MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] Category:Congressional Correspondence
MONTHYEARML17068A1402017-03-0808 March 2017 03-08-17 Acknowledgement Letters to Honorable Patrick Leahy, Bernie Sanders and Peter Welch from Eugene Dacus Requesting a Public Meeting on Proposed License Transfer for Vermont Yankee ML17067A2112017-03-0707 March 2017 LTR-17-0100 - Senator Patrick Leahy Et Al., Letter Request for a Public Meeting in Vermont ML15303A1212015-11-30030 November 2015 Letter to Representative Peter Welch from Chairman Burns Responds to His Letter Raising Concerns Regarding the Decommissioning of Entergy'S Vermont Yankee Plant. (Response) ML15288A4992015-10-14014 October 2015 LTR-15-0516 Representative Peter Welch, Letter Concerns Regarding the Decommissioning of Entergy'S Vermont Yankee Plant ML14066A0712014-03-0606 March 2014 03-06-14 Acknowledgement Letter to Honorable Patrick Leahy - Bernard Sanders - Peter Welch - Vermont Yankee ML12083A1282012-03-16016 March 2012 G20120192/LTR-12-0108/EDATS: SECY-2012-0131 - Ltr. Rep. Edward J. Markey Regulations and Policies to Undertake Safety and Other Improvements by NRC Licensees as Part of License Extension Proceedings ML1205408622012-02-23023 February 2012 Response to Letter from Senator Jeanne Shaheen Vermont Yankee Annual Assessment Meeting ML11298A0832011-10-21021 October 2011 G20110761/LTR-11-0574/EDATS: SECY-2011-0564 - Ltr. Rep. Edward J. Markey Nuclear Regulatory Commission'S Regulations and Expectations Related to Licensees' Statements to the Media and Other Members of the Public - Entergy Nuclear and Vermon CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 ML1107300222011-03-0909 March 2011 G20110169/LTR-11-0103/EDATS: SECY-2011-0139 - Ltr. Rep. J. W. Olver Vermont Yankee Decommissioning Process ML1106302162011-02-28028 February 2011 G20110141/LTR-11-0088/EDATS: SECY-2011-0099 - Ltr Congressmen Patrick Leahy, Bernard Sanders, Peter Welch Ltr. Vermont Yankee Decommissioning Process ML1017204852010-06-16016 June 2010 G20100235/LTR-10-0275 - Ltr. Rep. Paul Hodes Questions Regarding Recent Events at the Vermont Yankee Plant ML1011206632010-04-19019 April 2010 G20100235/LTR-10-0175/EDATS: SECY-2010-0235 - Ltr. Paul W. Hodes Tritium Leak - Entergy Vermont Yankee Nuclear Power Plant ML1004801172010-02-11011 February 2010 G20100079/LTR-10-0048/EDATS: SECY-2010-0094 - Ltr Fm Rep. John W. Olver to Chairman Jaczko Tritium Leak - Entergy Vermont Yankee Nuclear Power Plant ML1002805502010-02-0202 February 2010 G20100048/LTR-10-0025//EDATS: SECY-2010-0062/LTR-10-0026 - Ltr to Senator Bernard Sanders, Senator Patrick Leahy, Congressman Peter Welch from Chairman Jaczko Tritium Leak at Vermont Yankee Nuclear Power Station ML1002716492010-01-22022 January 2010 G20100048/LTR-10-0025/EDATS: SECY-2010-0062 - Ltr. Sen. Patrick Leahy, Sen. Bernard Sanders, Rep. Peter Welch Follow Up to January 15, 2010 Letter Regarding Contamination on the Grounds of the Vermont Yankee Nuclear Plant ML1002806642010-01-15015 January 2010 LTR-10-0026 - Ltr., Sen. Patrick Leahy, Sen. Bernard Sanders, & Rep. Welch, Contamination on the Grounds of Vermont Yankee Nuclear Plant ML0831508612008-12-17017 December 2008 G20080745/LTR-08-0570/EDATS: SECY-2008-0617 - Ltr. Rep. Paul W. Hodes Vermont Yankee Incident ML0821004792008-07-30030 July 2008 G20080497/LTR-08-0393/EDATS: SECY-2008-0430 - Ltr. Rep. Paul Hodes Nrc'S Investigations at Vermont Yankee, Request for Additional Information for Upcoming Hearing on License Renewal ML0810906142008-05-15015 May 2008 G20080248/LTR-08-0203/EDATS: SECY-2008-0200 - Ltr. to Sen. Patrick J. Leahy, Sen. Bernard Sanders, and Rep. Peter Welch Vermont Yankee Nuclear Power Plant - Independent Safety Assessment ML0810104382008-04-0808 April 2008 G20080248/LTR-08-0203/EDATS: SECY-2008-0200 - Ltr Sen. Patrick J. Leahy, Sen. Bernard Sanders, and Rep. Peter Welch Vermont Yankee Nuclear Power