June 3, 2005
Mike Blevins, Senior Vice President
and Chief Nuclear Officer
TXU Power
ATTN: Regulatory Affairs
Comanche Peak Steam Electric Station
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 -
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION
05000445/2005302; 05000446/2005302
Dear Mr. Blevins:
In a telephone conversation on May 25, 2005, between Messrs. Steve Sewell, Operations
Training Manager, and Tom Stetka, NRC Chief Examiner, arrangements were made for the
administration of a licensing written retake examination at the Comanche Peak Steam Electric
Station during the week of September 12, 2005.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in Revision 9 of NUREG-1021, Operator Licensing Examination Standards for
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
be necessary before the examination is administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outline by July 1, 2005. The written examination and supporting reference materials
identified in Attachment 2 to ES-201 will be due by August 1, 2005. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations, an authorized representative of the
facility licensee shall approve the outline and written examination before they are submitted to
the NRC for review and approval. The examination shall be complete and ready-to-use. Any
delay in receiving the required examination and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examination
to be rescheduled.
In order to conduct the requested written examination, it will be necessary for your staff to
provide adequate space and accommodations in accordance with ES-402.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be
in effect while the written examination is being administered.
TXU Power
-2-
To permit timely NRC review and evaluation, your staff should submit the preliminary reactor
operator license application (Office of Management and Budget (OMB) approval
number 3150-0090), the medical certification (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before September 12,
2005. If the application is not received at least 30 days before the examination date, a
postponement may be necessary. A signed application certifying that all training has been
completed should be submitted at least 14 days before September 12, 2005.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2006. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including
the time for reviewing instructions, gathering and maintaining the data needed, writing the
examination, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to
the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202,
(3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to,
an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter
and its enclosures will be available electronically for public inspection in the NRCs Public
Document Room or from the Publicly Available Records (PARS) component of the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the Electronic Reading Room page of the NRCs public Web site at
http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Sewell has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Tom Stetka at 817-860-8247, or
myself at 817-860-8159.
Sincerely,
/RA/
Anthony T. Gody, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-445; 50-446
TXU Power
-3-
cc:
Fred W. Madden, Director
Regulatory Affairs
TXU Power
P.O. Box 1002
Glen Rose, TX 76043
George L. Edgar, Esq.
Morgan Lewis
1111 Pennsylvania Avenue, NW
Washington, DC 20004
Terry Parks, Chief Inspector
Texas Department of Licensing
and Regulation
Boiler Program
P.O. Box 12157
Austin, TX 78711
The Honorable Walter Maynard
Somervell County Judge
P.O. Box 851
Glen Rose, TX 76043
Richard A. Ratliff, Chief
Bureau of Radiation Control
Texas Department of Health
1100 West 49th Street
Austin, TX 78756-3189
Environmental and Natural
Resources Policy Director
Office of the Governor
P.O. Box 12428
Austin, TX 78711-3189
Brian Almon
Public Utility Commission
William B. Travis Building
P.O. Box 13326
Austin, TX 78711-3326
Susan M. Jablonski
Office of Permitting, Remediation and Registration
Texas Commission on Environmental Quality
MC-122
P.O. Box 13087
Austin, TX 78711-3087
Electronic distribution by RIV:
-4-
TXU Power
-4-
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (KSW)
Senior Resident Inspector (DBA)
Branch Chief, DRP/A (WDJ)
Senior Project Engineer, DRP/A (TRF)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
SISP Review Completed: yes ___ADAMS: : Yes
G No Initials: _TFS_____
- Publicly Available G Non-Publicly Available G Sensitive
- Non-Sensitive
ADAMS ACCESSION NO.: ML051570064
DOCUMENT: R:\\_Reators\\_CPSES\\CP2005301lt-tfs.wpd
SOE:OB
C:OB
TFStetka
ATGody
/RA/
/RA/
05/31/05
06/01/05
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax