ML050950090
| ML050950090 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 12/09/2004 |
| From: | Roy D Florida Power & Light Energy Seabrook |
| To: | Conte R NRC/RGN-I/DRS/OSB |
| Conte R | |
| References | |
| 50-443/05-301 50-443/05-301 | |
| Download: ML050950090 (81) | |
Text
FPL Seabrook Station JOB PERFORMANCE MEASURE L0105J TECHNICAL SPECIFICATIONS AND ALLOWED OUTAGE TIME (AOT)
Student Name:
Badge #:
Evaluator Name:
Badge #:
Student Signature:
Date:
(optional)
_I__-
Eva I ua tor Signature:
Date:
Training Specialist Signature:
Date:
SAT UNSAT This JPM was administered for qualification:
NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the authorization of the Training Manager.
PREPARED BY:
/
DATE:
REVIEWED BY:
DATE:
APPROVED BY:
DATE: 12 b/dl-
1.o 2.0 3.0 4.0 5.0 6.0 JOB PERFORMANCE WORKSHEET Task Number and
Description:
Position:
SRO 1 190401 203 Clarify TSs and application of action statement requirements.
Conditions:
A. The plant has just completed a heatup to 557°F from COLD SHUTDOWN.
B. At 0700 this morning, the turbine-driven EFW (TDEFW) pump was declared INOPERABLE due to improperly installed mechanical seals in the pump.
C. The plant is required to be in MODE 4 at 1300 (1:OO PM) three days from now if the TDEFW pump is not repaired.
D. Based on an OE4.5, OPERABILITY DETERMINATION, the SM declared DG B INOPERABLE at 0800.
Standards:
Determine whether the INOPERABLE DG has further restricted MODE 3 operation.
Student Materials:
Copy of the Tear-Off Sheet OD1.30, ALLOWED OUTAGE TIME WORKSHEET, Rev. 05 Tech n i ca I Specifications Limitations on performance:
Perform all steps. Verbalize all actions to the evaluator References :
Procedures ODI-30 ALLOWED OUTAGE TIME WORKSHEET Technical Specifications 3.7.1.2, Auxiliary Feedwater System 3.8.1.1, AC Sources, Operating Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LO1 05J Page 2 of 10
~
JOB PERFORMANCE WORKSHEET SY s KA Description Value SRO GEN 2.1.12 Ability to apply Technical Specifications for a system.
4.0 GEN 2.1.22 Ability to determine Mode of Operation 3.3 Manuals ODI 30, Allowed Outage Time Worksheet 7.0 8.0 9.0 10.0 Setting:
Classroom, simulator, or plant Safety Considerations:
None Approximate Completion Time:
30 minutes Directions to the Student(s):
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are the Work Control Supervisor.
B. The following information is provided to you:
- 1. The plant has just completed a heatup to 557°F from COLD SHUTDOWN.
- 2. At 0700 this morning, the turbine-driven EFW (TDEFW) pump was declared INOPERABLE due to improperly installed mechanical seals in the pump.
- 3. The plant is required to be in MODE 4 at 1300 (1:UU PM) three days from now if the TDEFW pump is not repaired. Technical Specification ACTION 3.7.1.2.b has been entered.
- 4. Based on an OE4.5, OPERABILITY DETERMINATION, the SM declared DG B INOPERABLE at 0800.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0105J Page 3 of 10
JOB PERFORMANCE WORKSHEET C The performance must meet the following standard:
- 4. Determine whether the INOPERABILITY of DG B reduces the time allowed to remain in MODE 3 and if so;
- 2. Determine the time required to be in MODE 4 and I or MODE 5, as applicable.
D. Perform the task per Technical Specification ACTION Statements and OD1 30, AOT W 0 R KSHE ET( s).
E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. During the course of the walk-through examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the J P M is complete I. We will begin after the Initiating Cue is read J. I will act as the SM and provide the cues and communications for this JPM. Do you have any questions?
11.O initiating Cue:
S M to WCS, Work Control Supervisor (or students name), DETERMINE which TS ACTION Statement(s) apply and, using 001-30, DETERMINE the allowed outage times for each Technical Specification and MODE restrictions.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0105J Page 4 of 10
PERFORMANCE CHECKLIST D=Discuss E LEMENT/STEP STANDARD EVAL U AT I ON I N IT I AL S/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes cri t i ca I
- 1.
P Start time Initiating cue read.
CUE:
If student requests time T.S. entered, TS 3.8.1.I
.bravo and delta were entered at 0800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br />. It is now 0820 hours0.00949 days <br />0.228 hours <br />0.00136 weeks <br />3.1201e-4 months <br />.
NOTE: The date for the AOT worksheet is todays date.
- 2.
