING starting AND during FULL CORE OFFLOADS) t offsitepoiver source durinrg periods of single X-03 or X-04 availability (*).
Subtotal Condition 0-I RED 2
ORANGE (0-1) n/a 3
YELLOW 4-5 GREEN (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal =
n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:
No change from previous shift.
PBF-1562 Revision 2 10f30/02
References:
NP 10.3.6 NP 10.2.1 Page 2 of 9
Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:
l DATE:
April 11, 2004 TIME:
2330 KEY SAFETY FUNCTIONS:
REACTIVITY:
GREEN CORE COOLING:
POWER AVAILABLE:
INVENTORY:
YELLOW GREEN YELLOW CONTAINMENT:
SFP COOLING:
GREEN NA PROTECTED EQUIPMENT:
C MMENTS:
_-.Vrr-eiotection Condition III: Crediting existing rire rounds as fire prevention RCS Time to Boll Is 43 minutes RCS is at 68% Reactor Vessel Level Hot Leg Vent Path is the Pressurizer Manway PBF-1562 Rp.v;t;^n7 IA/I~n=
References:
NP 10.3.6 NP 10.2.1 Page 5 of 9