AmerGen SM AmnerGen Energy Company, LLC Oyster Creek US Route 9 South, P.O. Box 388 Forked River, NJ 08731-0388 www.exeloncorp.coM An Exelon Company GL 97-02 April 14, 2005 2130-05-20072 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 - 0001 Oyster Creek Generating Station Facility Operating Ucense No. DPR-16 NRC Docket No. 50-219
Subject:
Monthly Operating Report - March 2005 Enclosed is the March 2005 Monthly Operating Report for Oyster Creek Generating Station. The content and format of information submitted in this report is in accordance with the guidance provided by Generic Letter 97-02.
If any further information or assistance is needed, please contact David Fawcett at 609-971-4284.
Sincerely, Da C. N. Swenson Vice President, Oyster Creek Generating Station CNS/DIF Enclosure cc:
S. J. Collins, Administrator, USNRC Region I P. S. Tam, USNRC Senior Project Manager, Oyster Creek R. J. Summers, USNRC Senior Resident Inspector, Oyster Creek File No. 05002
- ) q
,I
OPERATING DATA REPORT DOCKET NO.
5G UNIT NAME O
DATE V
COMPLETED BY TR TELEPHONE (6C REPORTING PERIOD:
-219 yster Creek 1 pril 11, 2005 iger B. Gayley
)9) 971-4406 March 2005 1.
2.
Design Electrical Rating Maximum Dependable Capacity (MWe-Net) 650.00 619.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00
- 0.00 465,336.00 Yr-to-Date 2,160.00 2,160.00 0.00 1,364,666.00 Cumulative 228,639.50 224,330.45 918.20 128,606,390.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments
SUMMARY
- During March Oyster Creek generated 465,336 net MWh electric, which was 101.0% of its MDC rating.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
Page 1 of I