F Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 June 15, 2005
- PL L-2005-138 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours, Williaiy'MJefferson, Jr.
Vice President St. Lucie Plant WJ/KWF Attachment i5-4 an FPL Group company
L-2005-1 38 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-335 St. Lucie 1 June 09, 2005 K. R. Boller (772) 467-7465 D:
May 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00
- 3.
Number of Hours the Reactor was Critical
- 4. Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 631,851.00 Yr-to-Date 3,623.00 3,623.00 0.00 3,093,387.00 Cumulative 204,751.12 202,852.85 0.00 166,518,629.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason I Down 2 Comments
SUMMARY
- Unit I operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.
I 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual TriplScram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
I o i,-"
L-2005-138 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.
50 UNIT NAME ST DATE 3
COMPLETED BY Rig TELEPHONE 7
REPORTING PERIOD:
D-389
- t. MMcie Z une0925
'72)467-i465 May 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 830.00 839.00
- 3. Number of Hours the Reactor was Critical
- 4.
Number of Hours Generator On-line
- 5.
Reserve Shutdown Hours
- 6. Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 623,570.00 Yr-to-Date 2,644.70 2,589.07 0.00 2,115,227.00 Cumulative 166,782.92 164,771.94 0.00 135,943,637.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- Unit 2 operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
I Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)