Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST Date:

April 9,2004 Time:

0100 Preparer:

Richard Wood U

I R

28 NvOTE:

Refer to base procedure NP 10.3.6for safery assessmcnt ch ecA list KSF definitions.

AOTE:

I1 Henever fuel has been reino redfrotn the reactor vessel aitd refielintg ca vity, all key safety functions are GREEN except spentfitel pool cooling.

KEY SAFETY FUNCTION CRITERIA: No!False = 0, Yes/True = I through 4 REACTIVITY

1.

RCS Boron concentration = 2860 ppm a.)

For RSD, RCS boron >Refueling boron concentration specified in unit-specific COLR (TRM 2.1) b.)

For CSD and prior to RSD no fuel motion, RCS boron > boron concentration required by OP 3C

2.

Number of boration paths

3.

No fuel motion

4.

SR instrumentation operable Subtotal Condition RED ORANGE

<2>EE (0-1) 1 (0-2) 2 (0-1) 1 (0-1)

I 0-1 2

3-4 5

Subtotal 5

CORE COOLING Subtotal Condition

1.

Number of SG available for DHR (0-2) 0 0-1

2.

Refueling cavity filled (0-1) 0 2

3.

Number of trains RHR available (0-2) 2 3

-17;

4.

RCS level above REDUCED INVENTORY (0-1) 0 4-5 GREEN RCS TEMP - 107'r; 6 days shutdown; RCS % pipc Subtotal 2

RCS Time to Boil 28 mill (Applicable at Cold or Refueling Shutdown)

POWER AVAILABILITY Subtotal Condition

1.

Independent off-site power sources I

RED available to A-05 and A-06 (totally 2

ORANGE independent at the 4160 V, 13.8 kV, 3

and 345 kV levels)

(0-2) 2 4-5 GR

2.

G-01 or G-021A-OS/B-03 available (0-1)

I G-03 or G-041A-06/B-04 available (0-1) 1

3.

G-05 available, Reactor Cavity filled to Ž 23 ft above the top of the reactor vessel flange, upper internals removed and RCS time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

(0-1) 0 Subtotal 4

INVENTORY Subtotal Condition

1.

Pressurizer level 220 percent w/head on 0-1 (0-1) 0 2

OR

2.

Refueling Cavity filled (see definition)

(0-3) 0 3

3.

RCS level above REDUCED INVENTORY (0-1) 0 4

GREEN

4.

Makeup from VCTIBLENDER and/or RWST available (0-2) 2 Subtotal =

2 Iniormation in this record was aeleteo in accordance with t e Freedom of Informnation Act/

.exmPtillo a

F01~i Page I of 9

References:

NP 10.3.6 NP 10.2.1 PBF-1562 Revision 2 10130/02

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST CONTAINMENT

1.

Containment integrity (TS 15.1.D) (Containment Operable) (ITS TS 3.6. ] set

2.

Containment Closure CL-lE maintained and closure < time to boil

3.

No fuel motion

4.

DHR Capability:

cavity flooded and internals out OR at least one SG available OR one fan cooler with Equip hatch installed and personnel hatches capable of being shut

( or 4) 0 (O or 2) 2 (0-1) 1 Subtotal 0

2-3 4-5-6 Condition RED ORANGE C~.

(0-1) 1 Subtotal =

4 SPENT FUEL POOL COOLING (ONLY APPLICABLE when starting AND during FULL CORE OFFLOADS)

NOTE:

Take creditfor only one P-12 Independent offsite power source during periods of single X-03 or X-04 avallabllo, (*).

Subtotal Condition

1.

"A" SFP cooling pump available 0-1 RED with power available from:

2 ORANGE G-02 or G-01 via 2B-32 (0-1) _na 3

YELLOW 4*) an independent off-site power 4-5 GREEN source different than that for Train B below

2.

'B" SFP cooling pump available with power available from:

G-03 or G-04 via I B.42

-(*) an independent off-site power source different than that for Train A above

3.

Temporary power available to one SFP cooling pump, G-05 available, and SFP time to boil 2 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

SFP Temperatures:

NW n/a OF SE n/a OF SFP Average Temp n/a OF SFP Time to Boil n/a (0-1) n/a (0-1) n/a (0-1) n/a (0-1) n/a Subtotal =

n/a GIVE A BRIEF EXPLANATION OF ANY CHANGE IN SAFETY ASSESSMENT THAT TOOK PLACE:

Reactor Vessel Level is at reduced inventory, therefore Core cooling and inventory are orange.

PBF-1562 Revision 2 10/30102

References:

NP 10.3.6 NP 10.2.1 Page 2 of 9

Point Beach Nuclear Plant PBNP SHUTDOWN SAFETY ASSESSMENT AND FIRE CONDITION CHECKLIST OUTAGE SAFETY ASSESSMENT UNIT:

1 DATE:

April 9, 2004 TIME:

0100 KEY SAFETY FUNCTIONS:

REACTIVITY:

POWER AVAILABLE:

CONTAINMENT:

GREEN GREEN CORE COOLING:

INVENTORY:

ORANGE ORANGE GREEN SFP COOLING: NA PROTECTED EOUIPMENT:

COMM\\ENTS:

Fire Protection Condition III: Credit taken for fire rounds RCS Time to Boil is 28 minutes RCS is In Reduced Inventory PBF-1562 Revision 2 10130/02

References: