ML051430096
ML051430096 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 04/18/2005 |
From: | Barr S, Suzanne Dennis Operations Branch I |
To: | NRC Region 1 |
Conte R | |
References | |
50-334/05-301, 50-412/05-301 | |
Download: ML051430096 (1) | |
Similar Documents at Beaver Valley | |
---|---|
Category:License-Operator
MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023
[Table view]Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23107A2502023-04-18018 April 2023 Requalification Program Inspection ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21105A3712021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C3342019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A9822017-08-28028 August 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17072A0122017-03-0909 March 2017 Senior Reactor and Reactor Operator Initial License Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17003A2812016-11-28028 November 2016 Handouts to Applicants (Folder 3) ML17003A2782016-11-28028 November 2016 Final Qa/Related Forms - Forms ES-401 (Folder 1) ML16342C5202016-11-21021 November 2016 Exam Folder 1, Post-Exam Comments, Resolution and Tech References ML16300A1552016-10-26026 October 2016 Initial Operator Licensing Written Examination Approval - Beaver Valley Power Station, Unit 1 ML16342C5222016-10-24024 October 2016 Final Written Exam, Folder 3 ML17003A2762016-10-24024 October 2016 Final Qa/Related Forms (Folder 1) 2023-05-10 Category:Part 55 Examination Related Material MONTHYEARL-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023
[Table view]Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations ML23010A1252023-01-10010 January 2023 Senior Reactor and Reactor Operator Initial License Examinations ML22335A4542022-05-20020 May 2022 Security Agreements ML22335A4532022-04-29029 April 2022 Miscellaneous - Proctor Log ML22335A4292022-04-0404 April 2022 Events and Evolutions Checklist: 3.4-1 ML22335A4372022-04-0404 April 2022 Outline and Op Test Checklists: 2.3-1; 2.3-2 ML21176A0042021-06-25025 June 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21088A0622021-03-26026 March 2021 Final Qa/Related Forms (Folder 1) ML21088A0672021-02-18018 February 2021 Handouts to Applicants (Folder 3) ML21088A0642021-02-18018 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21048A2302021-02-17017 February 2021 Operator Licensing Examination Approval ML21088A0702021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21088A0632021-02-17017 February 2021 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21088A0692021-02-17017 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21074A3312021-02-0707 February 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21088A0602020-12-10010 December 2020 Draft Written Examination (Folder 2) ML21088A0582020-12-10010 December 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20325A0312020-11-20020 November 2020 Modified Questions for ADAMS Record ML21088A0592020-09-30030 September 2020 Draft Written Examination and Operating Test Outlines (Folder 2) L-20-134, Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations2020-04-15015 April 2020 Response to NRC Regulatory Issue Summary 2020-01 - Preparation and Scheduling of Operator Licensing Examinations ML21074A3322020-01-17017 January 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML18304A1702018-10-30030 October 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18247A3812018-09-0404 September 2018 Initial Operator Licensing Operating Test Approval - Beaver Valley Power Station Unit 1 L-18-148, Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations2018-05-16016 May 2018 Response to NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18101B3042017-12-19019 December 2017 Final Qa/Related Forms (Folder 1) ML18019B1732017-12-0505 December 2017 Post Exam Comments and Technical References (Folder 1) ML17320A0132017-11-15015 November 2017 Senior Reactor and Reactor Operator Initial License Examinations ML18102A2242017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Operating Test (Folder 2) ML18102A1582017-11-0101 November 2017 Facility Comments on Draft NRC-Developed Written Exam (Folder 2) ML17305A0862017-10-31031 October 2017 Initial Operator Licensing Written Examination Approval ML18102A1062017-10-19019 October 2017 Final Qa/Related Forms - Form ES-401-6 ML17278A0352017-10-0303 October 2017 September 6, 2017, NRC Generic Fundamentals Examination Results for Beaver Valley Power Station Unit 1, (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18102A2692017-08-28028 August 2017 Draft Written Examination and Operating Test Outlines ML18102A5732017-08-28028 August 2017 Draft Written Examination (Folder 2) ML18102A9822017-08-28028 August 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17072A0122017-03-0909 March 2017 Senior Reactor and Reactor Operator Initial License Examinations ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17003A2812016-11-28028 November 2016 Handouts to Applicants (Folder 3) ML17003A2782016-11-28028 November 2016 Final Qa/Related Forms - Forms ES-401 (Folder 1) ML16342C5202016-11-21021 November 2016 Exam Folder 1, Post-Exam Comments, Resolution and Tech References ML16300A1552016-10-26026 October 2016 Initial Operator Licensing Written Examination Approval - Beaver Valley Power Station, Unit 1 ML16342C5222016-10-24024 October 2016 Final Written Exam, Folder 3 ML17003A2802016-10-24024 October 2016 Final Outlines (Folder 3) ML17003A2762016-10-24024 October 2016 Final Qa/Related Forms (Folder 1) ML17003A2822016-10-24024 October 2016 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17003A2832016-09-30030 September 2016 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML16342C5212016-09-28028 September 2016 Exam Folder 3, Final Operating Examination 2023-05-10 Category:Memoranda MONTHYEARML22019A2652022-01-27027 January 2022
[Table view]Us NRC Staff Review of Documentation Provided by Firstenergy Nuclear Operating Co. for Beaver Valley, Units 1&2 Concerning Resolution of Generic Letter 2004-02 - Potential Impact of Debris Blockage on Emergency Recirculation During Design B ML20080J7892020-04-28028 April 2020 Relief Requests 2 TYP-3-B3.110-1, 2-TYP-3-C2.21-1, 2-TYP-3-C1.30-1, and 2-TYP-3-RA-1 Regarding Weld Examination Coverage for the Third Inservice Inspection Interval ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML19085A5132019-04-0101 April 2019 Review of Updated Final Safety Analysis Report, Revision 23 ML18099A0812018-04-0606 April 2018 Bv Annual Assessment Meeting Summary and Attendance List 2018 ML18067A1132018-03-0909 March 2018 Notice of Public Meeting on March 27, 2018 ML17061A2072017-03-0707 March 2017 Notice of Meeting with Firstenergy Nuclear Operating Co., to Discuss Nrc'S Assessment of Safety Performance at Beaver Valley Power Station, Units 1 and 2 for 2016 as Described in the Annual Assessment Letter Dated March 01, 2017 ML16224A7652016-10-20020 October 2016 Review of Updated Final Safety Analysis Report, Revision 22 ML15201A4812015-07-20020 July 2015 Notice of Forthcoming Closed Meeting to Discuss Basin-Wide Probable Maximum Flood Analysis for Beaver Valley Power Station, Units 1 and 2 ML15182A1912015-07-16016 July 2015 Annual Financial Test for a Parent Company Guarantee Given by Firstenergy Solutions Corporation and Firstenergy Corporation ML15135A2982015-05-21021 May 2015 Summary of April 28, 2015, Meeting Between Representatives of the U.S. Army Corps of Engineers, Nuclear Regulatory Commission, and First Energy Nuclear Operating Co. to Discuss Flooding Analysis Associated with Beaver Valley Power Station, ML15110A4062015-04-23023 April 2015 Notice of Closed Meeting with FENOC on Beaver Valley ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information ML14195A0742014-07-14014 July 2014 Memoranda to S. Wastler Technical Assistance Request - Review of Physical Security Plan for the Beaver Valley Power Station (TAC No. L24936) IR 05000334/20004122014-07-0808 July 2014 NRC Staff'S Spot-Check Review of First Energy Nuclear Operating Company'S Ownership Interest in Beaver Valley, Units 1 and 2, Perry, and Davis-Besse, Docket No. 05000334, 05000412, 05000440, and 05000346, on June 10, 2014-Finding of No Pote ML14189A1212014-07-0808 July 2014 NRC Staff'S Spot-Check Review of Ohio Edison'S Ownership Interest in Beaver Valley, Unit 2 and Perry, Finding of No Potential Issues ML14189A1192014-07-0808 July 2014 NRC Staff'S Toledo Edison Spot-Check Review of Toledo Edison Company'S Ownership Interest in Beaver Valley Nuclear Power Station, Unit 2, Docket No. 50000412, on June 10, 2014-Finding of No Potential Issues ML14161A1482014-06-17017 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Beaver Valley Power Station, Units 1 and 2 ML13186A0382013-07-0808 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report ML13179A3182013-07-0101 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding 2012 Steam Generator Tube Inspection Reports ML13154A4392013-06-0404 June 2013 Rai'S Following Ifib Analysis of Fenoc'S 2013 Decommissioning Funding Status Report for Beaver Valley 1 and 2 ML12265A2032012-10-0202 October 2012 Notice of Meeting with First Energy Nuclear Operating Company, to Discuss Upcoming License Amendment Request Relating to the Implementation of the Alternate Pressurized Thermal Shock Rule ML12263A4202012-09-20020 September 2012 Electronic Transmission, Draft Request for Additional Information Regarding Revision of Regulatory Commitment for Submittal of 10 CFR 50.48(c) License Amendment Request ML12207A5672012-07-26026 July 2012 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Emergency Action Level Scheme Change Using Nuclear Energy Institute 99-01, Revision 5 ML12194A5622012-07-16016 July 2012 Notice of Forthcoming Pre-Submittal Meeting with Firstenergy Nuclear Operating Company, to Discuss Upcoming Beaver Valley Power Station National Fire Protection Association Standard 805 (NFPA 805) Submittal ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12123A7032012-05-17017 May 