May 18, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC Quad Cities Nuclear Power Station and Dresden Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
COMMITMENTS AND PLANS RELATED TO EXTENDED POWER UPRATE OPERATION
Dear Mr. Crane:
This refers to Exelon Generation Company, LLC (EGC), Letter RS-05-064, dated May 13, 2005, which provides your commitments regarding operation of the Quad Cites Nuclear Power Station Units 1 and 2, and Dresden Nuclear Power Station Units 2 and 3 at extended power uprate (EPU) conditions. Your letter referenced your five previous commitment letters on this subject dating from 2003 and noted that a large portion of the actions associated with the previous commitments had been completed. The NRC staff has followed these actions through inspections, evaluations, and public meetings with Exelon staff, culminating in a management meeting on May 4, 2005, in NRC Headquarters which was open to public observation. to your letter provided the remaining commitments supporting EPU operation for the Dresden and Quad Cities units, superceded the previous commitment letters, and represented your commitments in their entirety. Additionally, Attachment 2 provided the Quad Cities Unit 2 Power Ascension Test Procedure for the Reactor Vessel Steam Dryer Replacement.
The NRC staff has conducted a review of the information in your May 13, 2005, letter. We understand your commitments include that you will provide frequent feedback to the NRC staff on steam dryer monitoring during Quad Cities Unit 2 power ascension testing following replacement of the steam dryer to EPU power levels and during subsequent EPU operation.
Your commitments stated that you will submit the detailed evaluations from the Unit 2 power ascension data collection to the NRC within 60 days of data collection at 930 Mwe or the maximum reactor thermal power level achieved. We also understand that you will provide extensive feedback to the NRC staff on continued steam dryer loading analysis and on the start up testing and EPU operation of Quad Cities Unit 1 following steam dryer replacement. Your commitments also stated that you would submit the detailed evaluations from Unit 1 to the NRC within 60 days following reaching full power on Unit 1 with the replacement steam dryer installed. We understand that commitments for the monitoring of the two Dresden units at EPU power levels, inspection of the steam dryers during refueling outages, and attempting to locate and retrieve the Unit 2 sample probe continue. Your commitment Number 7 stated that where
C. Crane evaluations or inspections described in your letter indicated significant potential degradation of the steam dryer, Exelon Generation Company would take appropriate actions up to and including shutting down the applicable unit. Lastly, we understand that Exelon Generation Company commits to meet with NRC management by August 31, 2005, and to voluntarily return the affected Quad Cities units to pre-EPU power levels within 14 days, if NRC management leading the meeting is not satisfied with the results and conclusions of your evaluations.
We have no objections with your proceeding as described in your May 13, 2005, letter. We look forward to reviewing the results of the Quad Cities testing and discussing those results with your staff.
If you have any questions regarding this matter, please contact Mark Ring of my staff at (630) 829-9703.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, and any responses you provide will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven A. Reynolds, Deputy Director Division of Reactor Projects Docket Nos. 50-237; 50-249; 50-254; 50-265 License Nos. DPR-19; DRP-25; DPR-29; DPR-30 See Attached Distribution DOCUMENT NAME: E:\\Filenet\\ML051390211.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NRR RIII NAME ABarker:dtp MRing A Mohseni*via email per MAR SReynolds DATE 05/18/05 05/18/05 05/18/05 05/18/05 OFFICIAL RECORD COPY C. Crane cc:
Site Vice President - Quad Cities Nuclear Power Station Site Vice President - Dresden Nuclear Power Station Dresden Nuclear Power Station Plant Manager Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Regulatory Assurance Manager - Dresden Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission D. Tubbs, Manager of Nuclear MidAmerican Energy Company