McGuire Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2005 17:27:23 Report 22 1
MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 03/08/2005 03/14/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 03/28/2005 03/31/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTNSGISI
- U2 SG ISI Baseline Inspections 04/01/2005 04/01/2005 Inservice Inspection Activities - PWR IP 7111108P 2
1 MTN-HS
- HEAT SINK Baseline Inspections 04/18/2005 04/22/2005 Heat Sink Performance IP 7111107B 1, 2 1
MTN-MR
- MR EFFECTIVENESS Baseline Inspections 06/06/2005 06/10/2005 Maintenance Effectiveness IP 7111112B 1, 2 3
EB1-MODS
- MODIFICATIONS/10CFR50.59 Baseline Inspections 06/20/2005 06/24/2005 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 06/20/2005 06/24/2005 Permanent Plant Modifications IP 7111117B 1, 2 2
PS EP
- EMERGENCY EXERCISE Baseline Inspections 08/08/2005 08/12/2005 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 08/08/2005 08/12/2005 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 08/08/2005 08/12/2005 Performance Indicator Verification IP 71151 1, 2 2
MTN-ISI
- U1 INSERVICE INSPECTION Baseline Inspections 09/26/2005 09/30/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 MTNTI160
- 2515/160 U-1: PZR PENETRATION NOZZLES Safety Issues 09/26/2005 09/30/2005 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 MTNSGISI
- STEAM GENERATOR ISI Baseline Inspections 10/03/2005 10/07/2005 Inservice Inspection Activities - PWR IP 7111108P 1
1 EB1SSDPC - SSDPC - PRE-INSPECTION VISIT Baseline Inspections 04/10/2006 04/12/2006 Safety System Design and Performance Capability IP 7111121 1, 2 5
EB1SSDPC - SAFETY SYSTEM DESIGN & PERF. CAPABILITY Baseline Inspections 05/08/2006 05/12/2006 Safety System Design and Performance Capability IP 7111121 1, 2 Baseline Inspections 05/22/2006 05/26/2006 Safety System Design and Performance Capability IP 7111121 1, 2 2
- REQUAL INSPECTION Baseline Inspections 05/15/2006 05/19/2006 Licensed Operator Requalification Program IP 7111111B 1, 2 3
PS1-RP
- RP BASELINE OCCUPATIONAL WK1 Baseline Inspections 09/18/2006 09/22/2006 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/18/2006 09/22/2006 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/18/2006 09/22/2006 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 09/18/2006 09/22/2006 Performance Indicator Verification IP 71151 1, 2 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
McGuire Inspection / Activity Plan 03/01/2005 - 09/30/2006 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2005 17:27:23 Report 22 1
MTN-ISI
- U2 INSERVICE INSPECTION Baseline Inspections 09/25/2006 09/29/2006 Inservice Inspection Activities - PWR IP 7111108P 2
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure