Ltr Dtd 5/4/05 from Arizona Public Service Company, Gregg Overbeck to Gary Sanborn Request for Extension of Time to Respond to Notices of Violation
ML051390260
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/04/2005
From: Overbeck G
Arizona Public Service Co
To: Sanborn G
NRC Region 4
References
102-05262-GRO/CKS, EA-04-221, EA-05-051
Download: ML051390260 (2)


Text

NOV EA-04-221 NOV EA-05.051 Palo Verde Nuclear Generating Station Gregg R. Overbeck Senior Vice President Tel (623) 393-5148 PO Box 52034 Nuclear Fax (623) 393-6077 Phoenix, Arizona 85072-2034 Mail Station 7602 102-05262-GROICKS May 4,2005 Mr. Gary Sanborn Director of Allegation Coordination and Enforcement Staff Region IV, U.S. Nuclear Regulatory Commission 61 1 Ryan Plaza Dr., Suite 400 Arlington, Texas 7601 1-4005

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-52815291530 Request for Extension of Time to Respond to Notices of Violation EA-04-221 and EA-05-051 Dear Mr. Sanborn.

This letter is a follow-up to Arizona Public Service Company's (APS') verbal request to extend the time to respond to Notices of Violation EA-04-221 and EA-05-051 issued to APS on April 8, 2005, by an additional 30 days. A request to extend the time to respond to the notices of violation was made during a telephone call on May 3, 2005, between Craig Seaman, Director, Regulatory Affairs, PVNGS, and Gary Sanborn, Director, Allegation Coordination and Enforcement Staff, of Nuclear Regulatory Commission Region IV.

Specifically, this request is to extend the time by 30 days for (1) the Reply to the Notice of Violation ( I O CFR 2.201) and (2) any appeal to the Staffs Determination of Significance for the Yellow Finding associated with Notice of Violation EA-04-221. In addition, this request is to extend the time by 30 days for (1) the Reply to the Notice of Violation ( I O CFR 2.201), (2) the Statement as to Payment of Civil Penalty, and (3) the Answer to a Notice of Violation (10 CFR 2.205) associated with Notice of Violation EA-05-051, This request is being made due to complexity associated with the issues involved and the volume of material under review. The 30-day extension would require APS' responses by June 7,2005.

Mr. Gary Sanborn Director of Allegation Coordination and Enforcement Staff Region IV, U.S. Nuclear Regulatory Commission Request for Extension of Time to Respond to Notices of Violation EA-04-221 and Page 2 EA-05-051 No commitments are being made to the NRC in this letter. Should you have any questions or desire additional information regarding this matter, please call Mr. Seaman at (623) 393-5421.

Sincerely, GROICKSIca cc:

B. S. Mallett NRC Region IV Regional Administrator M. B. Fields G. G. Warnick F. Congel NRC NRR Project Manager NRC Senior Resident Inspector for PVNGS NRC Director, Office of Enforcement