Plant - Independent Safety Assessment ML0733005092007-11-30030 November 2007 G20070786/LTR-07-0751/EDATS: SECY-2007-0504 - Ltr. Sheridan Brown, Sen John E. Sununu'S Staff Safety Issues at the Vermont Yankee Nuclear Power Plant ML0731202612007-11-0202 November 2007 G20070786/LTR-07-0751/EDATS: SECY-2007-0504 - Ltr. Sheridan Brown, Sen John E. Sununu'S Staff Safety Issues at the Vermont Yankee Nuclear Power Plant ML0726301442007-10-31031 October 2007 G20070624/LTR-07-0595/EDATS: SECY-2007-0319 - Ltr to Sen. E.M. Kennedy; Sen. J Kerry; and Congressman J. Olver Responds to Concerns of the August 21, 2007, Collapse of a Portion of Non Safety-Related Cooling Tower Cell at Vermont Yankee Pow ML0725702462007-09-25025 September 2007 G20070590/EDATS: SECY-2007-0295/LTR-07-0562 - Ltr to Patrick Leahy, Bernard Sanders, and Peter Welch Fm Chairman Klein Occurrence at the Vermont Yankee Power Plant on August 21, 2007 ML0725402262007-08-30030 August 2007 G20070624/LTR-07-0595/EDATS: SECY-2007-0319 - Ltr. Sens. Edward Kennedy, John Kerry & Rep. John Olver Events at Vermont Yankee Power Plant on August 21, 2007 ML0723902292007-08-23023 August 2007 G20070590/EDATS: SECY-2007-0295/LTR-07-0562 - Ltr Fm Patrick Leahy, Bernard Sanders, and Peter Welch to Chairman Klein Occurrence at the Vermont Yankee Power Plant on August 21, 2007 ML0706603132007-03-0808 March 2007 G20070150/LTR-07-0151 - Ltrs to Sen. Bernard Sanders, Sen.Patrick Leahy, Rep. Peter Welch Frm Luis Reyes Request for 30-Day Extension of Deadline for Public Comment on the Environmental Impact Statement for Vermont Yankee ML0706503062007-03-0505 March 2007 G20070150/LTR-07-0151 - Ltr. Bernard Sanders, Patrick Leahy, and Peter Welch Request for 30-Day Extension of Deadline for Public Comment on the Environmental Impact Statement for Vermont Yankee ML0708602972007-03-0505 March 2007 Email: (PA-LR) Information Regarding SAMA Screening2 ML0706605012007-02-27027 February 2007 G20070155 - Sen. John Kerry Ltr. Re Request for the NRC to Address the Issues in Karen M Scott'S Letter Concerning the Vermont Nuclear Reactor ML0704000852007-02-13013 February 2007 G20070068/LTR-07-0060/SECY-2007-0019 - Draft Supplemental Environmental Impact Statement for License Renewal of Vermont Yankee - Letters to Senator Leahy, Senator Sanders, Representative Welch from Luis Reyes ML0703102832007-01-26026 January 2007 G20070068/LTR-07-0060/SECY-2007-0019 - Ltr. Senator Bernard Sanders, Senator Patrick Leahy, and Rep. Peter Welch Regarding Draft Supplemental Environmental Impact Statement (Dseis) for License Renewal of Vermont Yankee ML0620206892006-08-0808 August 2006 G20060650/LTR-06-0349 - Judd Gregg Ltr Conditions at the Yankee Nuclear Power Plant ML0620103492006-06-22022 June 2006 G20060650/LTR-06-0349 - Ltr. Sen. Judd Gregg Regarding Yankee Nuclear Power Plant ML0607300852006-04-0505 April 2006 G20060230/LTR-06-0130 - James M. Jeffords Ltr Information Pertaining to the Implementation of the Extended Power Uprate at the Vermont Nuclear Power Station ML0609405942006-03-24024 March 2006 Letter from Annette L. Vietti-Cook to Senator Jeffords, Senator Leahy, and Congressman Sanders Responding to Their 03/08/06 Letter Regarding the Power Uprate Activity at Vermont Yankee ML0606900872006-03-0808 March 2006 G20060230/LTR-06-0130 - Sen. Patrick Leahy, Sen. Jim Jeffords and Rep. Bernard Sanders Ltr. Re Vermont Yankee ML0535403902005-12-16016 December 2005 Letters from Annette L. Vietti-Cook and Luis A. Reyes Addressed to Senator Patrick Leahy, as Well as the Letter from Senator Patrick Leahy Dated November 10, 2005 ML0535403842005-12-16016 December 2005 Letter from Luis A. Reyes Addressed to Senator James M. Jeffords, as Well as the Letter from Senator James M. Jeffords Dated November 10, 2005 ML0535403732005-12-16016 December 2005 Letter from Annette L. Vietti-Cook to Senator James M. Jeffords Dated December 16, 2005 ML0535403652005-12-16016 