i Overview i; Rx PWR Thermal XZ102.8rrv; 0.1 X-0.3 1

+

4 py cvcs II I nnn A i

- I 4L.I I

SUK 24NB LIVE 24CID LIVE Forced 1 'j t2 LC VR1li2i Normal 201AIB LIVE VA10/20 LIVE RBCCW SAT CST Level 1)

N16 1 9E-03 w t . i RX Vessel Leve

r inside CTMT Rad: 4 Stearn Plant Rad: 0 Radiation Monitor Valtjo Rise !II% tloor i dii Radiation Monitar value I,ni f'ooi 'ni

_ I

'?7890 Personnn! Access UNEXPLAINED RISE 758.11 tnrlhr .'W:?i:; ; R5099 SJAE 98.10 ). cpn 200 ;1 H7891 CTMT Refuel Floor UNEXPLAINED RISE 725.12 9 mrlhr i m 5 ; : R4262 SG Blawdown 172.80 + cpr 1000 x, R824O CTMT Area Hi R n g UNEXPLAINED RISE 1.28 4 Rlhr 5 : 2 ! : R4299A Main Stm A R7 00E-04 4 Rlhr ?YO? 4" R 8241 CTMT Area Hi R r i g UNEXPLAINED RISE 2.02 f Rlhr 5; 7 1 1 R4299B Main Stm B R9.4OE-04 4 Rlhr 03 12 R4299C Main Stm C R7.81E-04 .) Rlhr 03 OL P

  • RM8123A 21 CTMT Part. 2520.00 4 cpm .'cr,i6e3;.4 "" db larger ttiari bpdri RM8123B 21 CTMT Gas 2025.10 4 C p r t l 7 ~ 47500 55 Rh18262A 22 CTMT Part RM8262B ZZ CTMT Gas 2490.00 2014.50 4 Cpl71 '.Inc3,4

-) c p m - r ' , - m ' 5 i Other (unex rise inputs): 2 Outside CTMT Rad: 0 R7892 Drum Dacoii 2.00 Radiation Monitor Valua Riso 11111 ! floar / d!, R7899 Control Room 0.12 -) mrlhr 1 I 17894 Charging Pump R202 Letdown 25189.49 P7895 Pri Sample ,Sink 0.66 4 imrlhr R202A Failed Fuel OUT OF SERVICE 269.92 37896 EL-25 \Nit?:,; R9327 C o n d Rcrirc TK 424.30 17897 EL-45Wastc R8434A nux Bldg Part 269.20 R84346 Atix Bldg Gas 29.60 38132A U2 Stk P a 4 R8997 Ch9 Pump Area 1500.00 281328 U2 Stk Gas R8998 VCT Area 363.21

?IC8168 U2 WR stk rad 4.97E-03 -) uccc .;2/0i/d RM8139 Spent Fuel S W 0.50 4 rnrihr 2 I 18169 stk gas from EBFS 8.72E-07 -) uccc 27: 0 : / 4 RM8142 Spent Fuel N W 1.00 76038 RBCCW RM8156 Spant Fuel N E. 1.19 RM8157 S o < l i t Fir01 S E. 4.50 Non-logarithmic .. not R8145A U L SFP Exh Par 35.82 R81458 IJ; SF? Exh Gal 35.82 L3155 CTMT S*.::~ib>Lev R8999 SF" 371.78 CTMTPR CTMT S.?rsu CTFvlT Tcrnporrfg:rrk r

CTMT not challenged 264.79 jaa> color. ~ ~ n l uISca CSF chcckltst Daramrjter

'-A t 'k R8168WA ~ ' ( ' i ~';%Ck t Nl~n NORM

. m t s Floors Deadbands. arid 00s are controlled by data spd Isq Wt WMpnwcl clatal~server\dalal\http\nd$_electrical pro1ects\mn2 apds\spd leu doc)