P Refers to OD1 30 to calculate Calculates AOT AOT:
Determine the appropriate AOT worksheet using Figure 1, AOT Flowchart, as a guide for LCO 3.8.1.1.b:
Determines OD1.30A is form to be used from FIGURE 1 :
0 Is the LCO in question 0
Determines NO.
shown on list A?
~. -
0 Is the LCO in question Determines NO.
3.0.3?
0 Does TS Ultimately require 0
Determines YES.
Shutdown to COLD SHUTDOWN?
- 3 P
Enter information as required
- b. Enters LCO specific information on form ODl.30A for 3.8.1.I.b:
on Form OD1.30A, as appropriate.
Enters LCO info 3 Hrs AOT provided before MODE a (a)=72 reduction to MODE 3 required 3 Hrs provided to (b)=O change MODES to MODE 3 dote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LO1 05J Page 5 of 10
PERFORMANCE CHECKLIST O=Oiscuss ELEMENTISTEP STANDARD EVALU AT1 ON IN I TI ALS/DATE S=Simulate critical steD standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 4.
P 5
P
- 6.
- 7.
P
- 8 3 Hrs additional AOT Circles MODE 5 provided in MODE 3 before reduction to required MODE 4 or 5
- 3 (c)=O Hrs provided to
=> Circles MODE 5 change MODES from MODE 3 to MODE 4 or 5
- 3 (d)=30
- 1) Time LCO action
- 1) Enters 0800 and statement entered today's date on line 1 (e).
~
~
IF Entered From MODE...
(Circle Applicable)
Circles MODE 3 Based on entry from MODE 3, proceed to Line 7.
Proceeds to Line 7 Determine time and date that Determines time and plant must be in MODE 5.
date to be in MODE 5 as 102 hours0.00118 days <br />0.0283 hours <br />1.686508e-4 weeks <br />3.8811e-5 months <br /> from entry into the TS.
Determine the appropriate AOT worksheet using Figure 1, AOT Flowchart, as a guide for LCO 3.8.1.1.d:
Determines OD1.30A is form to be used from FIGURE 1:
-~
Is the LCO in question 0
Determines NO.
shown on list A?
Is the LCO in question 0
Determines NO.
3.0.3?.
Does TS Ultimately require 0
Determines YES.
Shutdown to COLD SHUTDOWN?
dote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LO1 05J Page 6 of 10
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP STANDARD EVALUATION I NITIALS/DA JE
=;=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 9
- lo.
11
- 12.
- I
- 3.
P P
P P
Enter information as required
- b. Enters LCO specific on Form OD1.30A, as information on form appropriate.
OD1.30A for 3.8.1.1.d:
Enters LCO info 2 Hrs AOT provided (a)= 2 before MODE reduction to MODE 3 required 3 Hrs provided to
- = (b)=O change MODEs to MODE 3 3 Hrs additional AOT 3 Circles MODE 5 provided in MODE 3 before reduction to required MODE 4 or 5
- 1 (c)=O z
Hrs provided to
=? Circles MODE 5 change MODEs from MODE 3 to MODE 4 or 5
- 3 (d)=30
- 1) Time LCO action
- 1) Enters 0800 and statement entered today's date on line 1 (e).
IF Entered From MODE...
(Circle Applicable)
Circles MODE 3 Based on entry from MODE 3, proceed to Line 7.
Proceeds to Line 7 Determine time and date that Determines time and plant must be in MODE 5.
date to be in MODE 5 as 30 - 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> from entry into the TS.
dote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LO1 05J Page 7 of 10
PERFORMANCE CHECKLIST D=Discuss ELEMENTGTEP STANDARD EVALUATION INITIALS/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 14.
P Report that that plant must be Reports that that plant in MODE 5 within 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> of entry into 3.8.1.1.d must be in MODE 5 within 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> of entry into 3.8.1.1.d CUE:
The JPM is complete.
- 15.
Stop time Evaluator calculates the time to complete the task.
Start - Stop time is 5 30 minutes.
(dote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LO1 05J Page 8 of 10
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an elementlstep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0105J Page 9 of 10
TEAR-OFF SHEET FOR JPM L0105J Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional,a-multil;,d JP Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are the Work Control Supervisor. You are going to determine whether the INOPERABLE DG has further restricted MODE 3 operation.
B. The following information is provided to you:
- 1. The plant has just completed a heatup to 557°F from COLD SHUTDOWN.
- 2. At 0700 this morning, the turbine-driven EFW (TDEFW) pump was declared INOPERABLE due to improperly installed mechanical seals in the pump.
- 3. The plant is required to be in MODE 4 at 1300 (1:OO PM) three days from now if the TDEFW pump is not repaired. Technical Specification ACTION 3.7.1.2.b has been entered.
- 4. Based on an OE4.5, OPERABILITY DETERMINATION, the SM declared DG B INOPERABLE at 0800.
