ML051710390

From kanterella
Jump to navigation Jump to search

Texas A&M University, RAI, License Renewal Application, Chapter 8, Electrical Power Systems
ML051710390
Person / Time
Site: 05000128
Issue date: 07/18/2005
From: Mendonca M
NRC/NRR/DRIP/RNRP
To: Reece W
Texas A&M Univ
Mendonca M, NRC/NRR/DRIP/RNRP, 415-1128
References
TAC MC2315
Download: ML051710390 (4)


Text

July 18, 2005 Dr. Warren D. Reece, Director Nuclear Science Center Texas A&M University System Texas Engineering Experiment Station F.E. Box 89, M/S 3575 College Station, TX 77843

SUBJECT:

TEXAS A&M UNIVERSITY LICENSE RENEWAL APPLICATIONREQUEST FOR ADDITIONAL INFORMATION ON CHAPTER 8, ELECTRICAL POWER SYSTEMS (TAC NO. MC2315)

Dear Dr. Reece:

We are continuing our review of the Application for Renewal of License No. R-83, Docket No. 50-128 for the Texas A&M Nuclear Science Center TRIGA research reactor. The application was submitted on February 27, 2003. During our review of Chapter 8 of the Safety Analysis Report for the application, questions have arisen for which we require additional information and clarification. In accordance with my conversation with Mr. James A. Remlinger of your staff and Mr. Remlingers letter of March 30, 2005, please provide responses to the enclosed request for additional information with your proposal for conversion of the research reactor to low enriched uranium fuel. As I understand this proposal is expected to be sent to NRC in October 2006. If this schedule changes, please notify me at your earliest convenience.

In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your request.

If you have any questions regarding this review, please contact me at 301-415-1128.

Sincerely,

/RA/

Marvin M. Mendonca, Senior Project Manager Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-128

Enclosure:

As stated cc with enclosure: See next page

Texas A&M University System Docket No. 50-128 cc:

Texas A&M University System ATTN: James A. Remlinger, Reactor Manager Nuclear Science Center Texas Engineering Experiment Station F.E. Box 89, M/S 3575 College Station, TX 77843 Texas State Department of Health Radiation Control Program Director Bureau of Radiation Control 1100 West 49th Street Austin, TX 78756-3189 Test, Research, and Training Reactor Newsletter 202 Nuclear Sciences Center University of Florida Gainesville, FL 32611 U.S. Customs Service Safety Branch ATTN: Mr. Rick Whitman 6026 Lakeside Boulevard Indianapolis, IN 46278 U.S. Department of Transportation Mr. Raymond Lamagdelaine, Special Investigations Chief Office of Hazardous Materials Enforcement DHR-40 400 7th Street, S.W.

Washington, DC 20590

July 18, 2005 Dr. Warren D. Reece, Director Nuclear Science Center Texas A&M University System Texas Engineering Experiment Station F.E. Box 89, M/S 3575 College Station, TX 77843

SUBJECT:

TEXAS A&M UNIVERSITY LICENSE RENEWAL APPLICATIONREQUEST FOR ADDITIONAL INFORMATION ON CHAPTER 8, ELECTRICAL POWER SYSTEMS (TAC NO. MC2315)

Dear Dr. Reece:

We are continuing our review of the Application for Renewal of License No. R-83, Docket No. 50-128 for the Texas A&M Nuclear Science Center TRIGA research reactor. The application was submitted on February 27, 2003. During our review of Chapter 8 of the Safety Analysis Report for the application, questions have arisen for which we require additional information and clarification. In accordance with my conversation with Mr. James A. Remlinger of your staff and Mr. Remlingers letter of March 30, 2005, please provide responses to the enclosed request for additional information with your proposal for conversion of the research reactor to low enriched uranium fuel. As I understand this proposal is expected to be sent to NRC in October 2006. If this schedule changes, please notify me at your earliest convenience.

In accordance with 10 CFR 50.30(b), your response must be executed in a signed original under oath or affirmation. Following receipt of the additional information, we will continue our evaluation of your request.

If you have any questions regarding this review, please contact me at 301-415-1128.

Sincerely,

/RA/

Marvin M. Mendonca, Senior Project Manager Research and Test Reactors Section New, Research and Test Reactors Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket No. 50-128

Enclosure:

As stated cc with enclosure: See next page DISTRIBUTION:

PUBLIC RNRP/R&TR r/f AAdams CBassett WBeckner PDoyle TDragoun WEresian FGillespie PMadden DHughes EHylton

`

PIsaac MMendonca KWitt PYoung DHarrison ADAMS ACCESSION NO.: ML051710390 TEMPLATE No.: NRR-088 OFFICE RNRP:RI RNRP:LA RNRP:SC NAME MMendonca EHylton PMadden (MMendonca for)

DATE 7/ 15 /05 6/ 21 /05 7/ 15 /05 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION TEXAS A&M UNIVERSITY DOCKET NO. 50-128

1. The SAR indicates that a loss of normal AC power would not affect the ability to achieve and maintain safe shutdown conditions in the reactor. Please clarify if AC power is needed for other services, such as emergency notifications, ensuring the safety of experiments and radiation monitoring equipment.