Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051890444
Person / Time
Site: Point Beach 
Issue date: 04/05/2004
From: Leiker J
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051890444 (3)


Text

'a

£A i A

N Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST April 5, 2004 Time:

)

Preparer:

Jon Leiker U

I R

cr-I4, 28 Date:

'TE:

Refer to base procedure NP 10.3.6for safety assessment checklist KSF definitions.

IYOTE:

1'Wheneverjfuel has been removedfrom the reactor vessel and refueling carity, all key safet functions are GREEN except spent fuel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/Truc = I through 4 REACTIVITY

1.

RCS Boron a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1

2.

Number of boration paths (0-2) 2

3.

No fuel motion (0-1) 1

4.

SR instrumentation operable (0-1)

I Subtotal 0-1 2

3-4 co9 Condition RED ORANGE 3XI'LO CupREE -

Subtotal =

5 CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 1 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

H E _

3.

Number of trains RHR available (0-2) 1

(:3j)

QYELLOW,)

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 GREEN 2.5 davs shutdown, SEP-I, RCS Full, TCA lG= 101 '

Subtotal =

3 RCS Time to Boil 105 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally A

LDA/d,2_

E independent at the 4160 V, 13.8 kV, f3 C YELLOW,)

and 345 kV levels)

(0-2) _5 COVE5

2.

G-01 or G-02/A-05B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-1)

X 1 :3L

3.

G-05 available, Reactor Cavity filled to 2 23 ft lJl1 'l above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

3 INVENTORY Subtotal Condition

1.

Pressurizer level >20 percent vlhead on 0-1 RED (0-1) 1 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 0 I

3.

RCS level above REDUCED INVENTORY (0-I) 1

(

GR

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

4 i

A

!.§;

rI A^l

-z inlolmatiun in tlhs recorm was aelemd a accordance withte Freedom of Information PBF-156 Act e to Reiso 2W310 Pa,

References:

NP 103.6 NP 10.2.1 ge I of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT Containment integrity (TS 15.l.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at lcast one SG available OR one fan cooler With Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

l 2-3

(;-6 Condition RED ORANGE yQy!W Q!LEEN)

(0-1)

I Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

ANOTE:

JTake creditfor only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

r Subtotal Condition I.

"A" SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G-02 orG-01 via 2B-32 (0-1) n/a 3

YELLOW

-(*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via I B 42

  • (*) an independent off-site power source different than that for Train A above
3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) n/a (0-1) nWa (0-1) nWa (0-1) n/a SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Tcmp n/a SFP Time to Boil nWa Subtotal =

n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

I P-1 5B tagged out for LTOP ORT-3B Train-B ESFAS Testing started.

PBF-1 562 Revision 2 10/30/02

References:

NP 10.3 6 NP 10.2.1 Pagc 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

PROTECTED EQUIPMENT:

DATE:

April 5, 2004 TIME:

10:30 GREEN YELLOW YELLOW GREEN GREEN N/A COMMENTS:

Fire Protection Condition II RCS Time to Boil is 105 minutes ORT-3B Train-B ESFAS Testing In Progress PBF. 1562 Revisio~n 2 10130/02

References:

NP 103k NP 10.2.1 Page 5 of 9