C. The evaluator will act as the SM and provide the cues and communications for this JPM. Do you have any questions?
Initiating Cue:
SM to WCS, Work Control Supervisor (or students name), DETERMINE which TS ACTION Statement(s) apply and, using ODI-30, DETERMINE the allowed outage times for each Technical Specification and MODE restrictions.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0105J Page 10 of 10
FPL Seabrook Station JOB PERFORMANCE MEASURE LOIT05 EVALUATE SHUTDOWN MARGIN RESULTS Student Name:
Badge #:
Evaluator Name:
Badge #:
. ~ _ _ ~ _
Student Signature:
~. _ _ _ _ _ _ _
Date:
(optional)
Evaluator Signature:
Date: -
Training Coordinator Signature:
-~ _~___.___
Date:
(optional)
SAT UNSAT This JPM was administered for qualification:
YES NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the authorization of the Training Manager.
PREPARED BY:
DATE: dpddf I N S T R ~ T O R REVIEWED BY:
DATE:
APPROVED BY:
DATE:
/?/fiY
JOB PERFORMANCE WORKSHEET I
.O Task Number and
Description:
Position:
RO 11 901 01 802 001 01 00201 Apply Technical Specification Actions to existing plant conditions.
Perform Shutdown Margin Calculations.
2.0 Conditions
A. The plant is in Mode 1, EOL at 85% RTP, 300 ppm boron and stable.
- 6. While withdrawing Control Bank D, it was determined that TWO control rods in this bank are misaligned.
C. The actions of OS1210.06, Misaligned Control Rod are being performed.
D. It has further been determined that these two control rods will NOT move and are untrippable.
E. A Shutdown Margin Calculation has been performed based on these plant conditions as required by TS 3.1.3.1.
3.0 Standards
Evaluate shutdown margin results and determine impact on plant operations.
4.0 Student Materials:
Copy of the Tear-Off Sheet.
RX1707, Shutdown Margin Surveillance, Rev. 7 Chg. 04.
Primary Technical Data Book curves RE-8 Rev. 10-10-03, RE-18 Rev. 01-10-01, and RE-19 Rev. 10-1 3-03.
Seabrook Technical Specifications OS 121 0.06, Misaligned Control Rod, Rev 9.
OS1210.02, Failure of Control Rod or Bank to Move, Rev 9.
Core Operating Limits Report 5.0 Limitations on performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT05 Page 2 of 9
JOB PERFORMANCE WORKSHEET SYS APE 005 GEN 6.0
References:
Description Value KA AKI.05 Calculation of minimum shutdown margin.
3.314.1 2.1.7 Ability to evaluate plant performance and make 3,714.4 ROISRO operational judgments based on operating characteristics, reactor behavior, and instrument 0
RX1707, Shutdown Margin Surveillance.
e GEN I
interpretation.
I 2.1.25 Ability to obtain and interpret station reference 1 2.813.1 materials such as graphs, monographs, and tables which contain performance data.
7.0 8.0 9.0 10.0 Setting :
Classroom
- 1. Plant conditions, shutdown margin calculation, and applicable plant references are provided.
Safety Considerations:
None Approximate Completion Time:
20 minutes Directions to the Student@):
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT05 Page 3 of 9
JOB PERFORMANCE WORKSHEET A. You are going to evaluate Shutdown Margin results and determine impact on plant operations.
B. The following information is provided to you:
- 2. While withdrawing Control Bank D, it was determined that TWO control rods in this bank are misaligned.
- 3. The actions of OS1210.06, Misaligned Control Rod are being performed.
- 4. It has further been determined that these two control rods will NOT move and are untrippable.
- 5. A Shutdown Margin Calculation has been performed based on these plant conditions as required by TS 3.1.3.1.
C. You may request a Peer Check of your actions while performing the task.
D. Perform the task using RX1707, Shutdown Margin Surveillance.
E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. (Statement optional for multiple JPMs)
During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete.
I. We will begin after the Initiating Cue is read J. I will act as the US and provide the cues and communications for this JPM. Do you have any questions?
11.O Initiating Cue:
SM to US to student (or students name), Based on given plant conditions, EVALUATE the Shutdown Margin Calculation for impact on given plant conditions and report findings to me upon completion.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT05 Page 4 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP STANDARD EVALUATION INlTlALSlDATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical NOTE: RE procedure RX1707, Technical Specifications, Abnormal Operating Procedures, Core Operating Limits Report & RE-8, RE-18, and RE-19 should be available upon the students request.
NOTE: The order of the following steps or the fact that all references are reviewed is not critical.
- 1.
P Start time:
Initiating cue read.
CUE:
peer check your actions. Please continue with the task.
