ML051370371

From kanterella
Jump to navigation Jump to search
April 2005 Monthly Operating Report for Oyster Creek Generating Station
ML051370371
Person / Time
Site: Oyster Creek
Issue date: 05/11/2005
From: Swenson C
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2130-05-20084, GL-97-002
Download: ML051370371 (2)


Text

AmerGen.SM I

AmerGen Energy Company, LLC Oyster Creek US Route 9 South, P.O Box 388 Forked River, NJ 08731-0388 www.exeloncorp.com An Exelon Company GL 97-02 May 11, 2005 2130-05-20084 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating License No. DPR-1 6 NRC Docket No. 50-219

Subject:

Monthly Operating Report - April 2005 Enclosed is the April 2005 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.

If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.

Sincerqj4>

A C.

Swnson Vice President, Oyster Creek Generating Station CNS/DIF Enclosure cc:,'

S. J. Collins, Administrator, USNRC-Region.I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior-Resident Inspector, Oyster Creek File No. 05002 jg2kI

OPERATING DATA REPORT DOCKET NO.

50 UNIT NAME m

DATE 1W1I COMPLETED BY fc TELEPHONE

(

REPORTING PERIOD:

-219 yster Creek 1 hay 06, 200 iger a. Gayley

)9) 971-4406 April 2005 1.

2.

Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 650.00 619.00 3.

4.

5.

6.

Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)

This Month 719.00 719.00 0.00 445,546.00 Yr-to-Date 2,879.00 2,879.00 0.00 1,810,212.00 Cumulative 229,358.50 225,049.45 918.20 129,051,936.0 UNIT SHUTDOWNS

SUMMARY

During April Oyster Creek generated 445,546 net MWh electric, which was 100.1 % of its MDC rating.

1 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

1 Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

Page 1 of 1