- __ -- __ __ - - ~ ~ ~ _ _ _

I-

~~~

Attachment 1 I Fixed Setpoint Radiation Monitors (Sheet 1 of 1 )

I IMONITOR r TYPE FUNCTION I LOCATION(S)

IRM-8139 I Area Monitor SFP Storage Area (S.W.) [ RC- 14A, ESAS ChaGn8"A" I RM-8142 IArea Monitor SFP Storage Area (N.W.) IRC- 14B, ESAS Channel"B (RM-8156 IArea Monitor SFP Storage Area (N.E.) I RC- 14C, ESAS ChaGel"C RM-8157 Area Monitor SFP Storage Area (S.E.) IRC - 14D,ESAS Channel "D" RM-8132B Process Unit 2 Stack Discharge Gaseous RC- 14C, C-06 RM -9049 Process Clean Liquid Waste Discharge RC- 14C, PIOPS RM-9116 Process Aerated Liquid Waste Discharge RC- 14C, PIOPS RM - 9095 Process Waste Gas Discharge RC- 14A, RE -245 Process CPF TK- 10/11 Liquid Discharge Local, CPF Rad Mon Panel RM - 8240 Area Monitor CTMT Post-Incident 14'6" East C- 101 I RM-8241 Area Monitor CTMT Post-Incident 14'6 West C- 101 I RM-8168A Ventilation High Range Stack, Particulate IC- 101,31'6" Switchgear RM -8168B Ventilation High Range Stack, Gaseous C - 101,31'6" Switchgear RM-9799A Ventilation Control Room Intake, Facility 1 C- 101 RM-9799B Ventilation RM -4299A Process RM -4299B Process I RM -4299C I Process I RM-8169 IVentilation Unit 2 Millstone Stack WRGM- IRC- 14E Continuous

. ~~ -

Attachment 2 Applicable Radiation Monitors (Sheet I of 1)

~

M 0NIT0 R FUNCTION TYPE RM-6038 RBCCW Gross Activity RM-9327 Cond Recovery Tank Gross Activity RM-8132A Unit 2 Stack Particulate Process RM-202A Failed Fuel Activity RM - 202B Letdown Gross Activity RM-8434A Aux Bldg Particulate (Evap, Waste Gas, AW Tk Farm)

RM-8434B Aux Bldg Gaseous (Evap, Waste Gas, AW Tk Farm)

RM-8011 Control Room Gross Activity RM -814SA Spent Fuel Pool Exhaust, Particulate RM-814SB Spent Fuel Pool Exhaust, Gaseous Ventilation RM-8997 Radwaste Exhaust Particulate (Degasifier, Chg PP, ESF Rms)

RM - 8998 I Radwaste VCT) Exhaust Particulate (Sample Sink, Letdown HX, I

Radwaste Exhaust Particulate (Evap, Waste Gas, AW Tk RM -8999 Farm)

RM - 7892 Drum Decon Area RM - 7594 Charging Pump Area RM - 7895 Primary Sample Sink Area RM-7896 1 I

-2.5'6" Waste Process Area Area Monitor RM -7897 1 -45'6" Waste Process Area I RM-7899 Control Room Area RM-9813 Resin Drumming, -45'6" Auxiliary Building RM-4262 S/G Blowdown Gross Activity Liquid On-Line RM-5099 Steam Jet Air Ejector Process RM - 7890 Personnel Access Area Area RM-7891 Containment Refuel Floor Area Monitor OP 2383C I, I I I. ! \ \ t - ~ ~ r ~

  • Rev.
012-02 Continuous 29 of 32

vetector # Type Function 1-4 5-8 10 & 12 D

c 0)

U C

I I

I CORE CROSS-SECTION i CORE LOCATION Designated 1 'thru 21 Figure 2

/M2110/24/86 18600 1 6 6 &

3/4.8 ELECTRICAL POWER SYSTEMS 314.8.1 A.C. SOURCES OPERAT I N6

, LIMITING CONDITION FOR OPERATIOh 3.8.1.1 As a minimum, the following A.C. electrical power sources s h a l l be OPERABLE:

a, Two physically independent c i r c u i h between the o f f s i t e t r a n s -

mission network and the onsite Class 1E distribution system, and

b. Two separate and independent diesel generators each w i t h a se arate fuel oil supply tank containing a minimum o f 12,000 ga lons o f fuel. . ~

APPLICABILITY: MODES 1, 2; 3 and 4-ACTION:

Inoperable Equipment Required Action

a. One offsite a.1 Perform Surveillance Requirement 4.8.1.1-1 circuit for remaining offsite c i r c u i t w i t h i n 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> prior t o o r after entering this condition, and a t l e a s t once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter .

AND a.2 Restore the inoperable o f f s i t e c i r c u i t t o OPERABLE status wfthin 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> o r be i n HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30

., hours..

. i

. . , .. t..

. 1 . . . . . .

I I, MILLSTONE - UNIT 2

ELECTRICAL POWER SYSTEMS ACTION (Continued)

January 4, 2002 Inoperable Equipment Required Action

b. One d i e s e l b. 1 . Perform S u r v e i l l a n c e Requirement 4.8.1 .I. 1 generator f o r t h e o f f s i t e circuits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> p r i o r t o o r after e n t e r i n g this c o n d i t i o n ,

and a t least Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> t h e r e a f t e r .

AND b.2 Demonstrate OPERABLE d i e s e l g e n e r a t o r is n o t inoperable due t o common cause f a i l u r e w i t h i n 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> o r perform S u r v e i l l a n c e Requirement 4.8.1.1.2.a.2 f o r the OPERABLE d i e s e l generator w i t h i n 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

