ML051030276
ML051030276 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 03/25/2005 |
From: | Passehl D NRC/RGN-III/DRP/RPB3 |
To: | Crane C Exelon Generation Co |
References | |
Download: ML051030276 (3) | |
Similar Documents at Braidwood | |
---|---|
Category:Letter
MONTHYEARIR 05000456/20230042024-02-0202 February 2024
[Table view]Integrated Inspection Report 05000456/2023004 and 05000457/2023004 ML24025C7242024-01-29029 January 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000456/2024002; 05000457/2024002 IR 05000457/20230112024-01-25025 January 2024 2B Auxiliary Feedwater Pump Diesel Fuel Oil Dilution Report 05000457/2023011 and Preliminary Greater than Green Finding and Apparent Violation ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 RS-24-004, Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators2024-01-11011 January 2024 Proposed Alternative to the Distribution Requirements of ASME Code Table IWC-2411-1 for the Steam Generators ML23348A2162023-12-15015 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0030 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000456/20200232023-12-15015 December 2023 Baseline Security Inspection Document; 05000456/2023/402; 05000457/2023/402 ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23339A0452023-12-0505 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000546/2024010 ML23313A1552023-12-0101 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report ML23331A8922023-11-22022 November 2023 Supplement - Braidwood Security Rule Exemption Request ISFSI Docket No. Reference 05000457/LER-2023-001, Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case2023-11-17017 November 2023 Submittal of LER 2023-001-00 for Braidwood Station, Unit 2, Train B Auxiliary Feedwater Pump Was Inoperable Due to Degraded Oil in the Crank Case ML23321A0442023-11-17017 November 2023 Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline RS-23-118, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000456/20234012023-10-18018 October 2023 Security Baseline Inspection Report 05000456/2023401 and 05000457/2023401 IR 05000456/20230102023-10-18018 October 2023 Functional Engineering Inspection Commercial Grade Dedication Report 05000456/2023010 and 05000457/2023010 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) IR 05000456/20230052023-08-30030 August 2023 Updated Inspection Plan for Braidwood Station Report 05000456/2023005 and 05000457/2023005 ML23234A2462023-08-25025 August 2023 Confirmation of Initial License Examination IR 05000456/20230022023-08-0303 August 2023 Integrated Inspection Report 05000456/2023002 and 05000457/2023002 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23191A8442023-07-10010 July 2023 05000456; 05000457 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23110A1152023-06-12012 June 2023 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2023-LLA-0042) (Letter) RS-23-074, Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-06-0909 June 2023 Supplement to Application for License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23132A0472023-05-12012 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ML23130A0072023-05-10010 May 2023 Submittal of Core Operating Limits Report Cycle 24, Rev. 16 IR 05000456/20230012023-05-0808 May 2023 Integrated Inspection Report 05000456/2023001 and 05000457/2023001 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23118A0202023-04-28028 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-056, Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 102023-04-20020 April 2023 Response to Request for Additional Information to Braidwood Station, Unit 1, and Byron Station, Unit 1, for Steam Generator License Renewal Response to Commitment 10 RS-23-055, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2023-04-10010 April 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML23095A1292023-04-0505 April 2023 Steam Generator Tube Inspection Report for Refueling Outage 23 ML23094A1352023-04-0404 April 2023 Request for Information for Nrc Commercial Grade Dedication Inspection Inspection Report 05000456/2023010 05000457/2023010 RS-23-052, License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink2023-03-24024 March 2023 License Amendment to Braidwood Station, Units 1 and 2, Technical Specification 3.7.9, Ultimate Heat Sink RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations 2024-02-02 Category:Meeting Notice MONTHYEARPMNS20231393, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.22024-01-0808 January 2024
[Table view]Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.2 PMNS20231313, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.52023-11-24024 November 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.5 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230972, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink2023-10-0202 October 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink PMNS20230952, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections2023-09-13013 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20230744, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-06-22022 June 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections ML23138A1892023-05-18018 May 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood and Byron Nuclear Plants for Performance for 2022 Calendar Year PMNS20230225, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools2023-03-0606 March 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20230063, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-01-19019 January 