Inspection/Activity Plan 03/01/2005 - 09/30/2006
ML051600529
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 03/02/2005
From:
NRC/RGN-II/DNMS/MLIB1
To:
Shared Package
ML051600514 List:
References
IR-05-001
Download: ML051600529 (2)


Text

Page 1 of 2 McGuire 03/02/2005 17:27:23 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTN-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/08/2005 03/14/2005 Baseline Inspections MTNSGISI - STEAM GENERATOR ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 03/28/2005 03/31/2005 Baseline Inspections MTNSGISI - U2 SG ISI 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/01/2005 04/01/2005 Baseline Inspections MTN-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 04/18/2005 04/22/2005 Baseline Inspections MTN-MR - MR EFFECTIVENESS 1 1, 2 IP 7111112B Maintenance Effectiveness 06/06/2005 06/10/2005 Baseline Inspections EB1-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 06/20/2005 06/24/2005 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 06/20/2005 06/24/2005 Baseline Inspections PS EP - EMERGENCY EXERCISE 2 1, 2 IP 7111401 Exercise Evaluation 08/08/2005 08/12/2005 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 08/08/2005 08/12/2005 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 08/08/2005 08/12/2005 Baseline Inspections MTN-ISI - U1 INSERVICE INSPECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 09/26/2005 09/30/2005 Baseline Inspections MTNTI160 - 2515/160 U-1: PZR PENETRATION NOZZLES 1 1 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 09/26/2005 09/30/2005 Safety Issues MTNSGISI - STEAM GENERATOR ISI 1 1 IP 7111108P Inservice Inspection Activities - PWR 10/03/2005 10/07/2005 Baseline Inspections EB1SSDPC - SSDPC - PRE-INSPECTION VISIT 1 1, 2 IP 7111121 Safety System Design and Performance Capability 04/10/2006 04/12/2006 Baseline Inspections EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY 5 1, 2 IP 7111121 Safety System Design and Performance Capability 05/08/2006 05/12/2006 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 05/22/2006 05/26/2006 Baseline Inspections OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 05/15/2006 05/19/2006 Baseline Inspections PS1-RP - RP BASELINE OCCUPATIONAL WK1 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 09/18/2006 09/22/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 09/18/2006 09/22/2006 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.

Page 2 of 2 McGuire 03/02/2005 17:27:23 Inspection / Activity Plan Report 22 03/01/2005 - 09/30/2006 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type MTN-ISI - U2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 09/25/2006 09/29/2006 Baseline Inspections This report does not include INPO and OUTAGE activities. Enclosure This report shows only on-site and announced inspection procedures.