Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 May 31, 2005 U.S. Nuclear Regulatory Commission
-ATTN:_ DocumentControl Desk Washington, D.C. 20555 Gentlemen:
In the Matter Tennessee Valley Authority
)
Docket No. 50-328 SEQUOYAH NUCLEAR PLANT (SQN)
UNIT 2 STEAM GENERATOR (SG)
TUBE PLUGGING REPORT -
SG TUBE INSPECTIONS DURING UNIT 2 CYCLE 13 REFUELING OUTAGE A summary report of SG tube plugging during the Unit 2 Cycle 13 refueling outage, as required by SQN Technical Specification (TS) 4.4.5.5.a, is being provided in the enclosure.
The inservice inspection of the Unit 2 SG tubes was completed on May 21, 2005.
In accordance with SQN TS 4.4.5.5.b, TVA will submit a special report of the results from this inspection on or before May 21, 2006.
Please direct questions concerning this issue to me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
Sincerely P. L. Pace Manager, Site Licensing and Industry Affairs Enclosures -
.I I
t 60 (
Pred o
n mcydedpapw
ENCLOSURE 1 SEQUOYAH NUCLEAR PLANT UNIT 2 CYCLE 13 (U2C13)
REFUELING OUTAGE STEAM GENERATOR TUBE PLUGGING REPORT
-NUMBER-OF-TUBES-PLUGGED-FROM THE U2C13-INSPECTIONS BY STEAM GENERATOR Steam Generator No. 1:
6 Steam Generator No. 2:
13 Steam Generator No. 3:
12 Steam Generator No. 4:
12 Total Number of Tubes Plugged from U2C13 Steam Generator Inspections:
43 El-1