ML051360005

From kanterella
Jump to navigation Jump to search

Tech Spec Pages for Amendments 213 & 205, Re the Deletion of Technical Specification Requirements to Maintain Hydrogen Recombiners and Hydrogen/Oxygen Monitors and Related Surveillance Requirements
ML051360005
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/28/2005
From: Banerjee M
NRC/NRR/DLPM/LPD3
To: Crane C
Exelon Generation Co
Banerjee M, NRR/DLPM, 415-2277
Shared Package
ML050960476 List:
References
TAC MC4494, TAC MC4495
Download: ML051360005 (2)


Text

PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS NOTES ---------------------------------

1.

These SRs apply to each Function in Table 3.3.3.1-1, except where identified in the SR.

2.

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the other required channel in the associated Function is OPERABLE.

SURVEILLANCE FREQUENCY SR 3.3.3.1.1 Perform CHANNEL CHECK.

31 days SR 3.3.3.1.2 Perform CHANNEL CALIBRATION for 92 days Function 4.b.

SR 3.3.3.1.3


NOTE------------------

For Function 2, not required for the transmitters of the channels.

Perform CHANNEL CALIBRATION for Functions 184 days 1 and 2.

SR 3.3.3.1.4 Perform CHANNEL CALIBRATION for Functions 12 months 3 and 9.

SR 3;3.3.1.5 Perform CHANNEL CALIBRATION for Functions 24 months 2, 4.a, 5, and 6.

I Dresden 2 and 3 3.3.3.1-3 Amendment No. /

213/205

PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page I of II Post Accident Monitoring Instrumentation CONDITIONS REFERENCED REOUIRED FROM REOUIRED FUNCTION CHANNELS ACTION D.1

1. Reactor Vessel Pressure 2

E

2. Reactor Vessel Water Level
a. Fuel Zone (Wide Range) 2 E
b. Medium Range 2

E

3. Torus Water Level 2

E

4. Drywell Pressure a, Wide Range 2

E

b.

Narrow Range 2

E

5. Drywell Radiation Monitors 2

F

6. Penetration Flow Path PCIV Position 2 per penetration E

flow path(a)(b)

7.

(Deleted)

E. (Deleted)

9.

Torus Water Tecperature 2

E (a) Not required for Isolation valves whose associated penetration flow path is Isolated by at least one closed and deactivated automatic valve, closed manual valve, blind flange, or check valve with flow through the valve secured.

(b) Only one position Indication channel is required for penetration flow paths with only one Installed control room Indication channel.

I Dresden 2 and 3 3.3.3.1-4 rAmendment ND. / 2137205