If the student requests a Peer Check at any time during the JPM, respond: No one is available to CUE:
- 2.
- 3.
- 5.
- 6.
- 7.
If the student asks about rod heights, Rods are above the Rod Insertion Limit.
P P
P P
P P
Reviews the SDM Calculation provided and associated plant conditions.
Reviews RX1707, Shutdown Margin Su Neil lance procedure May choose to review data that was used to determine SDM.
May choose to reference abnormal operating procedure associated with stated plant conditions Reviews COLR (RE-21)
Reviews the SDM Calculation provided and associated plant conditions.
Reviews RXl707, Shutdown Margin Surveillance procedure.
_ _ ~
Reviews data associated with provided SDM calculation. (RE-8, 18, 19)
__-~
References OS 121 0.06, M is a I i g n ed Co n t ro I Rod and/or OS1 21 0.02, Failure of Control Rod or Bank to Move.
References COLR to determine required SDM for Mode 1.
~
Recognizes that required SDM is
- Recognizes 1.019 is less inadequate for given plant conditions.
than the required 1.3 required SDM for given plant conditions.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT05 Page 5 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP STANDARD EVAL U AT IO N I N IT I ALSIDATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 8.
P Determines TS 3.1.1.1 actions 0
Reports to the SM that statement applies due to inadequate SDM.
- Immediately initiate boration equivalent to 30 gpm at a boron concentration greater than or equal to 7000 ppm until required SDM is restored.
statement applies.
TS 3.1.1.1 action CUE:
The JPM is complete.
- 9.
Stop time Time to complete the task 5 20 minutes.
Evaluator calculates the time to complete the task.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT05 Page 6 of 9
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an elementktep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT05 Page 7 of 9
~~
-~
TEAR-OFF SHEET FOR JPM L0043J Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are going to calculate Shutdown Margin in Mode 1 B. The following information is provided to you:
- 2. While withdrawing Control Bank D, it was determined that TWO control rods in this bank are misaligned.
- 3. The actions of OS1210.06, Misaligned Control Rod are being performed.
- 4. It has further been determined that these two control rods will NOT move and are untrippable.
- 5. A Shutdown Margin Calculation has been performed based on these plant conditions as required by TS 3.1.3.1.
C. You may request a Peer Check of your actions while performing the task.
D. Perform the task as per RX1707, Shutdown Margin Surveillance.
\\
E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. (Statement optional for multiple JPMs)
During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete.
I. We will begin after the Initiating Cue is read.
J. The evaluator will act as the US and provide the cues and communications for this JPM. Do you have any questions?
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT05 Page 8 of 9
TEAR-OFF SHEET FOR JPM L0043J Initiating Cue:
US to student (or students name), Based on given plant conditions, EVALUATE the Shutdown Margin Calculation for impact on given plant conditions and report findings to me upon completion.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT05 Page 9 of 9
FPL Seabrook Station JOB PERFORMANCE MEASURE LOIT06 OFF-SITE NOTIFICATIONS DURING A FORCED OUTAGE Student Name:
Badge #:
Evaluator Name:
Badge #:
Student Sig na t u re:
Date:
(optional)
Date:
Evaluator Signature:
Training Coordinator Signature:
Date:
SAT UNSAT This JPM was administered for qualification: NO This m aterial i s d eveloped for N orth Atlantic training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation. This material may not be reproduced without the authorization of the Training Manager.
PREPARED REVIEWED APPROVED DATE:
BY:
BY:
DATE:
1.o 2.0 3.0 4.0 5.0 6.0 SYS GEN JOB PERFORMANCE WORKSHEET KA Description Value SRO 2.1.6 Ability to supervise and assume a management role 4.3 Task Number and
Description:
GEN Position:
wcs during plant transients and upset conditions.
2.1.I4 Knowledge of System Status criteria which require 3.3 I1 90403903 DETERMINE REQUIRED NOTlFlCATlONS/TlME PERlODlClTlES OF ON-SITE AND OFF-SITE PERSONNEL FOR OFF NORMAL EVENTS GEN Conditions:
notification of plant personnel.
maintenance activities during shutdown operations.
2.2.18 Knowledge of the process for managing 3.6 A. The plant is performing a TS 3.0.3 shutdown due to INOPERABILITY of both centrifugal charging pumps (administratively INOPERABLE, both are available).
The shutdown commenced at 0200 this morning. It is Saturday morning at 0210 Standards:
Identify the required notifications and time periodicities in accordance with the Regulatory Compliance Manual (NARC) and Conduct of Operations (NAP-402)
Student Materials:
Copy of the Tear-Off Sheet Regulatory Compliance Manual (NARC)
Conduct of Operations (NAP-402)
Limit at i o n s on perform an ce :
Perform all steps. Verbalize all actions to the evaluator,
References:
Procedures Regulatory Compliance Manual (NARC)
Conduct of Operations (NAP-402)
Emergency Response Manual (SSER)
OS1000.06. POWER DECREASE Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT06 Page 2 of 9
JOB PERFORMANCE WORKSHEET
7.0 Setting
Plant / Classroom I Simulator 8.0 Safety Considerations:
IF performed in the plant, ensure both student and evaluator have proper PPE for entry into the plant.