December 2005 Letter from Annette L. Vietti-Cook to Representative John W. Olver Dated December 16, 2005 ML0532200402005-12-16016 December 2005 G20050785/LTR-05-0560 - Hon. John Olver Ltr Re. Request for Independent Safety Assessment of the Vermont Yankee Nuclear Power Plant ML0535404092005-12-16016 December 2005 Letters from Annette L. Vietti-Cook and Luis A. Reyes Addressed to Congressman John W. Olver, as Well as the Letter from Congressman John W. Olver Dated November 10, 2005 ML0535404142005-12-16016 December 2005 Letter from Luis A. Reyes Addressed to Congressman John W. Olver, as Well as the Letter from Congressman John W. Olver Dated November 9, 2005 ML0532104012005-12-16016 December 2005 G20050776/LTR-05-0554 - Senator Jeffords, Senator Leahy, Representative Olver, and Representative Sanders Ltr Concerns Over Discovery of More than 40 Additional Cracks in the Steam Dryer at Vermont Yankee ML0535403992005-12-16016 December 2005 Letters from Annette L. Vietti-Cook and Luis A. Reyes Addressed to Congressman Bernard Sanders, as Well as the Letter from Congressman Bernard Sanders Dated November 10, 2005 ML0532700752005-11-15015 November 2005 G20050801/LTR-05-0569 - Ltr. Fm Sen. John Kerry Re Concerns About Nrc'S Decision to Allow Vermont Yankee Nuclear Power Plant to Increase Its Energy Output ML0531804422005-11-10010 November 2005 G20050776/LTR-05-0554 - Sen. Jim Jeffords, Sen. Patrick Leahy, Rep. Bernard Sanders and Rep. John W. Olver Ltr Re Concerns Over Discovery of More than 40 Additional Cracks in the Steam Dryer at Vermont Yankee ML0532102092005-11-0909 November 2005 G20050785/LTR-05-0560 - Rep. John W. Olver Ltr. Re Request for Independent Safety Assessment of the Vermont Yankee Nuclear Power Plant 2017-03-08
[Table view] |
Text
H.- i/I
-- iAR-29-2004 16:39 a hUNITED STATES
.k gNUCLEAR REGULATORY COMMISSION WASHINGToN. o.c. 20S55.oQ01 Marcbh 29, 2004 The Honorable James M. Jeffords United States Senate Washington, D.C. 20510
Dear Senator Jeffords:
I am responding on behalf of the U.S. Nuclear Regulatory Commission (NRC or the Commission) to your letter of February 27, 2004, concerning the request by Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Entergy), to amend the Vermont Yankee Nuclear Power Station (Vermont Yankee) license to increase the power level of the facility. Based on concerns expressed by your constituents, your letter requested that the NRC consult with the Vermont State Nuclear Advisory Panel (VSNAP) and hold public meetings in Vermont related to the Vermont Yankee power uprate request In response to your request, we contacted Mr. William Sherman from the Vermont Department of Public Service. We informed Mr. Sherman that the NRC will be holding two public meetings on March 31,2004. Mr. Sherman has, in turn, contacted the VSNAP members and invited them to attend these meetings. Both meetings will be held in the Vernon Elementary School, near the Vermont Yankee plant The purpose of the first meeting, which is scheduled to begin at 7:00 p.m., isto meet with representatives of Entergy to discuss the results of the Agency's annual assessment of safety performance at Vermont Yankee during the year 2003. Following the assessment meeting and a short break, the NRC staff will meet ith the public at approximately 8.00 p.m., to present information regarding the NRC's review of the Vermont Yankee power uprate request and the review process. The public wi be invited to participate in this meeting by providing comments and asking questions of the NRC staff. We have issued separate meeting notices and a press release for these meetings, which are available on our Web site at httPi1Jwww.nrc.gov. We will continue our dialog with Mr. Sherman to determine if VSNAP has any additional informational needs. The NRC staff will also assess the need for future public meetings related to the Vermnont Yankee power uprate request.