AND b.3 Verify the steam-driven a u x i l i a r y -

feedwater pump is OPERABLE (NODES 1, 2, and 3 ' o n l y ) . I f this c o n d i t i o n i s n o t s a t i s f i e d w i t h i n 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, be i n a l e a s t HOT STANDBY within t h e next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT SHUTDOWN w i t h i n t h e following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.4' (Applicable only i f t h e 14 day allowed .-

outage time s p e c i f i e d i n Action Statement b.5 i s t o be used.) Verify the r e q u i r e d Millstone U n i t No. 3 d i e s e l g e n e r a t o r ( s )

i s / a r e OPERABLE and the M i l l s t o n e U n i t No.

3 SBO d i e s e l g e n e r a t o r is a v a i l a b l e w i t h i n 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> p r i o r t o o r a f t e r e n t e r i n g t h i s c o n d i t i o n , and a t l e a s t once p e r 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter. Restore any inoperable r e q u i r e d Millstone Unit No. 3 d i e s e l g e n e r a t o r t o OPERABLE s t a t u s and/or .

Millstone U n i t No.- 3 SBO d i e s e l g e n e r a t o r t o a v a i l a b l e s t a t u s w i t h i n 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> o r be i n HOT STANDBY w i t h i n the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN w i t h i n t h e following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

AND

b. 5 Restore t h e inoperable d i e s e l g e n e r a t o r t o OPEFUiBLE s t a t u s w i t h i n 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> ( w i t h i n 14 days if Action Statement b.4 i s met) or be i n HOT STANDBY w i t h i n the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN w i t h i n t h e following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

MILLSTONE - UNIT 2 3/4 8-la Amendment No. %$; 177, J$?,

P3L Z#L 261

January 4,2002 ELECTRICAL POWER SYSTEMS Corrected per NRC Letter dated 2-26-04 ACTION (Continued)

Inoperable Equipmen Required Action

c. Oneoffsite c. 1 Perfonn Surveillance Requirement 4.8. I. 1.1 for circuit remaining offsite c h i t within I hour and at least onc per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

AND AND One diesel generator c.2 Demonstrate OPERABLE diesel generator is not inoperable due to common cause failure within 8 how or perform Surveillance Requirement 4.8. I. I .2.a2 fox the OPERABLE diesel generator within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

4ND

.3 VerifL the steam-driven auxiliary feedwater pump is OPERABLE (MODES1,2, and 3 only). If this condition is not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

.4 Restore one inoperable A.C. source to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

ND 5 Restore remaining inoperable A.C. source to OPERABLE status following the time requirements of Action Statements a o r b above based on the initial loss ofthe remaining inoperable A.C. source. .

Two offsite I Restore one of the inoperable offsite sources to circuits OPERABLE statas within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

VD

! Following restoration of one offsite source restore remaining inoperable offsite source to OPERABLE ,

status following the time requirements of Action Statement a above based on the initial loss of the remaining inoperable offsite source.

... MILLSTONE - UNIT 2 3/4 8-2 Amendment No. W ,W, W ,261

July 25,2003 p

ACTION (Continued) inoperable Equipmegt Required Action

. Wodiesel e. 1 Perform Surveillance Requirement 4.8.1.1.1 for the generators offsite circuits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at leastpnce per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter.

AND e.2 Restore one of the inoperable diesel generators to OPERABLE s t a ~ swithin 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in HOT STANDBY withinthe next 6hours and COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

AND e.3 Following restoration of one diesel genemtor restore remaining inoperable diesel generator to OPERABLE status following the time requirements of Action Statement b above basedon the initial Ioss of the remaining inoperable diesel generator.

SUR'VEILLANCEREQUIREMENTS 4.8.1.1.1 Verify correct breaker alignment and indicated power available for each r e e d offsite circuit at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I 1

