Notification of Triennial Fire Protection Baseline Inspection - 05000400-2005-007
ML051310093
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/11/2005
From: Payne D
NRC/RGN-II/DRS/EB
To: Scarola J
Carolina Power & Light Co, Progress Energy Carolinas
References
IR-05-007
Download: ML051310093 (6)


See also: IR 05000400/2005007

Text

May 11, 2005

Carolina Power and Light Company

ATTN: Mr. James Scarola

Vice President - Harris Plant

Shearon Harris Nuclear Power Plant

P. O. Box 165, Mail Code: Zone 1

New Hill, North Carolina 27562-0165

SUBJECT:

NOTIFICATION OF TRIENNIAL FIRE PROTECTION BASELINE INSPECTION

(NRC INSPECTION REPORT 05000400/2005007)

Dear Mr. Scarola:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a triennial fire protection baseline inspection of the Shearon Harris

Nuclear Power Plant Unit 1 in August 2005. The inspection team will be led by

Mr. McKenzie Thomas, NRC Senior Reactor Inspector, of the Region II Office. The team will

be composed of personnel from the NRC Region II Office. The inspection will be conducted in

accordance with the NRCs baseline fire protection inspection procedure 71111.05T.

The inspection objective will be to evaluate your fire protection program implementation with

emphasis on post-fire safe shutdown capability and the fire protection features provided to

ensure at least one post-fire safe shutdown success path is maintained free of fire damage.

The inspection team will focus their review on the separation of the systems and equipment

necessary to achieve and maintain safe shutdown and fire protection features of selected fire

areas.

On May 9, 2005, during a telephone conversation between Mr. Dave Corlett, Supervisor,

Licensing/Regulatory Programs, and Mr. Thomas, our respective staffs confirmed

arrangements for a three-day information gathering site visit and a two-week onsite inspection.

The schedule for the inspection is as follows:

C

Information gathering visit:

Week of July 25-29, 2005

C

Week 1 of onsite inspection: August 15-19, 2005

Week 2 of onsite inspection: August 29 - September 2, 2005

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection and to become familiar with the Harris Nuclear Plant fire

protection program features, post-fire safe shutdown capabilities, and plant layout. The types

of documents the team will be interested in reviewing, and possibly obtaining, are listed in the

Enclosure. Please contact Mr. Thomas prior to preparing copies of the materials listed in the

Enclosure. The inspection team will try to minimize your administrative burden by specifically

identifying those documents required for inspection preparation.

CP&L

2

During the information gathering visit, the team will also discuss the following inspection support

administrative details: office space; specific documents requested to be made available to the

team in their office space; arrangements for reactor site access (including radiation protection

training, security, safety and fitness for duty requirements); and the availability of

knowledgeable plant engineering and licensing organization personnel to serve as points of

contact during the inspection.

We request that during the onsite inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the Harris

Nuclear Plant fire protection program, including post-fire safe shutdown capability, be readily

accessible to the team for their review. Of specific interest are those documents which

establish that your fire protection program satisfies NRC regulatory requirements and conforms

to applicable NRC and industry fire protection guidance. Also, personnel should be available at

the site during the inspection who are knowledgeable regarding those plant systems required to

achieve and maintain safe shutdown conditions from inside and outside the control room

(including the electrical aspects of the relevant post-fire safe shutdown analyses), reactor plant

fire protection systems and features, and the Harris Nuclear Plant fire protection program and

its implementation.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection or the inspection team's information or logistical needs, please

contact Mr. Thomas at (404) 562-4673, or me at (404) 562-4669.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

\\\\RA\\\\

D. Charles Payne, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No.:

50-400

License No.:

NPF-63

Enclosure: Triennial Fire Protection Inspection Support Documentation

cc w/encl: (See page 3)

CP&L

3

cc w/encl:

Chris L. Burton, Manager

Performance Evaluation and

Regulatory Affairs CPB 9

Carolina Power & Light Company

Electronic Mail Distribution

Robert J. Duncan II

Director of Site Operations

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

Benjamin C. Waldrep

Plant General Manager--Harris Plant

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

Terry C. Morton, Manager

Support Services

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

David H. Corlett, Supervisor

Licensing/Regulatory Programs

Carolina Power & Light Company

Shearon Harris Nuclear Power Plant

Electronic Mail Distribution

Steven R. Carr

Associate General Counsel - Legal

Department

Progress Energy Service Company, LLC

Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Beverly Hall, Acting Director

