ML051890462

From kanterella
Jump to navigation Jump to search
Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051890462
Person / Time
Site: Point Beach 
Issue date: 04/06/2004
From: Black D
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051890462 (3)


Text

NRc 0-Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 6, 2004 Time:

150()

Preparer:

David Black U

I R

28 NOTE:

Refer to base procedure NP 10.3.6 for safety assessment checklistK ASF definitions.

NOTE:

11i7'eneverfiuel has been remoredfroin the reactor vessel and refueling cavity, all key safetyfunctions are GREEN except spentfiuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2866 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE (CO-)

I (0-2) 2 (0-1) 1 (0-1) 1 0-1 2

3-4 5

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 1 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 1 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5'GR RCS TEMPE 114"F; 35 days shutdown; RCS full Subtotal =

3 RCS Time to Boil

-115 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

independent at the 4160 V, 13.8 kV, 3rYE YLOW )

and 345 kV levels) *

(0-2) 1 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to a 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil Ž 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

3 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent whead on 0-1 RED (0-1) 1 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

A L

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

C GREEN

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

4 infToitlon In tills record was deleted in accordance withd e Freedom of Information Act, eaemtions _

10a3a002 FOIA Pag_

e I of 9

References:

NP 10.3 6 NP 10.2.i PBF:1562 Revision 2

at; I-Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) IContainment Operable) (ITSTS3.6.1) set

2.

Containment Closure CL-I E maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (Oor2) 2 (0-1)

I Subtotal 0

1 2-3 4-5-6 Condition RED ORANGE

<ED (0-1)

I Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 independent offsile power source during periods of single X-03 orX-04 availability (*).

Subtotal Condition A.

'A' SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G-02 or G-01 via 2B-32 (0-1) n/a 3

YELLOW

.(*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via I B-42

.(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0- 1) n/a (0-1) n/a (0-])

n/a (0-1) n/a Subtotal =

n/a SFP Temperatures:

NW n/a OF SE n/a

'F SFP Average Temp n/a SFP Time to Boil n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

PBF-1562 Revision 2 103(tO2

References:

NP 10.J.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

April 6, 2004 TIME:

15(0 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

GREEN YELLOW POWER AVAILABLE:

INVENTORY:

CONTAINM1ENT:

SFP COOLING:

YELLOW GREEN GREEN NA PROTECTED EOUIPMENT:

COMMENTS:

Fire Protection Condition II RCS Time to Boil is >110 minutes ORT-3A Train A ESFAS Testing in Progrmss PBF-1562 Revision 2 10/30/02 References; NP 10.3.6 NP 10.2.1 Page 5 of 9