ML051220483
| ML051220483 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 04/29/2005 |
| From: | Conte R NRC/RGN-I/DRS/OSB |
| To: | Crane C AmerGen Energy Co |
| Shared Package | |
| ML042440457 | List: |
| References | |
| Download: ML051220483 (4) | |
Text
April 29, 2005 Mr. Christopher M. Crane President and CEO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - OYSTER CREEK
Dear Mr. Crane:
In a telephone conversation on April 28, 2005, Mr. Stephen Barr, Region I Senior Operations Engineer, and Mr. Jesse D. Hackenberg, Oyster Creek Operations Training Manager, made arrangements for the NRC to inspect the licensed operator requalification program at the Oyster Creek facility. The inspection is planned for the week of June 13, 2005, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the week of the inspection to the NRC by June 6, 2005. Mr.
Hackenberg has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
2 Mr. Christopher M. Crane The NRC may not conduct or sponsor, and a person is not required to respond to a collection of information, unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Barr at (610) 337-5316.
Sincerely,
/RA/
Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-219 License No. DPR-16 cc w/encl:
Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen T. ONeill, Associate General Counsel, Exelon Generation Company J. Fewell, Assistant General Counsel, Exelon Nuclear Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township J. Lipoti, Ph.D., Assistant Director of Radiation Programs, State of New Jersey K. Tosch - Chief, Bureau of Nuclear Engineering, NJ Dept. of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign W. Costanzo, Technical Advisor - Jersey Shore Nuclear Watch E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance Director of Training - Oyster Creek, AmerGen S. Glenn, INPO
3 Mr. Christopher M. Crane Distribution w/encl: VIA E-MAIL S. Collins, RA J. Wiggins, DRA W. Lanning, DRS R. Conte, DRS S. Barr, Chief Examiner, DRS C. Bixler, DRS A. Burritt, DRP R. Summers, DRP, Senior Resident Inspector J. Herrera, DRP, Resident Inspector J. DeVries, DRP, Resident OA S. Lee, RI OEDO R. Laufer, NRR P. Tam, PM, NRR T. Colburn, NRR L. Vick, HOHB, NRR E:\\Filenet\\ML051220483.wpd ADAMS PKG: ML042440457 SISP Review Complete: RJC After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OSB RI/DRS/OSB RI/DRS/OSB NAME CJBixler/STB for STBarr/STB RJConte/RJC DATE 04/29/05 04/29/05 04/29/05 OFFICIAL RECORD COPY