The NRC staff has previously met with VSNAP regarding power uprates. On June 11, 2003, the NRC staff made a presentation to VSNAP regarding the process the NRC uses to review power uprate requests. The meeting included a question and answer session between VSNAP and the NRC staff, and comments from members of the public.
As noted In your letter, the NRC staff will be using the new guidance issued in December2003 to review the Vermont Yankee power uprate request (NRC Review Standard RS-001, Revision 0, 'Revew Standard for Extended Power Upratas"). The Review Standard is available on the NRC Web site at http:/lwww.nrcegov/reactors/opratinglicensinpower-uprates.html.
As discussed in our letter to Senator Leahy dated February 20,2004. the Review Standard was developed, In part, based on a review of various reports related to lessons learned from the Maine Yankee experience (e.g., Report of the Maine Yankee Lessons Leamed Task Group, dated Decaember 1996).
- 11fR-29-2004 16:40 r*, n Senator Jeff ords 2 In accordance with the guidance in RS-001, we performed an acceptance review of the Vermont Yankee request as documented in our letter to Entergy dated February 20,2004. This letter is available in the NRC's Agencywide Documents Access and Management System (ADAMS) on our Web site at http:lIwww.nrcgov/readingrrT'adams/web-based.htrr by entering Accession No. ML040500302. The acceptance review determined that Entergy has provided the necessary information such that the detailed review can be expected to be completed within a 12-month review schedule. The forecast completion date for the review is January31, 2005.
The NRCs detailed technical review for the Vermont Yankee power uprate amendment request involves reviewers in 17 different technical areas and it is estimated that the review will require approximately 4,000 staff-hours. As a comparison, the NRC staff's review for a typical license amendment requires approximately 80 staff-hours. The specific technical areas induded in the review are detailed in the matrices in Section 2.1 of RS-001. Inaddition to the review of the submitted information, the detailed technical review may involve the performance of audits at the plant or vendor sites and performance of confirmatory analysIs by the NRC staff. Review Standard RS-001 provides guidance fo: determiring when and what type of audits and/or confirmatory analysis are appropriate to supplement the review.
In addition to the license amendment review described above, the NRC staff will use Inspection Procedure 71004, Power Uprates," as guidance to inspect issues related to the Vermont Yankee power uprate license amendment. The inspections addressed by this procedure include inspections that focus on issues specifically related to power uprates (e.g., flow-accelerated corrosion) and inspections that use the existing extensive baseline inspection program, as appropriate, to focus on risk-significant power uprate activities (e.g., plant modifications, post-maintenance testing, integrated plant operations). The NRC vil perform inspections of power uprate.actifities starting in the April 2004 refueling outage since Entergy plans to install plant modifications during the outage that will later be used to operate the plant at the proposed power level. Inspection Procedure 71004 is available on the NRC Web site at http:J/wwoi.nrc.gov/reading-rm/doc-collectionsrinsp-manuaLirispection-procedurerip71004.pdf.
The Vermont Yankee power uprate review process will have opportunities for public involvement. The next major milestone in the Vermont Yankee process is for the NRC staff to prepare and publish a "Notice of Consideration of Issuance of Amendment to Facaily Operating Ucense and Opportunity fora Hearing" in the Fedora!fRegister The Federal Reghdernotice will provide a brief description of the amendment request and will give members of the public an opportunity to request a hearing. The notice will be added to the NRC Web site at httpJ//www.nrc.govlwhat-we-dolregulatory/adjudicatory/hearng-license-applicationshttml (in the table titled "Opportunities to Request a Hearing or Petition to Intervene"). As you requested, we will provide a copy of the Federal Register notice to you after it is published.
As noted in your letter, the Advisory Committee on Reactor Safeguards (ACRS) will perform a review of the Vermont Yankee power uprate request. The ACRS is a statutory conmittee that reports directly to the Commission and is structured to provide a forum where experts representing many technical perspectives can provide advice that is factored into the NRUs decision-making process. As part of the ACRS review process, the NRC staff and fte ACRS will discuss the NRC staff's draft safety evaluation in a meeting that, except for discussions of proprietary information, is open to the public. Members of the public may request an opportunity to make an oral statement during the meeting. After the ACRS completes its
r1MR-29-2004 16:40 P. 04/03 Senator Jeffords 3 review, it will make a recommendation to the Commission regarding whether the proposed power uprate amendment should be approved.
