Letter Sequence Approval |
|---|
TAC:MC4493, Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors (Approved, Closed) |
|
MONTHYEARRS-04-141, Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process2004-09-15015 September 2004 Amergen Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process Project stage: Request ML0513600052005-04-28028 April 2005 Tech Spec Pages for Amendments 213 & 205, Re the Deletion of Technical Specification Requirements to Maintain Hydrogen Recombiners and Hydrogen/Oxygen Monitors and Related Surveillance Requirements Project stage: Other ML0512503432005-04-28028 April 2005 4/28/05, Clinton Unit 1 - Issuance of Amendment Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process Project stage: Approval ML0509604722005-04-28028 April 2005 License Amendments 213 & 205, Re the Deletion of Technical Specification Requirements to Maintain Hydrogen Recombiners and Hydrogen/Oxygen Monitors and Related Surveillance Requirements Project stage: Other ML0509101942005-04-28028 April 2005 4/28/05, Clinton Unit 1 - Issuance of Amendment Request for Amendment to Technical Specifications to Eliminate Requirements for Hydrogen Recombiners and Hydrogen/Oxygen Monitors Using the Consolidated Line Item Improvement Process Project stage: Approval ML0514001732005-05-19019 May 2005 Technical Specifications, Issuance of Amendment Hydrogen Recombiners & Hydrogen Monitors Project stage: Approval ML0514001812005-05-26026 May 2005 Technical Specifications, Issuance of Amendment Hydrogen Recombiners & Hydrogen Monitors Project stage: Approval ML0509505882005-05-26026 May 2005 License Amendments, Issuance of Amendment Hydrogen Recombiners & Hydrogen Monitors Project stage: Approval ML0514600752005-06-0909 June 2005 Correction to Notice of Issuance of Amendments to Facility Operating Licenses Project stage: Approval 2005-05-19
[Table View] |
Text
PAM Instrumentation 3.3.3.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.3.3.1.1
NOTE---------------------
Applicable for each Function in Table 3.3.3.1-1.
Perform CHANNEL CHECK.
31 days SR 3.3.3.1.2 Deleted SR 3.3.3.1.3
NOTE---------------------
Applicable for each Function in Table 3.3.3.1-1.
Perfo____CANELCALIBRAT__O_._____onhs Perform CHANNEL CALIBRATION.
1B months I
CLINTON 3.3-21 Amendment No. 164
PAM Instrumentation 3.3.3.1 Table 3.3.3.1-1 (page 1 of 1)
Post Accident Monitoring Instrumentation CONDITIONS REFERENCED FROM REOUIRED REQUIRED FUNCTION CITUELS ACTION D.1
- 1. Reactor Steam Dome Pressure 2
E
- 2. Reactor Vessel Water Level 2
E
- 3. Suppression Pool Water Level
- a. High Range 2
E
- b. Low Range 2
E
- 4.
Drywell Pressure 2
E
- 5. Primary Containment Area Radiation 2
F
- 6. Drywell Area Radiation 2
F
- 7. Penetration Plow Path, Automatic PCIV Position 2 per penetration E
flow, path "
S. Deleted
- 9. Primary Containment Pressure
- a. High Range 2
E
- b. Low Range 2
E
- 10. Suppression Pool Water Bulk Average Temperature 21cE I
(a) Not required for isolation valves whose associated penetration flow path is isolated.
(b) Only one position indication channel is required for penetration flow paths with only one installed control room indication channel.
(c) Monitoring each quadrant.
CLINTON 3.3 -22 Amendment No. 164
3.6.3.1 3.6 CONTAINMENT SYSTEMS 3.6.3.1 Deleted CLINTON 3.6-36 Amendment No164
3.6.3.1 This page intentionally blank CLINTON 3.6-37 Amendment No.164