Pbnp Shutdown Safety Assessment and Fire Condition Checklist
ML051890436
Person / Time
Site: Point Beach 
Issue date: 04/09/2004
From: Bennett K
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML051890436 (3)


Text

Point Bcach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 9. 2004 Time:

1500)

Prcparer:

-K['VIN J [BlNNEirr U

I R

28 NOTE:

Refer to basc procedure NP 10.3.6for safety assessment checklist KSF definitions.

J OTE:

1T7henever ftel has been renzoredfrom the reactor ressel and refueling ca ity, all key safetyfunctions are GREEN except spentfitelpool cooling.

IKEY SAFETY FUNCTION CRITERIA: No/Falsc = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2;39 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C 2:'

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition (0-1) 1 (0-2) 2 (0-1) 1 (0-1) 1 0-1 RED 2

ORANGE S

<~

Subtotal =

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) n 0-I1

2.

Refueling cavity filled (0-1) 0 2

CORANGEO

3.

Number of trains RHR available (0-2) 2 3

4.

RCS level above REDUCED INVENTORY (0-1) 0 4-5 GREEN RCS TEi1%ll' = 106"F: 6 days shutdown; RCS, pilpe Subtotal =

2 RCS Time to Boil 28 imin (Applicable at Cold or Refueling Shutdown)

POWVER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources 1

RED available to A-05 and A-06 (totally 2

ORANGE independent at thc 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5 GRE

2.

G-01 or G-02/A-05/B-03 available (0-1)

I G-03 or G-04/A-06/B-04 available (0-l)

I

3.

G-05 available, Reactor Cavity filled to 2 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal =

4 INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent v,/head on 0-I (0-I) 0 2

ORA

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 0 4

GREEN

4.

Makeup from VCT/BLENDER and/or RWST available (0-2) 2 Subtotal =

2 ror0mation in` this record was deleted in accordance with eedom of Informafio Revision Act 7e tiOns,-

Fege I of 9 Revision 2 10I3=51!n

/Oag o

2-3' Refcrcnces NP 10.3.6 NP 10.2.1

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT I.

Containment integrity (TS 15.1.D) (Containment Operable) I ITS TS 3.6.1 ) set

2.

Containment Closure CL-IE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut (O or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2-3 4-5-6 Condition RED ORANGE

_CE>

(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take credit for only one P-12 independent offsite power source during periods of single X-03 or X-04 availability (*).

Subtotal Condition

1.

"A" SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G-02 or G-01 via 2B-32 (0-1) n/a 3

YELLOW

  • (*) an independent off-site power 4-5 GREEN source different than that for Train B below
2.

"B" SFP cooling pump available with power available from:

G-03 or G-04 via IB42 i(*)

an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a SFP Temperatures:

NW n/a OF SE n'a OF SFP Average Tcmp n/a SFP Time to Boil n/a Subtotal =

n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactor Vessel Level is at reduced inventory, thcrefore Core cooling and inventory arc orange.

PBF-1562 Revision 2 10130/02

References:

NP 10.3 6 NP 10.2.1 Page 2 of 9

Point Bcach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

I DATE:

April 9, 2004 TIME:

01 iU0 KEY SAFETY FUNCTIONS:

REACTIVITY:

POWER AVAILABLE:

CONTAINMENT:

GREEN GREEN GRE.EN CORE COOLING:

INVENTORY:

SFP COOLING: NA ORANGE ORANGE PROTECTED EOUIPMENT:

Fire Protection Condition III: Credit taken for fire rounds RCS Time to Boil is 28 minutes R.CS is in Reduced Inventory RCS fill on hold for nozzle dam control panel local alarm problems.

PBF-1562 Revision 2 I 130/02

References:

NP 10.3.6 NP 10.2.1 Page 5 of 9