May 2005 Monthly Operating Report for St Lucie Units 1 & 2
ML051720460
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/15/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-138
Download: ML051720460 (3)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 June 15, 2005 F :PL L-2005-138 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, Williaiy'MJefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment i5- 4 an FPL Group company

L-2005-1 38 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-335 UNIT NAME St. Lucie 1 DATE June 09, 2005 COMPLETED BY K. R. Boller TELEPHONE (772) 467-7465 REPORTING PERIO D: May 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,623.00 204,751.12
4. Number of Hours Generator On-line 744.00 3,623.00 202,852.85
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 631,851.00 3,093,387.00 166,518,629.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

Unit I operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Ii,-"

o -

L-2005-138 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 D-389 UNIT NAME STt. MMcie Z DATE 3 une0925 COMPLETED BY Rig TELEPHONE 7 '72)467-i465 REPORTING PERIOD: May 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,644.70 166,782.92
4. Number of Hours Generator On-line 744.00 2,589.07 164,771.94
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 623,570.00 2,115,227.00 135,943,637.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.

1 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 June 15, 2005 F :PL L-2005-138 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the May 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, Williaiy'MJefferson, Jr.

Vice President St. Lucie Plant WJ/KWF Attachment i5- 4 an FPL Group company

L-2005-1 38 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-335 UNIT NAME St. Lucie 1 DATE June 09, 2005 COMPLETED BY K. R. Boller TELEPHONE (772) 467-7465 REPORTING PERIO D: May 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 3,623.00 204,751.12
4. Number of Hours Generator On-line 744.00 3,623.00 202,852.85
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 631,851.00 3,093,387.00 166,518,629.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason I Down 2 Comments

SUMMARY

Unit I operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.

I 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Ii,-"

o -

L-2005-138 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO. 50 D-389 UNIT NAME STt. MMcie Z DATE 3 une0925 COMPLETED BY Rig TELEPHONE 7 '72)467-i465 REPORTING PERIOD: May 2005

1. Design Electrical Rating 830.00
2. Maximum Dependable Capacity (MWe-Net) 839.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 2,644.70 166,782.92
4. Number of Hours Generator On-line 744.00 2,589.07 164,771.94
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWHrs) 623,570.00 2,115,227.00 135,943,637.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments

SUMMARY

Unit 2 operated in Mode I the entire month. In accordance with Technical Specification 6.9.1.6, there were no challenges to power operated relief valves or safety valves during the report period.

1 2 Reason: Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)