May 2005 Monthly Operating Report for St Lucie Units 1 & 2
ML051720460
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/15/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-138
Download: ML051720460 (3)


Text

F Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 June 15, 2005

PL L-2005-138 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, Williaiy'MJefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment i5-4 an FPL Group company

L-2005-1 38 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-335 St. Lucie 1 June 09, 2005 K. R. Boller (772) 467-7465 D:

May 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3.

Number of Hours the Reactor was Critical

4. Number of Hours Generator On-line
5.

Reserve Shutdown Hours

6. Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 631,851.00 Yr-to-Date 3,623.00 3,623.00 0.00 3,093,387.00 Cumulative 204,751.12 202,852.85 0.00 166,518,629.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason I Down 2 Comments

SUMMARY

Unit I operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual TriplScram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

I o i,-"

L-2005-138 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME ST DATE 3

COMPLETED BY Rig TELEPHONE 7

REPORTING PERIOD:

D-389

t. MMcie Z une0925

'72)467-i465 May 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3. Number of Hours the Reactor was Critical
4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6. Net Electrical Energy Generated (MWHrs)

This Month 744.00 744.00 0.00 623,570.00 Yr-to-Date 2,644.70 2,589.07 0.00 2,115,227.00 Cumulative 166,782.92 164,771.94 0.00 135,943,637.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)