2012 Safety Evaluation by the Office of Nuclear Reactor Regulation Annual Financial Test for a Parent Company Guarantee Firstenergy Nuclear Operating Company Beaver Valley Power Station, Unit 1; Docket No. DPR-66 and Perry Nuclear Power Plant ML1014105172010-05-21021 May 2010 Summary of the May 2010 Annual Assessment Open-House Public Meeting ML1008407562010-03-31031 March 2010 Notice of Teleconference Meeting with Firstenergy Nuclear Operating Company Regarding Mutual Understanding of NRR Staff'S Request for Additional Information and to Discuss Generic Letter 2004-02 ML0932102822009-11-17017 November 2009 Verbal Authorization of Relief Request ML0926704712009-09-22022 September 2009 G20090544/EDATS: OEDO-2009-0574 - Edwin M. Hackett Memo, Letter from Citizen Power (Theodore S. Robinson) Concerning the License Renewal for the Beaver Valley Power Station ML0925200672009-09-0909 September 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0925102262009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Commission Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 & 2 ML0925102602009-09-0808 September 2009 Docketing of U.S. Nuclear Regulatory Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0921800382009-08-0606 August 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0920405122009-07-21021 July 2009 G20090418/EDATS: OEDO-2009-0458 - Edwin M. Hackett Memo, Letter from Citizen Power and Beyond Nuclear Concerning the License Renewal for the Beaver Valley Power Station ML0915602002009-06-0808 June 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0914001662009-05-20020 May 2009 Docketing of NRC Teleconference Notes Pertaining to the License Renewal of the Beaver Valley Power Station, Units 1 and 2 ML0835003252009-01-21021 January 2009 Summary of Telephone Conf Call Held on Sept. 26, 2008 Between NRC and Firstenergy Nuclear Operating Company Concerning the RAI Pertaining to the Refurbishment Activities at the Bvps. Units 1&2 LRA ML0832504202008-12-19019 December 2008 Summary of Telephone Conference Call Held on 11/17/08, Between the NRC and FENOC, Concerning Requests for Additional Information Pertaining to the Beaver Valley Power Station, Units 1 and 2, LRA ML0833100872008-11-26026 November 2008 Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), Beaver Valley Power Station, Unit No. 2. the Current Title in the Profile Is the Title to Another Document Not This on So Please Remove and Replace ML0830102492008-11-13013 November 2008 Summary of Telephone Conference Call Held on 10/8/08, Between the NRC and Firstenergy Nuclear Operating Company, Concerning Open Items Pertaining to the BVPS, Units 1 and 2, License Renewal SER ML0830202902008-11-13013 November 2008 Summary of Telephone Conference Call Held on 8/28/08, Between the NRC and FENOC, Concerning RAI Pertaining to the BVPS, Units 1 and 2, LRA ML0829107022008-10-20020 October 2008 10/30/08 Notice of Meeting to Discuss the Draft Supplemental Environmental Impact Statement for License Renewal of Beaver Valley, Units 1 and 2 ML0807301162008-03-21021 March 2008 Summary of Conference Call Between Us Nuclear Regulatory Commission and Firstenergy Nuclear Operating Company, Concerning the Impact of Table 8.0-1 Error on the Beaver Valley Severe Accident Mitigation Alternatives Request for Additional In ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0731005762007-11-0808 November 2007 11/27/2007 Notice of Meeting to Discuss the Safety Review Process and Environmental Scoping Process for Beaver Valley Power Station, Units 1 and 2, License Renewal Application Review ML0717103462007-06-21021 June 2007 Revised Notice of Meeting with Firstenergy to Discuss Response to Nrc'S 05/14/2007, Demand for Information Regarding Fenoc'S Re-analysis of the Timeline and Root Causes for the 2002 Davis-Besse Reactor Pressure Vessel Head Degradation Event ML0716202122007-06-13013 June 2007 Notice of Meeting with Firstenergy Regarding May 14, 2007 Demand for Information Davis-Besse ML0631104002006-11-0909 November 2006 Notice of Closed Meeting Between Fenco Security and NSIR to Discuss Fenco Fleet Security Matters 2022-01-27 |
Text
April 18, 2005 MEMO TO: File FROM: Stephen Barr and Steve Dennis, Chief Examiners
SUBJECT:
DOCUMENTATION OF RECEIPT OF EXAM COMMENTS FROM FACILITY LICENSEE FOR BEAVER VALLEY INITIAL OPERATOR LICENSING EXAM Region I conducted an initial operator licensing examination at Beaver Valley Units 1 & 2 during the week of February 28, 2005. The licensee administered the written exam on March 7, 2005.
The facility licensee submitted comments on the exam on March 11, 2005, with expected delivery to Region I on March 14. The package was never received at the Region, and the facility licensee mailed a duplicate package on March 18. This second package was received in Region I on March 21 and delivered to the Chief Examiner on March 22, 2005.
All affected tracking dates for the Beaver Valley exam should be adjusted to reflect the receipt of facility licensee comments on March 22, 2005.