MILLSTONE - UNIT 2 3/4 8-2a Amendment No.434; 23+,277 - -2

~~

ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: Date of Exam:

Initial a b' c" 4

NIA .'/

NIA

,q J

e NIA 4 WA N/A NIA N/A

- the examinations were developed independently r

- the licensee certifies that there is no duplication

- other (explain) rJ

~ 6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest NIA new or modified); enter the actual RO / SRO-only question distribution(s) at right.

2517 1215 381 13 6 T

7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension/ analysis level; NIA the SRO exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter 32111 431 14 the actual RO / SRO question distribution@)at right.
  1. L v NIA 6

- Date a.

b.

Author Facility Reviewer (*)

Peter Presbvl &%

NIA - /

d 03/17/05

c. NRC Chief Examiner (#) Joe D'Antonio I //v.i >./An 1
d. NRC Regional Supervisor Richard Conte I ' /~&df~-,! -\

1 u

Note: The facility reviewer's initialslsignatureare not applicable for NRC-developedexaminations.

  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

NOTE: - Written Exam Quality Checklist covers entire written exam submitted to licensee in final format for administration.

NUREG-1021, Final Revision 9

ES-401 Written Examination Qualitv Checklist Form ES-401-6 I Facility: Date of Exam:

I Exam Level: ROISRC Initial 1.

Item Description Questions and answers are technically accurate and applicable to the facility. A a

Ts I N/A

2. a. NRC WAS are referenced for all questions. N/A
b. Facility learning objectives are referenced as available. /e -

3.

4.

SRO questions are appropriate in accordance with Section D.2.d of ES-401 If more than four RO and two SRO questions are repeated from the last two NRC licensing exams, the facility licensee's sampling process was random and systematic.

AL I

I N/A I

7 N/A

6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest NIA new or modified); enter the actual RO ISRO-only 2417 1215 391 13 question distribution(s) at right.
7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension/ analysis level; N/A the SRO exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter 31 I 1 0 4 4 1 15 the actual RO I SRO question distribution(s) at right.
8. Referenceslhandoutsprovided do not give away answers N/A or aid in the elimination of distractors. /e
9. Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; N/A deviations are justified. l.t A-
10. Question psychometric quality and format meet the guidelines in ES Appendix B. /zc NIA a-
11. The exam contains the required number of one-point, multiple choice items; NIA the total is correct and agrees with the value on the cover sheet. A/

"J Printed Name I Signature Date a.

b.

Author Facility Reviewer r)

Peter Presby I /xe N/A /

02/24/05

c. NRC Chief Examiner (#) Joe DAntonioI , A & \
d. NRC Regional Supervisor Richard Conte I (c='u Note: The facility reviewer's initialslsignature are not applicable for NRCdeveloped examinations.
  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

NOTE: - Written Exam Quality Checklist covers 100 Questions resubmitted for licensee review following resolution of validation week comments.

NUREG-1021, Final Revision 9

ES-401 Written Examination Quality Checklist Form ES-401-6 lnitiil Item Description a b c

1. Questions and answers are technically accurate and applicaMe to the facility. & N/A ,/
2. a. NRC WAs are referenced for all questions. NIA .OJ
b. Facility learning objectives are referenced as avalable. fi N/A R,
6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest N/A new or modifd); enter the actual RO ISRO-only 2517 1215 3a1i3 question distribution(s) at right.
7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension/analysis level; N/A the SRO exam may exceed 60 percent if the randomly selected WAS suppoct the higher cognitive levels; enter 31 110 441 15 the actual RO I SRO question distributiin(s) at right.
8. Referenceshadouts provided do not give away answers or aid in the elimination of dstractors.
9. Question content conforms with specific WA statements in the previously approved examination outline and is appropriate for the tier to which hey are assigned; NIA d e v i a t i i are justified. -

A- -

10. Question psychometric
  • qualily and format meet the guidelines in ES Appendix B. b N/A 4-