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20220954, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel2022-09-20020 September 2022 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel PMNS20220805, Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds2022-08-22022 August 2022 Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds ML22136A1312022-05-17017 May 2022 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2021 End of Cycle Plant Performance of Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 ML22136A1212022-05-17017 May 2022 Notice of Significant Public Meeting to Discuss NRC End of Cycle Performance Assessment of Braidwood and Byron Power Plants for Performance for 2021 Calendar Year PMNS20220359, Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-04-0707 April 2022 Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20220331, Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-03-31031 March 2022 Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20211388, Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License2021-11-16016 November 2021 Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards ML21145A1682021-05-25025 May 2021 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood Station and Byron Station for Performance for 2020 Calendar Year PMNS20210423, Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications2021-05-11011 May 2021 Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20183A1312020-06-30030 June 2020 7/14/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Braidwood Station and Byron Station Performance for the 2019 Calendar Year ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19158A3742019-06-0606 June 2019 7/2/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Braidwood Station Performance for the 2018 Calendar Year ML18088A0522018-03-29029 March 2018 5/10/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2017 Calendar Year ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17258A0222017-09-14014 September 2017 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Exelon Sites (CMS) ML17069A0702017-03-0707 March 2017 4/28/17 Notice of Significant Public Meeting with Braidwood Station to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2016 Calendar Year ML16209A3062016-08-0101 August 2016 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC ML16172A2982016-06-20020 June 2016 7/14/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2015 Calendar Year ML16074A3232016-03-21021 March 2016 Forthcoming Meeting with Exelon Nuclear ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15182A4292015-07-0101 July 2015 Bra BYR Cli DRE Lasa Qua Operator License Workshop Invitation ML15168A4912015-06-16016 June 2015 Notice of Meeting on with Exelon Nuclear - Braidwood and Byron Stations (Msh) ML15092A8822015-03-30030 March 2015 Meeting Notice with Public to Discuss 2014 EOC Braidwood and Dresden Combined ML14169A4542014-06-13013 June 2014 Ltr 6/13/14 Bra BYR Cli DRE LAS Qua Operator License Workshop ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14162A0962014-06-10010 June 2014 Meeting Notice with Public to Discuss NRC End-of-Cycle Assessment of Braidwood Station Unit 1 and 2 Performance for the 2013 Calendar Year 2024-01-08 |
Text
March 25, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Dear Mr. Crane:
This letter confirms the discussion between members of our staffs to have a meeting at 4:30 p.m. (CDT) on Wednesday May 11, 2005, at the Fossil Ridge Library, located at 386 W. Kennedy Road, Braidwood, Illinois 60408.
The purpose of the meeting is to discuss Braidwood Station's performance as described in our most recent End-of-Cycle letter, dated March 2, 2005. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.
We appreciate your cooperation in this matter. If you have any questions regarding this meeting, please contact me at 630-829-9872.
Sincerely,
/RA/
David Passehl, Acting Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution
March 25, 2005 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Dear Mr. Crane:
This letter confirms the discussion between members of our staffs to have a meeting at 4:30 p.m. (CDT) on Wednesday May 11, 2005, at the Fossil Ridge Library, located at 386 W. Kennedy Road, Braidwood, Illinois 60408.
The purpose of the meeting is to discuss Braidwood Station's performance as described in our most recent End-of-Cycle letter, dated March 2, 2005. The public is invited to observe this meeting and will have an opportunity to speak with the NRC after the business portion of the meeting, but before the meeting is adjourned.
We appreciate your cooperation in this matter. If you have any questions regarding this meeting, please contact me at 630-829-9872.
Sincerely,
/RA/
David Passehl, Acting Chief Branch 3 Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77 See Attached Distribution DOCUMENT NAME: G:\Branch TSS\EOC Mtg. Notices 2005\Bra ltr.wpd To receive a copy of this document, indicate in the box "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII NAME Passehl:co DATE 03/25/05 OFFICIAL RECORD COPY
C. Crane cc: Site Vice President - Braidwood Station Plant Manager - Braidwood Station Regulatory Assurance Manager - Braidwood Station Chief Operating Officer Senior Vice President - Nuclear Services Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing Manager Licensing - Braidwood and Byron Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer Chairman, Illinois Commerce Commission
C. Crane ADAMS Distribution:
AJM GFD RidsNrrDipmIipb GEG KGO SPR CAA1 DRPIII DRSIII PLB1 JRK1