9.0 Approximate Completion Time:
20 minutes 10.0 Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task A. You are the Work Control Supervisor.
- 6. The following information is provided to you:
The plant is performing a TS 3.0.3 shutdown due to INOPERABILITY of both centrifugal charging pumps (administratively INOPERABLE, both are available).
The shutdown commenced at 0200 this morning. It is Saturday morning at 021 0.
C. The performance must meet the following standard:
Identify the notifications required in accordance with the applicable program manuals.
D. Perform the task utilizing the applicable program manuals.
E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LO1106 Page 3 of 9
JOB PERFORMANCE WORKSHEET F. During the course of the walk-through examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facility's procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a.failure of the task.
H. I will inform you when the JPM is complete I. We will begin after the Initiating Cue is read.
J. The evaluator will act as the SM and provides cues and communi JPM. Do you have any questions?
I 1.O initiating Cue:
ati ns for thi SM to WCS, "I want to remain in an oversight role for the plant shutdown. Using the immediate Notifications Tab in Section 3 of the Regulatory Compliance Manual (NARC) and Conduct of Operation (NAP-402, Attachment M), identify required notifications (and the tirne limits as applicable) as a result of the forced outage. The US or I will attend to the notifications identified in the MPEs."
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT06 Page 4 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP
=Perform
- denotes a S=Simulate critical step STANDARD EVALUATION INITIALS/DATE
- denotes critical standard SAT UNSAT 1.
P Start time Initiating cue read.
NOTE: The student may refer to ER-1.lA to confirm there is no E-Plan implication. Also these procedures can referenced in any order and are outlined separately below.
NARC ACTIONS Outlined Below
- 2.
P Refer to the IMMEDIATE Refers to the I MMED I ATE NOTIFICATION tab and reporting NOTIFICATION tab and reporting requirements table in the NARC to identify the following:
requirements table in the NARC:
NOTE: The student might also state that an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> notification to the NRC Operations Center is required based on an unanalyzed condition or system degradation which is less limiting than the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> notification and also acceptable.
NRC Operations Center -
Identifies notification to within four hours NRC Operations Center is required within 4 Hrs (Initiation of a TS required Shutdown)
CUE: If student wants to reference the OPMM, inform him it is not necessary.
Identifies OPS./ ASST.
ASAP/ 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OPS. Mgr - ASAP (any transient evenumajor equipment failure or due to the additional notifications section within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />)
.ole to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT06 Page 5 of 9
PERFORMANCE CHECKLIST D = D is cuss E LE ME N T/STE P STANDARD EVALUATION IN ITIALS/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical NRC Resident Inspector -
ASAP/I hour Regulatory Compliance -
ASAP FPLE Communications -
ASAP/1 hour Identifies NRC Resident Inspector -
ASAP (when any 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> notification or less is reported to the NRC or due to the additional within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) notification section
~~
Identifies Regulatory Compliance - ASAP (when any 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> notification or less is reported to the NRC)
Identifies FPLE Communications -
ASAP (any off-normal condition or due to the additional notifications section within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) d e to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT06 Page 6 of 9
PERFORMANCE CHECKLIST D = Discuss E LE M E NT/ST E P STANDARD EVALUATION IN IT I AL S/D ATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a "denotes critical NAP-402 Actions Outlined Below
- 3.
P Refers to NAP-402, Refers to NAP-402, Attachment M and identifies the following no ti fica t ions Attachment M and identifies the following notifications in any order:
~~
NOTE: It is also acceptable if the student identifies that the notifications based on any event or operating condition that occurs that is not enveloped in the plant design basis which overlaps the other requirements Identifies a Shutdown LCO action statement entry.
Unplanned entry into a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or less shutdown action statement Unplanned shutdown or load reduction of greater than 5%.
Based on this critieria notifies:
Site VP 0
Plant Manager 0
Ops Manager 0
Nuclear Duty Officer 0
Duty Maint. Super.
0 Work Week Manag.
0 Senior Resident In addition to the notifications above:
0 Duty Engineering 0
Work Management
~
~
Manager Director CUE:
The JPM is complete.
Stop time Evaluator calculates the time to complete the task.
Start - Stop time is 5 20 minutes.
Jte to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT06 Page 7 of 9
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an element/step or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT06 Page 8 of 9
~
_ _ ~
~~
TEAR-OFF SHEET FOR JPM LOIT06 Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are the Work Control Supervisor.