Division of Radiation Protection

N. C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Peggy Force

Assistant Attorney General

State of North Carolina

Electronic Mail Distribution

Public Service Commission

State of South Carolina

P. O. Box 11649

Columbia, SC 29211

Chairman of the North Carolina

Utilities Commission

c/o Sam Watson, Staff Attorney

Electronic Mail Distribution

Robert P. Gruber

Executive Director

Public Staff NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

Herb Council, Chair

Board of County Commissioners

of Wake County

P. O. Box 550

Raleigh, NC 27602

Tommy Emerson, Chair

Board of County Commissioners

of Chatham County

Electronic Mail Distribution

Enclosure

Triennial Fire Protection Inspection Support Documentation

[Note: This is a broad list of the documents the NRC inspection team may be interested

in reviewing, and possibly obtaining, during the information gathering site visit. The

current version of these documents is expected unless specified otherwise. Electronic

media is preferred, if readily available. (The preferred file format is searchable .pdf

files on CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of

use. Please provide 5 copies of each CDROM submitted.) Information in lists should

contain enough information to be easily understood by someone who has a knowledge

of the technology. The lead inspector will discuss specific information needs with the

licensee staff and may request additional documents.

1.

The current version of the Fire Protection Program and Fire Hazards Analysis.

2.

The fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

3.

Fire brigade training program document and the pre-fire plans for the selected fire

areas/zones (to be determined during information gathering visit).

4.

The post-fire safe shutdown analysis, including system and separation analyses.

5.

The alternative shutdown analysis.

6.

Piping and instrumentation (flow) diagrams for the fire suppression systems.

7.

Piping and instrumentation (flow) diagrams for the systems and components used to

achieve and maintain hot standby, and cold shutdown, for fires involving shutdown from

the control room.

8.

Piping and instrumentation (flow) diagrams for the systems and components used to

achieve and maintain hot standby, and cold shutdown, for fires in areas requiring

alternative or dedicated shutdown capability.

9.

Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment.

10.

Plant layout drawings which identify plant fire area and/or fire zone delineation, areas

protected by automatic fire suppression and detection, and the locations of fire

protection equipment for the selected fire areas/zones (to be determined during

information gathering visit).

11.

Plant layout drawings which identify the general location of the post-fire emergency

lighting units.

12.

Plant operating procedures used to, and describing, shutdown from inside the control

room with a postulated fire occurring in any plant area outside the control room.

2

Enclosure

13.

Plant operating procedures used to implement the alternative shutdown capability from

outside the control room with a fire in either the control or cable spreading room (or any

other alternative shutdown area).

14.

Maintenance and surveillance testing procedures for alternative shutdown capability

(including Appendix R emergency lights and communication systems) and fire barriers,

detectors, fire pumps and fire suppression systems.

15.

Calculations and/or justifications that verify fuse/breaker coordination for the selected

fire areas/zones (to be determined during information gathering visit) that are fed off the

same electrical buses as components in the protected train. Also, a list of the

maintenance procedures used to routinely verify fuse/breaker coordination in

accordance with the post-fire safety shutdown coordination analysis.

16.

A list of the significant fire protection and post-fire safe shutdown design change

descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter (GL) 86-10 evaluations.

17.

A list of the protection methodologies (as identified in 10 CFR Part 50, Appendix R,

Section III.G) used to achieve regulatory compliance for the selected fire areas/zones

(to be determined during information gathering visit). That is, please specify whether

3-hour rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and

suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression

(Section III.G.2.c), or alternative dedicated shutdown capability (Section III.G.3) is used

for the selected fire areas/zones.

18.

Procedures or instructions that govern the implementation of plant modifications,

temporary modifications, maintenance, and special operations, and their impact on fire

protection.

19.

Organization chart(s) of site personnel down to the level of the fire protection staff.

20.

Procedures or instructions that control the configuration of the fire protection program,

features, and post-fire safe shutdown methodology and system design.

21.

A list of applicable codes and standards related to the design of plant fire protection

features and evaluations of code deviations (i.e., a listing of the NFPA code editions

committed to (Code of Record)).

22.

The three most recent fire protection QA audits and/or fire protection self-assessments.

23.

A list of open and closed fire protection problem identification and resolution reports

[also know as action requests/condition reports/problem reports/problem investigation

reports/NCRs/EARs] associated with fire protection or Appendix R safe shutdown for the

past three years.

3

Enclosure

24.

A list of plant fire protection licensing basis documents (i.e., a list of the SERs and

change evaluations which form the licensing basis for the facilitys post-fire safe

shutdown configuration).

25.

A list of fire protection or Appendix R calculations.

26.

A list of fire impairments identified during the previous year.

27.

A list of abbreviations/designators for plant systems.