Letter Sequence RAI |
---|
|
|
MONTHYEARML0511800422005-05-0909 May 2005 RAI, Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspection Project stage: RAI ML0535500292005-12-22022 December 2005 Response to Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections (Tac No. MC4859) Project stage: Other 2005-12-22
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-24-097, Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 12024-10-23023 October 2024 Notice of Intent to Pursue Subsequent License Renewal for Three Mile Island Nuclear Station, Unit 1 ML24256A0422024-10-0404 October 2024 Updated Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24242A3032024-09-0909 September 2024 Letter - Three Mile Island Station, Unit 2, Issuance of Amendment No. 68, Historic and Cultural Resources IR 05000320/20240012024-08-28028 August 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report Nos. 05000320/2024001 and 05000320/2024002 ML24240A2222024-08-27027 August 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24135A3292024-08-0909 August 2024 Amendment No 68, Historic and Cultural Resources Cover Letter IR 07200077/20240012024-06-18018 June 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 07200077/2024001 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24135A1972024-06-13013 June 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0091 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24120A3242024-05-24024 May 2024 TMI-2 Email to Fws RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24120A2552024-04-29029 April 2024 Annual Radiological Environmental Operating Report ML24113A0212024-04-18018 April 2024 (TMI-2), Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A0012024-03-28028 March 2024 (TMI-2), Decommissioning Trust Fund Annual Report ML24088A0122024-03-28028 March 2024 Notification of Amended Post-Shutdown Decommissioning Activities Report (PSDAR) in Accordance with 10 CFR 50.82(a)(7), Revision 6 ML24065A0042024-03-28028 March 2024 Submittal of 2023 Aircraft Movement Data Annual Report ML24085A2152024-03-25025 March 2024 (TMI-2) - Annual Notification of Property Insurance Coverage RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML24052A0602024-03-20020 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0061 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24075A0062024-03-14014 March 2024 List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project ML24074A3922024-03-14014 March 2024 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24044A0092024-02-12012 February 2024 License Amendment Request – Three Mile Island, Unit 2, Historic and Cultural Resources Review, Response to Request for Additional Information IR 05000320/20230042024-02-0707 February 2024 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023004 ML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 2024-09-09
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24220A2742024-08-15015 August 2024 Request for Additional Information Clarification Call Regarding Three Mile Island Station, Unit 2, Amended Post-Shutdown Decommissioning Activities Report, Rev. 6 ML24157A3672024-06-13013 June 2024 Updated Post-Shutdown Decommissioning Activities Report Request for Additional Information Transmittal Letter ML24011A2352024-01-11011 January 2024 Eco Request for Additional Information for 2023 License Amendment Request 1-11-24 ML23187A0202023-06-29029 June 2023 TMI Unit 2 RAI Related to the Amended Post-Shutdown Decommissioning Activities Report ML23187A0332023-06-29029 June 2023 TMI Unit 2, PSDAR Rev. 5 RAIs ML23082A3432023-03-31031 March 2023 Enclosure - RAI - Three Mile Island, Unit 2 - Acceptance Review and Request for Additional Information for the Historic and Cultural Resources License Amendment Request - EPID: 2023-LLA-0026 ML22357A0142022-12-22022 December 2022 NRC Request for Additional Information Related to the TMI-2 Pdms Transition License Amendment Request ML22210A0882022-07-29029 July 2022 Enclosure - Three Mile Island, Unit No. 2 - Request for Additional Information for Requested Licensing Action Regarding Decommissioning Technical Specifications ML22143A8902022-05-23023 May 2022 Request for Additional information- TMI-1 ISFSI Only Physical Security License Amendment Request ML22125A0122022-04-28028 April 2022 Clarification RAI Partial Response Email from C Smith to a Snyder ML22110A0202022-04-19019 April 2022 Unit 1 Request for Additional Information ML22038A9362022-02-0707 February 2022 TMI2 Accident Analyses Questions ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML20164A0902020-06-10010 June 2020 Request for Additional Information Related to TMI-1 License Amendment Request to Delete Permanently Defueled Technical Specification 3/4.1.4 (L-2019-LLA-0250) ML19319B2082019-11-15015 November 2019 NRR E-mail Capture - Request for Additional Information Related to TMI-1 Request for Exemption from Portions of 10 CFR 50.47 and Part 50 Appendix E (L-2019-LLA-0216) ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML18220A7832018-08-0707 August 2018 NRR E-mail Capture - Request for Additional Information Related to TMI Fall 2017 Steam Generator Tube Inspection Report ML18212A2712018-07-31031 July 2018 NRR E-mail Capture - Request for Additional Information Related to Amendment Regarding Decommissioning ERO Staffing Changes ML17285B1962017-10-27027 October 2017 Request for Additional Information Regarding Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools. ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16356A4802016-12-21021 December 2016 NRR E-mail Capture - RAIs on TMI License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16337A0072016-12-0101 December 2016 NRR E-mail Capture - Draft RAIs Three Mile Island Nuclear Station, Units 1 and 2, License Amendment Request for Approval of Changes to the Three Mile Island Nuclear Station Emergency Plan Related to Staffing ML16287A4042016-10-11011 October 2016 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML15230A5332015-08-18018 August 2015 Draft Request for Additional Information ML15020A7372015-03-0808 March 2015 Request for Additional Information Regarding Related to December 22, 2014, Report Submitted Pursuant to 10 CFR 50.46 ML14307A1172014-11-14014 November 2014 Request for Additional Information Regarding Relief Request RR-14-01 Concerning Alternative Root Mean Square Depth Sizing Requirements ML14240A4122014-09-0404 September 2014 Request for Additional Information Regarding License Amendment Request to Eliminate Certain Technical Specification Reporting Requirements (Tac MF0628) ML14134A3222014-05-22022 May 2014 Request for Additional Information Regarding Review of Three Mile Island Nuclear Station Unit 1 Cycle 20 Core Operating Limits Report ML14134A1722014-05-14014 May 2014 Draft RAIs in Support of NRC Staff Review of TMI Cycle 20 COLR ML14052A2592014-02-27027 February 2014 Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specification Reporting Requirements ML14030A5832014-01-29029 January 2014 Draft Request for Additional Information Proposed Revision to Technical Specifications Reporting Requirements Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1 ML13266A2852013-10-21021 October 2013 Request for Additional Information on Three Mile Island Nuclear Station Unit 2 - post-shutdown Decommissioning Activities Report ML13276A6492013-10-0303 October 2013 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML13269A1792013-09-25025 September 2013 Draft Request for Additional Information ML13253A2252013-09-10010 September 2013 Draft Request for Additional Information ML13249A2072013-09-0505 September 2013 Draft Request for Additional Information ML13193A1752013-07-22022 July 2013 Request for Additional Information Regarding Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values ML13196A3382013-07-15015 July 2013 2013 Decommissioning Fund Report RAI ML13193A1452013-07-12012 July 2013 Electronic Transmission, Draft Request for Additional Information Regarding Proposed Revision to Pressure and Temperature Limit Curves and Exemption Request for Initial Reference Temperature Values (TAC Nos. MF0425 & MF0426) ML13176A4702013-06-26026 June 2013 Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13177A3902013-06-26026 June 2013 Electronic Transmission, Draft Request for Additional Information Regarding Overall Integrated Plan in Response to Order Number EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13066A2442013-03-19019 March 2013 Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13066A1262013-03-0707 March 2013 Electronic Transmission, Draft Request for Additional Information Regarding Fifth Inservice Test Interval Relief Request PR-01 Nuclear Services Closed Cooling Water Flow Measurement ML13044A3212013-03-0505 March 2013 Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13045A6432013-02-25025 February 2013 Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval ML13051A3852013-02-25025 February 2013 Request for Additional Information Regarding End-of-Interval Relief Request RR-12-01, Pressure Nozzle-to-Head Weld Exams ML13050A6362013-02-20020 February 2013 Draft RAI Memo ML13044A3122013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding 30-Day Report for Emergency Core Cooling System Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML13044A6652013-02-13013 February 2013 Electronic Transmission, Draft Request for Additional Information Regarding Relief Request VR-01, Associated with the Fifth Inservice Testing Interval 2024-08-15
[Table view] |
Text
May 9, 2005 Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1) RESPONSE TO GENERIC LETTER (GL) 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTION, DATED AUGUST 30, 2004 (TAC NO. MC4859)
Dear Mr. Crane:
By letter dated October 29, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML043060328), AmerGen Energy Company, LLC (the licensee),
submitted its response to GL 2004-01 for TMI-1.
The Nuclear Regulatory Commission staff has determined that it will need the additional information identified in the enclosure to this letter in order to complete its review of the subject GL. As discussed with and agreed to by your staff, please provide the requested information within 30 days of receipt of this letter. If you have any questions, please contact me at (301) 415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
RAI cc w/encl: See next page
Mr. Christopher M. Crane President and Chief Executive Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) RE: THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1) RESPONSE TO GENERIC LETTER (GL) 2004-01, REQUIREMENTS FOR STEAM GENERATOR TUBE INSPECTION, DATED AUGUST 30, 2004 (TAC NO. MC4859)
Dear Mr. Crane:
By letter dated October 29, 2004 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML043060328), AmerGen Energy Company, LLC (the licensee),
submitted its response to GL 2004-01 for TMI-1.
The Nuclear Regulatory Commission staff has determined that it will need the additional information identified in the enclosure to this letter in order to complete its review of the subject GL. As discussed with and agreed to by your staff, please provide the requested information within 30 days of receipt of this letter. If you have any questions, please contact me at (301) 415-1402.
Sincerely,
/RA/
Timothy G. Colburn, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-289
Enclosure:
RAI cc w/encl: See next page DISTRIBUTION PUBLIC PDI-1 R/F RLaufer TColburn DLPM/DPR JTerrell MOBrien PKlein LLund OGC ACRS MYoder ABurritt, RGN-I ACCESSION NO.: ML051180042 *Input received. No substantive changes made.