- 6. The following information is provided to you:
The plant is performing a TS 3.0.3 shutdown due to INOPERABILITY of both centrifugal charging pumps (administratively INOPERABLE, both are available).
The shutdown commenced at 0200 this morning. It is Saturday morning at 021 0.
C. The evaluator will act as the SM and provides cues and communications for this JPM. Do you have any questions?
Initiating Cue:
S M to WCS, I want to remain in an oversight role for the plant shutdown. Using the Immediate Notifications Tab in Section 3 of the Regulatory Compliance Manual (NARC) and Conduct of Operation (NAP-402, Attachment M), identify required notifications (and the time limits as applicable) as a result of the forced outage. The US or I will attend to the notifications identified in the MPEs.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT06 Page 9 of 9
FPL Seabrook Station JOB PERFORMANCE MEASURE LOIT07 REVIEW AND AUTHORIZE A LIQUID EFFLUENT WASTE SAMPLE REQUEST Student Name:
Badge #:
Evaluator Name:
Badge #:
Student Signature:
Date:
(optional)
Training Coordinator Signature:
Date:
(optional)
SAT UNSAT This JPM was administered for qualification:
NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the %thorization of the Training Manager.
PREPARED BY:
DATE:
1 J d 4 $4 REVIEWED BY:
APPROVED BY:
DATE:
DATE:
1.o 2.0 3.0 4.0 5.0 6.0 KA JOB PERFORMANCE WORKSHEET Description Value RO/SRO Task Number and
Description:
Position:
us 0690301 502 Authorize release of liquid waste.
Conditions:
A. The plant is in MODE 1 with two Service Water and two Circulating Water pumps running with no expected change in configuration.
B. WL-TK-63A 'A' WTT has been filled to 18,000 gals.
C. The 'A' WTT has to be sampled to prepare a LEW permit for a release to the Transit ion Structure.
D. The PSO has completed Section I of CP 4.1A, Liquid Effluent Waste Sample Request.
Standards:
Perform the verification of the completed form.
Time for completion 15 minutes.
Student Materials:
Copy of the Tear-Off Sheet Copy of ON1 01 8.07, WASTE TEST TANK RECIRCULATION, Rev.04,CHG 06 Copy of CP 4.1, Effluent Surveillance Program, Revl7, CHG04 Limitations on perfor man ce :
Perform all steps. Verbalize all actions to the evaluator.
References:
Procedures
- SSCP, ON1 01 8.07, CP 4.1, Effluent Surveillance Program.
WASTE TEST TANK RECIRCULATION 2.3.10 Sys-Mode E Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.
2.9 13.3 Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 2 of 8
7.O 8.0 9.0 10.0 JOB PERFORMANCE WORKSHEET Setting :
In-plant MCR I Simulator / Classroom Safety Considerations:
PPE, as appropriate for setting Approximate Completion Time:
15 minutes Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task A. You are going to perform the verification of a completed Liquid Effluent Waste Sample Request.
B. The following information is provided to you:
- 1. The plant is in MODE 1 with two Service Water and two Circulating Water pumps running $with no expected change in configuration.
- 2. WL-TK-63A 'A' WTT has been filled to 18,000 gals.
- 3. The 'A' WTT has to be sampled to prepare a LEW permit for a release to the Transition Structure.
C. The performance must meet the following standard:
- 1. Perform the verification of the completed form
- 2. Time for completion 15 minutes.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 3 of 8
JOB PERFORMANCE WORKSHEET D. Perform the task utilizing OS1018.07, WASTE TEST TANK RECIRCULATION and CP 4.1 Effluent Surveillance Program.
E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete I. We will begin after the Initiating Cue is read.
J. The evaluator will act as the PSO and provides cues and communications for this JPM. Do you have any questions?
11.O Initiating Cue:
PSO to US, Unit Supervisor (or students name) I have completed Section One of Form CP 4.1A. Please perform the verification, using CP-4.1, ON1018.07, and the information provided.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 4 of 8
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP STANDARD EVALUATION INITIALS/DATE
=;=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 1.
NOTE:
NOTE:
- 2.
UE:
NOTE:
CUE:
P Start time Initiating cue read. LEWSR given to the candidate.
~~
IF the setting is the Control Room or the Simulator, give the candidate a working copy of the procedures after he has located the required procedures, IF the setting is else where, give the candidate a working copy of the procedures after he has identified the procedures required.
CP-4.1, Effluent Surveillance Program and ON1 01 8.07, Waste Test Tank Recirculation procedures will be provided to the student.
P Section I of the LEWSR is completed by Operations and provides the following information:
(1) Name of tank, sump, or SG 1. VERIFIES WTT A is
____ _ _ ~
~
Demineralizer Vessel to be entered.
sampled.
