ML051600187

From kanterella
Jump to navigation Jump to search

Steam Generator Tube Plugging Report
ML051600187
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/31/2005
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML051600187 (2)


Text

Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 May 31, 2005 U.S. Nuclear Regulatory Commission

-ATTN:_ DocumentControl Desk Washington, D.C. 20555 Gentlemen:

In the Matter ) Docket No. 50-328 Tennessee Valley Authority SEQUOYAH NUCLEAR PLANT (SQN) - UNIT 2 STEAM GENERATOR (SG)

TUBE PLUGGING REPORT - SG TUBE INSPECTIONS DURING UNIT 2 CYCLE 13 REFUELING OUTAGE A summary report of SG tube plugging during the Unit 2 Cycle 13 refueling outage, as required by SQN Technical Specification (TS) 4.4.5.5.a, is being provided in the enclosure. The inservice inspection of the Unit 2 SG tubes was completed on May 21, 2005. In accordance with SQN TS 4.4.5.5.b, TVA will submit a special report of the results from this inspection on or before May 21, 2006.

Please direct questions concerning this issue to me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely P. L. Pace Manager, Site Licensing and Industry Affairs -

Enclosures - - -  :  ;-

. . .I

.  : . : . I  :-:

t 60 (

Pred mcydedpapw o n

ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 13 (U2C13) REFUELING OUTAGE STEAM GENERATOR TUBE PLUGGING REPORT

-NUMBER-OF-TUBES-PLUGGED-FROM THE U2C13-INSPECTIONS _.

BY STEAM GENERATOR Steam Generator No. 1: 6 Steam Generator No. 2: 13 Steam Generator No. 3: 12 Steam Generator No. 4: 12 Total Number of Tubes Plugged from U2C13 Steam Generator Inspections: 43 El-1