OFFICE PDI-1\PM PDI-2\LA EMCB\SC PDI-1\SC NAME TColburn MOBrien LLund* RLaufer DATE 5/9/05 5/9/05 03/24/05 5/9/05 OFFICIAL RECORD COPY
REQUEST FOR ADDITIONAL INFORMATION (RAI)
RELATED TO AMERGEN ENERGY COMPANY, LLC THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1)
GENERIC LETTER (GL) 2004-01 RESPONSE DOCKET NO. 50-289 By letter dated October 29, 2004, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML043060328) AmerGen Energy Company, LLC, the licensee for TMI-1, submitted a response to GL 2004-01, Requirements For Steam Generator Tube Inspection, dated August 30, 2004. The Nuclear Regulatory Commission (NRC) staff has reviewed the licensees letter and has determined that additional information is needed in order for the NRC staff to complete its review. Responses to the following questions are requested:
- 1. The October 29, 2004, response to GL 2004-01 indicated that the TMI-1 steam generator (SG) tube inspection approach/methods are consistent with the NRC staffs position provided in the GL. In Table 1, Note 6, you state that examination results from other once-through SG plants in the lower tubesheet sludge pile region have indicated that bobbin coil detection capability may be reduced in this region. You further state that there is no evidence to date, that TMI-1 is experiencing a reduction in the bobbin coil probability of detection (POD) in this region. Please provide the basis for this statement considering that licensees for other plants with similarly designed SGs have stated that tubes in the kidney region require the use of a rotating pancake coil probe for better detection of intergranular attack (IGA) due to sludge build up in the upper portion of the lower tubesheet crevice. In addition, for each indication within the sludge pile and in other areas of the lower tubesheet (excluding tube end cracking), provide a summary that includes the indications location, the nature of the indication (IGA, stress-corrosion cracking (SCC), etc.), the indications severity (length and depth), and whether the indication was detected by bobbin coil inspection, rotating pancake coil probe inspection, or both. Discuss whether rotating pancake coil probe inspections detected indications that were not detected by the bobbin coil probe, and if so, the implications of this finding. Discuss if the bobbin coil technique used in the lower tubesheet region meets the industry standards (e.g., Appendix H of the Electric Power Research Institute Pressurized-Water Reactor Steam Generator Examination Guidelines: Revision 6, ADAMS Accession No. ML050980251). If this technique does not meet the industry standards, discuss your future plans for qualifying the inspection technique. If this technique does not meet industry standards and you have no plans to qualify the technique to an industry standard, provide the acceptance standard, specification or criteria you are using and the technical basis for this standard, specification, or criteria to ensure the adequacy of this technique.
Enclosure
- 2. If as a result of your response to the questions above, you conclude that full compliance with the TMI-1 Technical Specifications in conjunction with Criteria IX, XI, and XVI of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, requires corrective actions, please discuss your proposed corrective actions as requested by GL 2004-01, Requested Information #2. In addition, if the inspections are not being performed consistent with the NRC position on the requirements, please submit a safety assessment as requested in GL 2004-01, Requested Information #3.
Three Mile Island Nuclear Station, Unit 1 cc:
Site Vice President - Three Mile Island Nuclear Director - Licensing and Regulatory Affairs Station, Unit 1 AmerGen Energy Company, LLC AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E P. O. Box 480 Kennett Square, PA 19348 Middletown, PA 17057 Rich Janati, Chief Senior Vice President - Nuclear Services Division of Nuclear Safety AmerGen Energy Company, LLC Bureau of Radiation Protection 4300 Winfield Road Department of Environmental Protection Warrenville, IL 60555 Rachel Carson State Office Building P.O. Box 8469 Vice President - Operations, Mid-Atlantic Harrisburg, PA 17105-8469 AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Plant Manager - Three Mile Island Nuclear Kennett Square, PA 19348 Station, Unit 1 AmerGen Energy Company, LLC Vice President - Licensing and Regulatory Affairs P. O. Box 480 AmerGen Energy Company, LLC Middletown, PA 17057 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 Regional Administrator AmerGen Energy Company, LLC Region I P.O. Box 480 U.S. Nuclear Regulatory Commission Middletown, PA 17057 475 Allendale Road King of Prussia, PA 19406 Peter Eselgroth, Region I U.S. Nuclear Regulatory Commission Chairman 475 Allendale Road Board of County Commissioners King of Prussia, PA 19406 of Dauphin County Dauphin County Courthouse Michael A. Schoppman Harrisburg, PA 17120 Framatome ANP Suite 705 Chairman 1911 North Ft. Myer Drive Board of Supervisors Rosslyn, VA 22209 of Londonderry Township R.D. #1, Geyers Church Road Vice President, General Counsel and Secretary Middletown, PA 17057 AmerGen Energy Company, LLC 2301 Market Street, S23-1 Senior Resident Inspector (TMI-1) Philadelphia, PA 19101 U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057
Three Mile Island Nuclear Station, Unit 1 cc:
Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112 Correspondence Control Desk AmerGen Energy Company, LLC P.O. Box 160 Kennett Square, PA 19348 Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Associate General Counsel AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555