If the candidate wants to verify the amount of liquid in the WTT using the MPCS, tell him that the MPCS point C6053 indicates 18,000 gallons.
(2) total tank or sump volume
- 2.
Notes 18,000 gallons is consistent with initial indications, if checked.
to be discharged or transferred.
conditions and
_ _ _ _ _ ~
The recirculation rate for WTT A is actually 150 gpm. The Waste Holdup Sump (WHUS) is 400 gpm.
The student must correct this mistake to ensure adequate tank recirculation prior to sampling.
IF the PSO is challenged on the recirculation rate, respond you must have been thinking about the WHUS recirc rate.
(3) recirculation starting date,
- 3 VERIFIES start date time, and rate.
and time entered.
CORRECTS the recirc to be 150 gpm and minimum recirc time to 240 minutes.
Jte to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 5 of 8
PERFORMANCE CHECKLIST D= Discuss EL E M E NT/STE P STANDARD EVALUATION INITIALS/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical (4) sample date and time.
- 4 CORRECTS sample time to reflect longer recirc time (1 130)
(5) the disposition of the tank.
- 5. VERIFIES discharqe as disposition.
- 6. VERIFIES projected pump combination for the disc ha rg e.
com bi na tion consistent with initial conditions.
NOTE: Operator may request specific time based on manpower and scheduling.
CUE: If requested, the projected release time will be eight hours from the sample time.
(7) the projected release start
- 7.
CORRECTS projected date and time (normally 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the sample time.
start time to be 1930.
(8) date, time of request, and
- 8. VERIFIES time, date
~
initials of originator.
and initials are entered.
(9) date, time and initials of
- 9.
ENTERS his initials, individual that performed verification of operational data.
date and time.
~
CUE:
The JPM is complete.
Stop time Evaluator calculates the time to complete the task.
Start - Stop time is 5 15 minutes.
dote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 6 of 8
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an elementktep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 7 of 8
TEAR-OFF SHEET FOR JPM LOIT07 W TT RE C I RC U LATlO N Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are going to perform the verification of a completed Liquid Effluent Waste Sample Request.
B. The following information is provided to you:
C.
- 1. The plant is in MODE 1 with two Service Water and two Circulating Water pumps running with no expected change in configuration.
- 2. WL-TK-63A A WTT has been filled to 18,000 gals.
- 3. The A WTT has to be sampled to prepare a LEW permit for a release to the Transition Structure.
The evaluator will act as the PSO and provides cues and communications for this JPM. Do you have any questions?
11.0 Initiating Cue:
PSO to US, Unit Supervisor (or students name) I have completed Section One of Form CP 4.1A. Please perform the verification, using CP-4.1, ON1 01 8.07, and the i n f ormat ion provided.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT07 Page 8 of 8
FPL Seabrook Station JOB PERFORMANCE MEASURE LOIT08 POST SCENARIO EAL DETERMINATION AND EVENT CLASSIFICATION Student Name:
Badge #:
Evaluator Name:
Badge #:
Date:
Student Signature:
(optional)
Evaluator Signature:
Date:
Training Coordinator Signature:
Date: -
SAT UNSAT This JPM was administered for qualification: NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the authorization of the Training Manager.
PREPARED BY:
DATE:
INSTRUCTOR REVIEWED BY:
DATE:
SUBJECT MATTER EXPERT (OPTIONAL)
APPROVED BY:
DATE:
TRAIN I N G S U P E RV I SO R
1.o 2.0 3.0 4.0 5.0 6.0 JOB PERFORMANCE WORKSHEET Task Number and
Description:
Position:
SRO 3450504203 Classify/reclassify an emergency condition.
Conditions:
This JPM is designed to be administered after the student has completed any simulator scenario. The intent is for the student to perform the JPM immediately after the scenario is ended while the simulator is in FREEZE. The evaluator will be required to determine the correct responses either prior to the scenario OR after the student has performed the JPM and has left the simulator room.
Standards:
Identify the applicable Emergency Action Level(s) and classify the event.
Student Materials:
Copy of the Tear-Off Sheet.
CSF status tree clipboard with the following:
F-0.0, CSF STATUS TREE WORKSHEET, Rev. 18 F-0.1, SUBCRITICALITY, Rev. 16 F-0.2, CORE COOLING, Rev. 16 0
F-0.3, HEAT SINK, Rev. 17 0
F-0.4, INTEGRITY, Rev. 17 F-0.5, CONTAINMENT, Rev. 16 F-0.6, INVENTORY, Rev. 16 0
0 F-0.8, RDMS, Rev.16 F-0.7, EMERGENCY RECIRCULATION, Rev. 16 ER-1.I, Classification of Emergencies, Rev. 37 L i m it at i o n s on perform a n ce :
Perform all steps. Verbalize all actions to the evaluator
References:
Procedures F-0.1, SUBCRITICALITY F-0.2, CORE COOLING F-0.0, CSF STATUS TREE WORKSHEET Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT08 Page 2 of 9
SYS KA Description 2.4.41 Knowledge of the emergency action level thresholds and classification.
