ML051660153

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Detroit Edison Company Regarding Fermi End-of-Cycle Plant Performance Assessment
ML051660153
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/14/2005
From: Lerch R
NRC/RGN-III/DRP/RPB6
To:
References
Download: ML051660153 (6)


Text

June 14, 2005 LICENSEE: Detroit Edison Company FACILITY: Fermi Power Plant

SUBJECT:

SUMMARY

OF THE MAY 25, 2005, PUBLIC MEETING TO DISCUSS THE FERMI POWER PLANT END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On May 25, 2005, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers, County Courthouse in Monroe, Michigan with Detroit Edison Company representatives. The purpose of the meeting was to discuss the NRC assessment of the Fermi 2 Nuclear Power Station performance for the period of January 1, 2004, through December 31, 2004.

The NRC began the meeting with an overview of the Reactor Oversight Process and the Action Matrix in general. This was followed by a discussion of the NRCs End-of-Cycle assessment of Fermi performance which is documented in the March 2, 2005, End-of-Cycle assessment letter.

W. OConnor, Jr., Vice President Nuclear Generation, Fermi, responded on behalf of the licensee and the Fermi Nuclear Power Station. Mr. OConnor provided an overview of efforts at the Station to address a substantive cross cutting issue identified in human performance.

The meeting notice and NRC presentation slides can be found in ADAMS as ML051260332 and ML051580290 respectfully, and in ADAMS as a package with ML051650549. A list of NRC and licensee meeting participants can be found in the attached Enclosure.

Before adjourning the meeting, the NRC provided the opportunity for members of the audience to ask questions. No members of the public attended the meeting.

Detroit Edison Company In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

/RA/

R. Lerch, Acting Chief Branch 6 Division of Reactor Projects Docket No. 50-341 License No. NPF-43

Enclosure:

As Stated See Attached Distribution

DOCUMENT NAME: E:\Filenet\ML051660153.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N RIII NAME R.Lerch DATE 06/14/05 OFFICIAL RECORD COPY

Detroit Edison Company cc w/encl: N. Peterson, Manager, Nuclear Licensing D. Pettinari, Legal Department Compliance Supervisor G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police

Detroit Edison Company ADAMS Distribution:

LXR1 NKR RidsNrrDipmIipb GEG KGO SJC4 CAA1 C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Detroit Edison Company Enclosure Meeting Participants NRC R. Lerch, Acting Chief, Branch 6, Division of Reactor Projects S. Campbell, Senior Resident Inspector, Fermi Detroit Edison Company W. OConnor, Jr., Vice President Nuclear Generation, Fermi D. Cobb, Plant Manager, Fermi P. Smith, Director Nuclear Assessment, Fermi