fIJc Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 7, 2004 Time:

0900 Preparer:

David Black U

I R

28 NO TE:

Refer to base pro cedure NP 10.3.6for safety assessment ch eckllst KSF definitions.

NOTE:

IF7i eneverfuel hlas been rentovedfron the reactor vessel and refueling cavity, all key safetyfunctions are GREEN excet spentfuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2866 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C (0-1) 1

2.

Number of boration paths (0-2) 2

3.

No fuel motion (0-1) 1

4.

SR instrumentation operable (0-1)

I Subtotal 0-1 2

3-4 5

Condition RED ORANGE

<2w:)

Subtotal 5

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TENIP - 105 0F; 4 days shutdown; RCS full Subtotal -

5 RCS Time to Boll 35 min (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-01 or G-02/A-05/B-03 available (0-1) 1 G-03 or G-04/A-06/B-04 available (0-I) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 RED (0-1) 0 2

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal 3

information in this record was de~td in accordance with t. e Freedom of Information PBF-1 562 Act, eIe p,$ios-Revision 2 10/30/02 f

Page I of 9

References:

NP 103.6 NP 102.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15. 1.D) (Containment Operable) (ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out

, OR at least one SG available

  • OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0.1)

I Subtotal 0

I 2-3 4-5-6 Condition RED ORANGE (0-1) 1 Subtotal 4

SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent

1.

"A" SFP cooling pump available with power available from:

G-02 or G-01 via 2B-32

  • (*) an independent off-site power source different than that for Train B below
2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil Z 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

offste power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition 0-1 RED 2

ORANGE (0-1) n/a 3

YELLOW 4-5 GREEN (0-1) nWa (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactor Vessel Level at 60-70%; steam generator tubes are being burped and drained. Core cooling and inventory are yellow because steam generators are unavailable and RCS is below pressurizer level.

PBF-1562 Revision 2 10130/02

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWVER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

DATE:

_ April 7,2004 TIME:

0900 GREEN YELLOW GREEN YELLOW GREEN NA PROTECTED EQUIPMENT:

.COMMENTS:

Fire Protection Condition II RCS Time to Boil is 35 minutes Steam generator tubes are being burped and drained.

PBF-I 562 Revision2 10130/02

References:

NP 103.6 NP 10.2.1 Page 5 of 9