MONTHYEARML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML16285A3202016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 13-04 ML16159A4002016-06-16016 June 2016 Iepra Ror for Point Beach SE Section 3.4 ML16159A4022016-06-16016 June 2016 Fpra Ror for Point Beach SE Section 3.4 ML15261A7492015-09-14014 September 2015 NRC Supplement to NRC Letter - Notification of NRC Inspection and Request for Information Dated May 1, 2015 - NextEra Energy Point Beach Nuclear Plant (Msh) ML16072A0362015-06-0303 June 2015 Receipt of Cd Containing Revised I/O Files from NextEra Point Beach Nuclear Plant Flood Hazard Re-Evaluation Report ML15014A1602015-01-14014 January 2015 Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML15014A1532015-01-14014 January 2015 Attachment 1- NEI Comments on NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14147A0112014-06-20020 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14149A1532014-05-0101 May 2014 FOIA/PA-2014-0074 - Resp 4 - Partial. Group F (Records Already Publicly Available) ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML0806704192008-03-0707 March 2008 CDBI Findings ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726203022007-09-28028 September 2007 Amendment to Indemnity Agreement No. B-41, Amendment No. 14 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0635404332006-12-20020 December 2006 Enclosure 2 - Consent and Hearing Waiver Form - the Nuclear Management Company, LLC ML0634705992006-12-14014 December 2006 Plant Service List ML0627903812006-09-29029 September 2006 Exhibit 26 to Case No. 2-2002-004, Interview Report ML0626801502006-09-22022 September 2006 Escort Ratio for Visitors ML0626503122006-09-0101 September 2006 Liquid Radiation Release Lessons Learned Task Force Final Report (Enclosure) ML0626504142005-11-0303 November 2005 RIII-2005-A-0062 Closure ML0626802782005-08-29029 August 2005 3rd ARB Action Plan RIII-05-A-0062 (Point Beach) ML0626802752005-08-22022 August 2005 2nd ARB Action Plan, RIII-05-A-0062 (Point Beach) ML0626504072005-07-19019 July 2005 Action Request - Corrective Action Program (CAP) ML0626802642005-07-18018 July 2005 Initial ARB Action Plan RIII-05-A-0062 (Point Beach) ML0518603982005-07-15015 July 2005 NRC Actions Under the Reactor Oversight Process for the Point Beach Nuclear Plant, Units 1 and 2 ML0518903972005-07-0101 July 2005 Log Entries Report ML0518903962005-07-0101 July 2005 U1R28 Outage Risk Plan Ppg Outage Management ML0518903952005-07-0101 July 2005 U1R28 Add/Delete Log ML0626504032005-06-22022 June 2005 Action Request - Corrective Action Program (CAP) (CAP065250) ML0626503992005-06-10010 June 2005 Action Request - Corrective Action Program (CAP) (CAP065041) ML0626504012005-06-10010 June 2005 Action Request - Corrective Action Program (CAP) (CAP065035) ML0515202282005-05-24024 May 2005 EP FFD Questions Not Asked ML0514700842005-05-24024 May 2005 COLR 28 Replaced with COLR 29 Prior to Vessel Removal. Attach: 04/14/2004 Condition Evaluation 013784. Attach: 04/12/2004 CAP 055612. Attach: Undated Bullet Nose Disconnected & Removed with Head ML0515202262005-05-24024 May 2005 2SI-825B Not Full Open with Handwritten Notations ML0515202242005-05-24024 May 2005 Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515202232005-05-24024 May 2005 Loss of SFP Cooling Due to Breaker Miss Alignment ML0515202212005-05-24024 May 2005 2SI-825B Not Full Open with Handwritten Notations ML0515202192005-05-24024 May 2005 U1R28 Interim Exit Meeting Notes ML0515202182005-05-24024 May 2005 Tsac Not Entered When Source Range Audible Count Rate Removed from Service ML0515202072005-05-24024 May 2005 Questions for Followup Based on Last Outage ISI Summary Report ML0514700772005-05-24024 May 2005 Refuel Outage 1R28 Resident Inspector Coverage ML0514700822005-05-24024 May 2005 Mikes 2004-03 IR Section Write Ups, 2T-34A Accumulator Level Indication ML0515201472005-05-24024 May 2005 Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515202132005-05-24024 May 2005 Inservice Inspection Document Request ML0515201492005-05-24024 May 2005 Transient Combustible Materials in Containment & Turbine Building Without Administrative Controls 2022-02-16
[Table view] |
Text
Inspection Scope Commitment/Plans Lower Head (4/6/04) 100 % visual (VT-2) of bare head. Will use VT-2 qualified people.
Upper Head (4/10-15/04)
- 100 % visual (VT-2) of bare head
- 100 % UT of all penetrations (including leak path verification), with the exception of vent line.
- Penetrant examination of vent line.
SG ET (4/10-15/04)
WE - Contractor inspecting two SGs.
Predict 59 AVB in SG 1A.
Predict 29 AVB in SG 1B.
Deepest flaw (wear) left in service tube 35,56 at 27% predicted to reach 39% max.
100% full length bobbin 50% of hot leg tubes at top of tube sheet (+/- 2 inch) by MRPC Plus Point 50% of row 1 U-bends MRPC Plus Point.
Special interest MRPC Plus Point as required.
ISI Program (4/8/04 & 4/14/04)
Exam Area Code NDE meth Procedure Start Date Cat/item 007900 B-D. VOL NDE-171 4/8 Pzr Surge Nozzle IR 83.120 047500 R-A VOL NDE-173 4/8 RC-10-PZR-1001-05 R1.11 Pipe to elbow 047600 R-A VOL NDE-173 4/8 RC-10-PZR-1001-06 R1.1I Pipe to elbow 074600 R-A VOL NDE-173 4/8 RC-03-PS-1001-08 R1.20 Pipe to elbow
Exam Area Code NDE meth Procedure Start Date Cat/item 074700 R-A VOL NDE-173 4/8 RC-03-PS-1001-09 R1.20 Pipe to elbow _
075600 R-A VOL NDE-173 4/8 RC-03-PS-1001-10 RI.20 Pipe to elbow 075700 R-A VOL NDE-173 4/8 RC-03-PS-1001-11 R1.20 Pipe to elbow 204600 C-B SUR NDE 350 4/14 SG 1B Feedwater C.2.21 VOL NDE-163 Nozzle to Shell weld 323700 (loop B FW) R-A VOL NDE-172 4/14 FW-16-FW-1002%.15 R1.11 Valve 1CS476BB to elbow 448200 (AFW to B SG) R-A VOL NDE-109 4/14 AF-03-AFW-1002-76 R1.11 NDE172 Flange to pipe 448200 (AFW to B SG) R-A VOL NDE-109 4/14 AF-03-AFW-1002-77 R1.11 NDE172 Pipe to Branch Conn .
Plant Code ISI interval Start Date J End Date Point Beach 1998 Edition, 00 Fourth 7/1/2002 6/30/2012 U1&U2 266/301 Addenda _
RR#3 Risk Informed ISI Class 1 & 2 Piping. Code Case N-578 and EPRI TR-112657 approved in July of 2003.