11. The e m contains the required number d onepoint, rnuH@kchoice items; the btal is conect and agrees with the value on the coversheet.

+ NIA Y Printed Name I Sianature Date

a. Author
b. Facility Reviewer c)

Peter P r e w 1 ~ m & 02/07/05

c. NRC Chief Examiner (W) JoeDAntcmioI / rPJ{&
d. NRC Regional Supervisor Note: The facility reviewers httialdsignature are not applicable(or N#Cdeveloped examinations.
  1. Idependd NRC reviewer Initial items in Cdumn b; CNef e m i n e r concurrence required. ~

NOTE: - Written Exam Quality Checklist covers 38 Questions (51-75,88-100) for ld time submittal and 62 questions resubmittedfor licensee review folowing initial comment resolution NUREG-1021, Final Revision 9

ES-401 Written Examination Quality Checklist Form ES-401-6 Date of Exam: Exam Level: ROISRC I

Initial Item Description a bo

1. Questions and answers are technically accurate and applicable to the facility. 4 9 /f
2. a. NRC WAS are referenced for all questions.
b. Facility learning objectives are referenced as available. A 9 . U
3. SRO questions are appropriate in accordance with Section D.2.d of ES-401 A O f
4. If more than four RO and two SRO questions are repeated from the last two NRC licensing exams, the facility licensees sampling process was random and systematic.
6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO I SRO-only 3

21 1 5 513 2414 question distribution@)at right.

7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter 2015 3017 the actual RO I SRO question distribution(s) at right.
8. Referencesfhandoutsprovided do not give away answers or aid in the elimination of distractors. Ah 4arc4rcts I

9 Question content conforms with specific WA statements in the previously approved examination outline andls appropriate for the tier to which they are assigned; deviations are justified. 1- J-

10. Question psychometric quality and format meet the guidelines in ES Appendix B. )as 11.

7rs rrr The exam contains the required number of one-point, multiple choice item?;

the total is correct and agrees with the value on the cover sheet.

&k f e R-Printed Name I Signature Date

a. Author Peter Presby I & 45.4 01/12/05
b. Facility Reviewer (*) NIA I
c. NRC Chief Examiner (#) Joe DAntonio I [fi d f d - -
d. NRC Regional Supervisor Richard Contel / c Note: The facility reviewers initialdsignature are not applicable for NRC-developedexaminations.
  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

NOTE: - Written Exam Quality Checklist covers 32 Questions (27-50,80-87) 3 - Items 6 & 7 include the first 30 Questions (1-26, 76-79)

NUREG-1021, Final Revision 9

ES-401 Written Examination Quality Checklist Form ES-401-6 Facility: Date of Exam: Exam Level: ROlSR(

I n

@$$ /J v

K

~

Item Description a C'

1. Questions and answem are technicalll) accurate and applicable to the facility. b P
2. a. NRC WAS are referenced for all questions.
b. Facility learning objectives are referenced as available.
3. SRO questions are appropriate in accordance with Section D.2.d of ES-401
4. If more than four RO and two SRO questions are repeated from the last two NRC licensing exams, the facility licensee's sampling process was random and systematic.
6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RO ISRO-only question distribution(s) at right. 151) 0 12 L L l l
7. Between 50 and 60 percent of the questions on the RO Memory CIA exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly selected WAS support the higher cognitive levels; enter I I the actual RO ISRO question distribution(s) at right.
8. Referenceshandoutsprovided do not give away answers ,A or aid in the elimination of distractors. /c/o /;Q.uC/Euf-S /vA ,7
9. Question content conforms with specific WA statements in the Dreviouslv amroved I I I examination outline and is appropriate for the tier to which they'are assign&(

deviations are justified. &p n

10. Question psychometric quality and format meet the guidelines in ES Appendix B. e 17

-5f /-?of-

11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.

II Printed Name I Signature Date

a. Author
b. Facility Reviewer (*)
c. NRC Chief Examiner (#)
d. NRC Regional Supervisor Richard Conte I '

v Note: The facility reviewer's initialstsignature are not applicable for NRC-developed examinations.

  1. Independent NRC reviewer initial items in Column "c"; chief examiner concurrence required.

NOTE: Written Exam Quality Checklist covers 30 Questions (1-26, 76-79)

NUREG-1021, Final Revision 9