ML050960590

From kanterella
Jump to navigation Jump to search

Withholding from Public Disclosure, Additional Information Regarding the Cycle Specific SLMCPR (Safety Limit Minimum Critical Power Ratio) for Cooper Nuclear Station Cycle 23
ML050960590
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/13/2005
From: Michelle Honcharik
NRC/NRR/DLPM/LPD4
To: Edington R
Nebraska Public Power District (NPPD)
Honcharik M, NRR/DLPM, 301-415-1774
References
TAC MC6346
Download: ML050960590 (6)


Text

April 13, 2005 Mr. Randall K. Edington Vice President-Nuclear and CNO Nebraska Public Power District P. O. Box 98 Brownville, NE 68321

SUBJECT:

GLOBAL NUCLEAR FUEL - AMERICAS, LLC (GNF-A) - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR COOPER NUCLEAR STATION (TAC NO. MC6346)

Dear Mr. Edington:

By letter dated March 8, 2005, Stewart B. Minahan, Nebraska Public Power District, submitted an affidavit dated February 3, 2005, executed by Margaret E. Harding, GNF-A, requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

Additional Information Regarding the Cycle Specific SLMCPR [Safety Limit Minimum Critical Power Ratio] for Cooper Nuclear Station Cycle 23 A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a.

Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies.

b.

Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

R. Edington Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1774.

Sincerely,

/RA by M.Fields for M.Honcharik/

Michelle Honcharik, Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-298 cc: See next page

ML050960590

[NRR-084]

OFFICE PDIV-2/PE PDIV-1/PM PDIV-2/LA SRXB-A/SC PDIV-1/SC NAME DDuvigneaud MFields for MHoncharik LFeizollahi FAkstulewicz AHowe DATE 4/12/05 4/12/05 4/12/05 4/13/05 4/13/05

January 2005 Cooper Nuclear Station cc:

Mr. William J. Fehrman President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. Michael T. Boyce Nuclear Assett Manager Nebraska Public Power District 1414 15th Street Columbus, NE 68601 Mr. John C. McClure Vice President and General Counsel Nebraska Public Power District P. O. Box 499 Columbus, NE 68602-0499 Mr. Paul V. Fleming Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, NE 68321 Mr. Michael J. Linder, Director Nebraska Department of Environmental Quality P. O. Box 98922 Lincoln, NE 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, NE 68305 Ms. Cheryl K. Rogers, Program Manager Nebraska Health & Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P. O. Box 95007 Lincoln, NE 68509-5007 Mr. Ronald A. Kucera, Director of Intergovernmental Cooperation Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102 Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, NE 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 State Emergency Management Agency P. O. Box 116 Jefferson City, MO 65101 Chief, Radiation and Asbestos Control Section Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson Suite 310 Topeka, KS 66612-1366 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street Suite D Des Moines, IA 50309 Mr. Scott Clardy, Director Section for Environmental Public Health P.O. Box 570 Jefferson City, MO 65102-0570 Jerry C. Roberts, Director of Nuclear Safety Assurance Nebraska Public Power District P.O. Box 98 Brownville, NE 68321