Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051890442
Person / Time
Site: Point Beach 
Issue date: 04/05/2004
From: Branam T
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051890442 (3)


Text

..

Point Beach Nuclear Plant

- I 5 PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST C

Date.Aprit-5,2004 --

Time-0300---Preparers-'

1: R Braia

I

-R' 28-'

NVOTE:

Refer to base procedure NP 10.3.6forsafety assessment checklist KSFdefinitions.

NOTE:

WIleneverfuelhas been reinovedfron tile reactor vessel and refteling cavity all key safetyfinctions are GREEN ewceDt spent fuelpool cooling.

KEY SAFETY FUNCTION CRITERIA: No/False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2879 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE (0-1) l (0-2) 2 (0-1)

I (0-1)

I 0-1 2

3-4 5

Subtotal 5

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 2 0-1 RED

2.

Refueling cavity filled (0-1) 0 2

ORANGE

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 1 4-5 RCS TEMP - 104F; 2 days shutdown; RCS full Subtotal =

5 RCS Time to Boil 100 nin (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition I.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5

2.

G-0I or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 RED (0-1) 1 2

ORANGE

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 1 4

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal 4

  • ,worination in this record was deleted

!I accordance withe Freedom of Information Revision 2 10/30102F ot P;ve I of 9 Rercrences: NP 103.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Contairunent integrity (TS 15.1.D) {Containment Operable) {ITS TS 3.6.1) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

l 2-3 4-5-6 Condition RED ORANGE (0-1) 1 Subtotal 4

SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offsite power source duringperiods of single X-03 orX-04 avallability (*).

Subtotal Condition

1.

"A' SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G-02 or G-0l via 2B-32 (0-1) n/a 3

YELLOW

{*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB-42

.*)

an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1). n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Temp n/a SFP Time to Boil n/a Subtotal =

n/a OF GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

1 P-15B tagged out for LTOP PBEF 1562 Revision 2 10130102 Page 2 of 9 Rcrcrences: NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST

'OUTAGE SAFETY-ASSESSMENT UNIT:

1 DATE:

April 5, 2004 TIME:

0300 KEY SAFETY FUNCTIONS:

REACTIVITY:

CORE COOLING:

POWER AVAILABLE:

INVENTORY:

CONTAINMENT:

SFP COOLING:

GREEN GREEN GREEN GREEN GREEN NA PROTECTED EOUIPMENT:

COMMENTS:

Fire Protection Condition I[

RCS Time to Boil: -100 minutes PBF-1562 Revision 2 10/30/02 Rererences: NPPOI6 NP 10.2.1 Page 5 of 9