The NRC staff has received a copy of the recent letters from Mr. Paul Blanch to you and Senator Leahy about the proposed Vermont Yankee power uprate. Mr. Blanch raises a general concern regarding the adequacy of the regulatory criteria used in the original licensing of Vermont Yankee in light of the current NRC regulations. The NRC frequently updates its regulations as a result of improvements to technology and based on operating experience.
When requirements are changed, the NRC applies a rigorous evaluation standard to determine if the safety benefit of the new requirements justifies imposing the changes on existing licensees. For example, Vermont Yankee was designed and constructed based on the proposed General Design Criteria (GDC) published by the Atomic Energy Commission (AEC) on July 11, 1967. The final GDC were made a part of the AEC's regulations on February 20, 1971. Each plant licensed before the final GDC were formally adopted, including Vermont Yankee, was evaluated by the AEC on a plant-specific basis, and was determined to be safe.
As documented in a memorandum dated September 18, 1992. the NRC determined that imposing the final GDC on plants with construction permits issued prior to May 21, 1971, would provide little or no safety benefit while requiring an extensive commitment of resources. In other cases, the NRC has imposed new regulations on nuclear facilities based on the substantial increase in safety that would be provided (e.g., environmental qualification of electrical equipment).
Mr. Blanch's letters also express concerns regarding issues that appear related to the proposed power uprate request, while other concerns appear related to the current design of the plant.
On March 19, 2004, the NRC staff contacted Mr. Blanch and he confirmed that his concerns only relate to the proposed power uprate.
Various stakeholders have requested an independent safety assessment be performed at Vermont Yankee as an additional verification of plant design/operation in light of the proposed power up rate. Stakeholders are requesting that this assessment be similar to the one performed at the Maine Yankee facility approximately eight years ago. Additionally, in a letter to the NRC dated March 15. 2004, the Vermont Public Service Board (PSB) requested that "as the NRC conducts its current uprate analysis of Vermont Yankee, it do so in a way that will provide Vermont with a level of assurance about reliability equivalent to an independent engineering assessment."
It is important to note that the NRC, as an integral part of its reactor oversight process, performs inspections of plants (e.g., baseline, supplemental, and event-follow-up inspections) based on safety performance. Both inspection results and performance indicator data are formally reviewed quarterly to determine if plant performance warrants a change in inspection effort or NRC regulatory oversight. The NRC's most recent assessment of Vermont Yankee, as documented in a letter dated March 2, 2004 (ADAMS Accession No. ML040630192), places this plant in the "Licensee Response" category of the NRC's action matrix because all inspection findings were classified as having very low safety significance (Green) and al plant performance indicators indicated performance at a level requiring no additional NRC oversight (Green). Therefore, based on the current plant performance, the NRC will continue to perform the normal risk-informed baseline inspection program at this timre (i.e., additional inspections
RAR-29-2004 16:40 P.05/09 Senator Jeffords 4 are not warranted at this time). If plant performance changes, we will not hesitate to perform the additional inspections as required by our reactor oversight process.
The independent safety assessment at Maine Yankee was performed following specific allegations regarding computer code applications. The scope and nature of that assessment was developed for specific issues raised at that plant at that time. The staff had significant concerns with the Maine Yankee licensee's conformance to license requirements; a situation which does not exist currently at Vermont Yankee. Additionally, the NRC performed extensive reviews at plants across the country to determine if licensees were operating plants in accordance with their design bases. Vermont Yankee was included in this review, receiving a special design team inspection in 1997. Design review inspections have been maintained as an integral part of the NRC's oversight process. Inspection results at Vermont Yankee, from hundreds of hours of design-related inspection efforts over the last several years, do not meet NRC criteria for when inspections need to be conducted above the baseline inspection program.
Based on the results from the reactor oversight process, the NRC has determined that the baseline inspection program is the appropriate level of NRC oversight. Plant performance has been good overall and recent engineering inspections have not revealed significant weaknesses. Additionally, the NRC's reactor oversight process is able to quickly respond with additional inspections and regulatory oversight if plant performance warrants.
In conclusion, the NRC conducts an extensive power uprate review and, along with the ongoing NRC inspection program, our current processes are fully capable of assessing whether safe operation can be maintained at this facility following a power uprate.
I hope this information is useful in addressing your constituents' concerns.
Sincerely, Wiliam D. Travers Executive Director for Operations