ML051100327
| ML051100327 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley (DPR-066, NPF-073) |
| Issue date: | 04/08/2005 |
| From: | Pearce L FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, L-05-064 | |
| Download: ML051100327 (3) | |
Text
FENOC F~rstEnergy Nule)~ar Operarin j Cop;;;y Beaver Valley Power Station P. 0. Box 4 Shippingport, PA 15077 L-05-064 April 8, 2005 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit I and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of March, 2005. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System.
No regulatory commitments are contained in this submittal.
Respectfully, L. W. Pearce Vice-President BVPS DTJ/cjg Enclosures cc:
NRC Regional Office King of Prussia, PA
OPERATING DATA REPORT DOCKET NO.
50-334 UNIT NAME Beaver Valley 1 DATE April 01, 2005 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIOD:
March 2005
- 1. Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 835.00 821.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 628,400.00
,Yr-to-Date 2,160.00 2,160.00 0.00 1,822,160.00 Cumulative 178,323.14 175,777.14 0.00 133,142,079.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments NONE.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
The Unit operated at a nominal value of 100% output for the entire month of March 2005.
Page 1 of 1
OPERATING DATA REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-412 Beaver Valley 2 April 01, 2005 David T. Jones 724-682-4962 March 2005
- 1.
Design Electrical Rating
- 2.
Maximum Dependable Capacity (MWe-Net) 836.00 831.00 3.
4.
5.
6.
Number of Hours the Reactor was Critical Number of Hours Generator On-line Reserve Shutdown Hours Net Electrical Energy Generated (MWHrs)
This Month 744.00 744.00 0.00 570,815.00 DYrrtoDate 2,160.00 2,160.00 0.00 1,722,789.00 Cumulative 128,552.48 127,808.38 0.00 100,857,019.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.
Date S: Scheduled (Hours)
Reason 1 Down 2 Comments NONE.
1 2
Reason:
A Equipment Failure (Explain)
B Maintenance or Test C
Refueling D
Regulatory Restriction E
Operator Training & License Examination F
Administration G
Operational Error (Explain)
H Other (Explain)
Method:
1 Manual 2
Manual Trip/Scram 3
Automatic Trip/Scram 4
Continuation 5
Other (Explain)
SUMMARY
The Unit began the report period operating at approximately 42% output while repairs to the "B" Heater Drain Pump motor continued from February 2005. Upon returning the "B" Heater Drain Pump to service, the Unit began to increase power at 1910 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.26755e-4 months <br /> on 3/4/05. The increase in power was halted at approximately 73% output at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on 3/5/05 in order to permit cleaning of the "B" and "C" waterboxes in the Main Unit Condenser to complete. Upon completion of cleaning the "B" and "C" waterboxes in the Main Unit Condenser, the Unit commenced to return to full power at 0044 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> on 3/6/05. A nominal value of 100% output was achieved at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> on 3/6/05. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
Page 1 of 1