June 7, 2005 Mr. Harold B. Ray, Executive Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
SUBJECT:
GROUTING OF SUBSURFACE COMPONENTS AND PARTIAL SITE RELEASE OF THE COOLING WATER INTAKE AND DISCHARGE SYSTEM AT SAN ONOFRE, UNIT 1 SITE
Dear Mr. Ray:
During the recent inspection of San Onofre Unit 1, conducted on May 2 - 5, 2005, the U.S.
Nuclear Regulatory Commission (NRC) and Southern California Edison Company (SCE) discussed SCEs plans for the Unit 1 turbine building below the 8-foot, 6-inch level, and the disposition of the off-shore cooling system. To address the turbine building first, in Section III.C of its post shutdown decommissioning activities report (PSDAR) dated December 15, 1998, SCE states that it will:
... [proceed with] the decontamination and dismantlement of the majority of plant systems... and the construction of an independent spent fuel storage facility (ISFSI)... SCE will decontaminate and dismantle the facilities and structures that will remain to support spent fuel... storage... after the spent fuel...
is removed from the site.
During the inspection, SCE stated that this meant, in part, that the turbine building basement and footings, including embedded pipe, will remain in place until final site remediation for license termination. For a period of time, pipes, sumps and expansion joints will be grouted to fix any residual contamination, the area will be backfilled with clean material and the ISFSI expansion will be constructed on top of it. During final site decommissioning, after Units 2 and 3 have ceased operation, SCE plans to remove the remainder of the Unit 1 turbine building.
After review of its regulations and guidance, NRC concludes that this action is within NRC regulations and encompassed by the PSDAR.
However, SCE also mentioned the possibility that it may reevaluate the total excavation option during formulation of its license termination plan (LTP), and may decide to leave some equipment or turbine building structure in place. In its review of this alternative, SCE should be aware that its current sampling program for the turbine building, as ascertained by NRC, does not appear to support leaving the material in place and terminating the license for unrestricted use. That is, SCE may not be collecting sufficient data with adequate quality assurance controls to demonstrate compliance with derived concentration guideline levels (DCGLs), that it will develop as part of its LTP. Therefore, at the time of license termination, complete delineation of any remaining contamination, including inside embedded pipes, would be necessary for the final status survey if the material were to remain on site. As an alternative, SCE could ensure that its current survey plan conforms to the guidelines provided in NUREG-
H.Ray 1575, Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM), Revision 1, Section 5.3, Characterization Surveys. If that data meets the relevant data quality objectives, it could then be compared to the NRC approved DCGLs to determine compliance without the need for additional sampling.
In response to an SCE question, NRC review and approval of a final status survey plan (FSSP) is not appropriate at this time, because the purpose of an FSSP is to demonstrate compliance with approved DCGLs, which do not yet exist. As we discussed during the inspection, if SCE elects to pursue the detailed survey option at this time, it would be useful for SCE to offer NRC the opportunity to perform confirmatory surveys prior to grouting or permanently sealing potentially contaminated areas. This regulation requires licensees, prior to taking an action permitted under §50.59, to notify the NRC in writing before performing any decommissioning activity inconsistent with or making any significant schedule change from those actions and schedules described in the PSDAR.
Concerning the issue of the off-shore cooling system, on March 10, 2005, Mr. D. F. Pilmer of your staff provided the NRC with a copy of the Notice of Availability of an Environmental Impact Report regarding the disposition of the Unit 1 offshore cooling water system. Briefly, SCE proposes leaving the subterranean pipes in place and removing above-the-seabed intake and discharge structures. Note that NRC has approved several other similar actions in other LTPs.
However, because this activity is not addressed in the PSDAR, SCE must describe the decommissioning of this plant system in accordance with §50.82(a)(7). This regulation allows licensees to perform a §50.59 analysis on any decommissioning activity that is not specified in the PSDAR and notify NRC prior to implementing the action.
H.Ray SCE also indicated it plans to release this system from NRC regulation. The NRC has concluded that such an action constitutes a partial site release prior to approval of the LTP, as stipulated 10 CFR 50.83 (68 FR 19727, April 22, 2003). Section 50.83(a) specifies the actions that a licensee must take to demonstrate that any residual contamination in the system is less than unrestricted release limits. Section 50.83(d) defines the content of the licensees application for the amendment to its license, and Subsections (e) and (f) identify NRC actions to review and approve such a request. The staff is available to discuss any questions SCE may have on actions related to §50.83.
Sincerely,
/RA BAW for/
James C. Shepherd, Project Engineer Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No. 50-206 cc: See next page
H.Ray cc w/enclosure:
Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, CA 92101 Gary L. Nolff Power Projects/Contracts Manager Riverside Public Utilities 2911 Adams Street Riverside, CA 92504 Eileen M. Teichert, Esq.
Supervising Deputy City Attorney City of Riverside 3900 Main Street Riverside, CA 92522 Raymond Waldo, Vice President, Nuclear Generation Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 David Spath, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, CA 94234-7320 Michael R. Olson San Onofre Liaison San Diego Gas & Electric Company P.O. Box 1831 San Diego, CA 92112-4150 Ed Bailey, Chief Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414 Mayor City of San Clemente 100 Avenida Presidio San Clemente, CA 92672 James D. Boyd, Commissioner California Energy Commission 1516 Ninth Street (MS 34)
Sacramento, CA 95814 Douglas K. Porter, Esq.
Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, CA 91770 Dwight E. Nunn, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Daniel P. Breig, Station Manager Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 A. Edward Scherer Southern California Edison San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128 Brian Katz, Vice President, Nuclear Oversight and Regulatory Affairs Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92764-0128
H.Ray June 7, 2005 SCE also indicated it plans to release this system from NRC regulation. The NRC has concluded that such an action constitutes a partial site release prior to approval of the LTP, as stipulated 10 CFR 50.83 (68 FR 19727, April 22, 2003). Section 50.83(a) specifies the actions that a licensee must take to demonstrate that any residual contamination in the system is less than unrestricted release limits. Section 50.83(d) defines the content of the licensees application for the amendment to its license, and Subsections (e) and (f) identify NRC actions to review and approve such a request. The staff is available to discuss any questions SCE may have on actions related to §50.83.
Sincerely,
/RA BAW for/
J. C. Shepherd, Project Engineer Decommissioning Directorate Division of Waste Management and Environmental Protection Office of Nuclear Material Safety and Safeguards Docket No. 50-206 cc: See next page DISTRIBUTION:
DWMEP r/f DCD r/f R.Evans/RIV M.Federline J.R.Strosnider BSmith ML051460296
- See Previous Concurrence OFC DWMEP*
DWMEP*
DWMEP*
OGC R IV*
DCD*
NAME JShepherd CBurkhalter CCraig STreby DSpitzberg DGillen DATE 5/26/05 5/26/05 5/27/05 6/7/05 6/1/05 6/1/05 OFFICIAL RECORD COPY