|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 ML24032A1542024-04-0303 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) 2024-09-27
[Table view] |
Text
Jl-re18-20t5 0Z:47 PM Dan & Goii I Marrks 602 992 3516 p. el PALO VERDE NUCLEAR GENERATING STATION FACSIMILE TRANSMITTAL SHEET TO: FROM:
Headquarters Operatir is Center Dan M=rk, Compnce Lead -
COMPANY: DATF.
Nuclear Regulaory Connmission 6/18/2005 -
PAX NUM5ER. TOrA. NO. OF PAGES INCLUDING COVER!
301-816-5151 3 PHONE NUMSER: SENDER'S REFERENCE NUMBDER 301-816-5100 RE: YOUR REFERENCE NUMBER ENS ID) 41793 O UIRG.ENT 0 IvOR Rp.VTEW 3 PLESmE COMMENT 0 PLEASE REPLY O PI.ZASR RECYCLE NOTES/COMMFINTS; NRC Headquarters Operaions Center requested vendor-related infob~ation be provided on 06/18/2005.
The attached letter fiom the vendor, FEnmtotne ANP. details the answers to the four questios.
Palo Verde Irquests this informution be forwarded to the requesting entity.
If there are futhe questions, I may be contacted at (602) 509-6195, or as always, the Unit 3 Control Room via the ENS.
- "i 1 i 06/18/2005 SAT 18:44 [T/RX NO 5558] IQOO
JLQN-18-20o5 03:48 PM Don & Goai I Moarks 602 992 3516 P. 02 Nuclear Pars Center 3315-A Old Forest Road P.O. Box 1095 Lynchburg, VA. 24508-035 AREVA Telephone (434) 832-3124 Fax (434) 832-453 Intemet: httz)hvAwwusff e---- -
Stocidna 1=1tndo2 of. ASCO Hydramotorm - ASCO Solenoid Vatra - ROP Se and MO Parts - Flter Carbides - imhorquo Acbtat . Putl &
Motorm - Velan Valves - Anderson Grosowood Crosby (Yarway) Valves and Paril - CutwHamrwnar Metrical Products - Fuid Sallino Products - EMPATH -
lltraCimd Dtagnostc Systorre - Stasns-Raper - rallan &Skfmnns Elecrc Motors - Pressurizer Heaters June 18, 2005 NPC4FtC 05-036 Mr David aP Arizona Public Service P.O Box 52034 Phoenix, AZ 85072-2034 SUb3ect NRC Operations Center Request Refretwe: APS Purhase Order #5002744S1 for Unit 3 Pnsiize Ileaters DarMr. Fan The following information is provided in respn to te rxqueSt for additional information regxdng ft fail=r of p~ureaize beatr provided to APS - Palo Verde Unit 3 under the above refeCend pl~rce order Q12eSOn 15 PartNuimer of HeatetS Rempso t: The ideutifiers asaocisatd with this heater element assembly are as follows:
- Dawing Number 02-5042376D, Rev. 3 Q 4on 2a corponentu bers.
RCW=8 2e Serial Numbfs asockted with the heaers supplied under the above refeirnced puchase order are 001,002,003,004,005,006,007,008,009,010,011,012, 013, 014, 015, 016, 017,018, 019, 020,021,022, 023,024,026,027,028,029,030,031,032,033,034,035,036, andO37.
Q=in P3a Any othetU ino#Ilon that identfita the esters.
Rcon s3- The PaloVerde heaters can be furte describedts follows:
Power 50 kW zniniu 52.5 kW nomnral Voltage: 480 VAC singlO phbse 06/18/2005 SAT 18:44 [TX/RX NO 55581 2 002
JLN i4-18-20Z 03:49 Pt I- Dw _ _ . .
- 6e2 992 ZZ16 P.O3 I.-= operaions. CenJ Request Page 2 Tunr 18, 2005 Quim4: Ote ualies that may bave been uppLed the same style beatom.
No other lkemees have been pMvmIded With the u stYe (Id"'ticl) prssurerhbeate The Palo Verde presUrizer hb r 2YavC ri*s mufacdu d by Thermocozx and prealme boundary corponem daip =d fSkiltion by FANP. Wattforcd 3 (uteray) md SO6NS (Southero Califomnia Rdisom) have be= provided wift S2 $ kW (hominal) prumiz' heaters vith internals m acured by Thwrcoaax and pussme boundaty omponenw desgi and bicaion by FANP. However, these heaten atr diffem fiom those provlded to Palo Verde in that both the WatetfoW and SONGS beatrs we 480 volt3-phase heates Irm is ftber differtation between the beats provided to Wozfoid and SONGS associated with electical comnecio congmatIon The eritical aspect of the differen£es in the sbuilt coungurations as related to the current discovery process of the Imter fWiurs at Palo Verde and Watexford can beounnIzed as follows:
- The desigp valance hem the r ramatomre ANP specification reqiremens that bau bcn identified wth respect to the Palo Verde and Watrfoid beaterl is tat fth trasition ftom the heated poition to the cold potdon of the individual heating loemts for the s supplied heaters is located within tho "o d section of the beater asembly The itpact of this vanmc is curnly being evluated.
- The Pressurizer heaters that have been smpplied to SOJG0S and insed in the fi 1 of 2004 by Framatwoe ANP ar not subjet to the desi va idnd ave The T anstoregico from th heated portin to the cold portion ofthe individual headng &ezcuu for thc eaters spplied to SONGS is cotained witdin the 'Hear section of the batex suembly as speifed by Franatome ANP, Please contact me Ifthem ame any questions.
Srely, I F. Cuvelie,
/ agerMPCBusies Operation Phoe 434-832-3341 Cell 434-841-S859 ErMIR Ammy5i=~ftmmkn=cm 06/18/2005 SAT 18:44 rTX/RX NO 55581 lOnni