May 2005 Monthly Operating Report for Oyster Creek Generating Station
ML051710264
Person / Time
Site: Oyster Creek
Issue date: 06/09/2005
From: Swenson C
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-05-20109, GL-97-002
Download: ML051710264 (2)


Text

AmerGen SM I

AmerGen Energy Company. LLC Oyster Creek US Route 9 South, P.O. Box 388 Forked River. NJ 08731-0388 www exeloncorp.COm An Exelon Company GL 97-02 June 9, 2005 2130-05-20109 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219

.1

Subject:

Monthly Operating Report - May 2005 Enclosed is the May 2005 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.

Sincr p

A_

C. N. Swenson Vice President, Oyster Creek Generating Station CNS/DIF Enclosure cc:

S. J. Collins, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 05002

,2c4

4 OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME O7 DATE

i COMPLETED BY M

TELEPHONE REPORTING PERIOD:

-219 yster Creek 1 ne 07,2005 oger B. Gayley

)9) 971-4406 May 2005

1.

Design Electrical Rating

2.

Maximum Dependable Capacity (MWe-Net) 650.00 619.00 This Month

3.

Number of Hours the Reactor was Critical,.

744.00

4.

Number of Hours Generator On-line 744.00

5.

Reserve Shutdown Hours 0.00

6.

Net Electrical Energy Generated (MWHrs) 463,245.00 Yr-to-Date 3,623.00 3,623.00 0.00 2,273,457.00 Cumulative 230,102.50 225,793.45 918.20 129,515,181.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1 Down 2 Comments

SUMMARY

During May Oyster Creek generated 463,245 net MWh electric, which was 100.6% of its MDC 1

2 Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1