7.0 8.0 9.0 10.0 Value SRO
4.1 Setting
Simulator After the completion of any simulator scenario.
Safety Consider at i on s :
None Approximate Completion Time:
20 minutes Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are the WCS.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LO IT08 Page 3 of 9
B.
C.
D E.
F.
G.
H.
I.
J.
JOB PERFORMANCE WORKSHEET The following information is provided to you:
Using reference material available in the control room and based on present plant conditions, determine whether any Emergency Action Level is being exceeded and whether an Emergency Classification is warranted.
The performance must meet the following standard:
- 1. Determine the status of the Critical Safety Function Status Trees then determine the Emergency Action Level and Event Classification.
Perform the task using the CSF clipboard and ER-1.I.
To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
During the course of the walk-through examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
I will inform you when the JPM is complete We will begin after the Initiating Cue is read.
The evaluator will act as the SM and provide the cues and communications for this JPM. Do you have any questions?
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT08 Page 4 of 9
~
~~ -~
JOB PERFORMANCE WORKSHEET I 1.O Initiating Cue:
Evaluator to student, SM to WCS (or students name), based upon present plant conditions and using ER-1.I, Classification of Emergencies, determine whether an Emergency Classification is warranted.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT08 Page 5 of 9
PERFORMANCE CHECKLIST D = Discuss E LE M E N T/ST E P STANDARD EVALUATION INlTlALSiDATE
- d e not e s cr i t i ca I S=Simulate critical step standard SAT UNSAT
'=Perform
- denotes a NOTE:
Due to performing this JPM without actions by an operating crew, keep the simulator in FREEZE
- 1.
P Start time Initiating cue read.
NOTE: RDMS can be used whether the simulator is in RUN or FREEZE.
- 2.
P DETERMINE whether any of DETERMINES CSF status the critical safety functions (CSFs) are challenged.
by observing colors on SPDS and validating conditions for the following CSF status trees Subcriticality 0
Core Cooling 0
Heat Sink 0
RCS Integrity 0
Containment Integrity Circles the letter and color of each CSF event or combination of events identified on form ER-1.1A.
~
- 3.
P Review and then circle the Reviews and then misce I la neous emergency circles the conditions and combinations of miscellaneous miscellaneous conditions that eme rg ency conditions correspond to actual station and combinations of conditions :
miscellaneous conditions that correspond to actual station conditions on form ER-1.1A.
dote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT08 Page 6 of 9
PERFORMANCE CHECKLIST D=Discuss ELEMENTETEP
'=Perform
- denotes a S=Simulate critical steP STANDARD EVALUATION I N IT I A LSlD AT E
- denotes critical standard SAT UNSAT
- 4.
P Circle any combinations of Circles any miscellaneous emergency combinations of conditions and critical safety miscellaneous functions that corresponds to actual station conditions.
emergency conditions and critical safety functions that
- _ ~ -__
corresponds to actual station conditions CUE: It is the discretion of the SM to perform the evaluation of EAL's 12a, 12b, 12d, & 12e after initial classification is made.
- 5.
P Identify the most severe Identifies the most emergency classification that severe emergency corresponds to the events classification that circled corresponds to the events circled CUE:
"The JPM is complete."
~
- 3.
Stop time Start - Stop time is 5 20 minutes.
Evaluator calculates the time to complete the task.
IJote to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT08 Page 7 of 9
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an elementlstep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT08 Page 8 of 9
TEAR-OFF SHEET FOR ADMIN JPM LOIT08 CSFST E-PLAN CLASSIFICATION Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are the WCS.
B. The following information is provided to you:
Using reference material available in the control room and based on present plant conditions, determine whether any Emergency Action Level is being exceeded and whether an Emergency Classification is warranted.
C. The evaluator will act as the SM and provide the cues and communications for this JPM. Do you have any questions?
Initiating Cue:
Evaluator to student, SM to WCS (or students name), based upon present plant conditions and using ER-1.I, Classification of Emergencies, determine whether an Emergency Classification is warranted.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT08 Page 9 of 9
FPL Seabrook Station JOB PERFORMANCE MEASURE L0027J QPTR CALCULATION Badge #: ____-
Student Name:
Evaluator Name:
Badge #:
_- ~-
Student Signature:
Date:
(optional)
~
~
Eva I ua tor Sig na t u re :
Training Specialist Signature:
Date: -
Date:
~~~
SAT UNSAT This JPM was administered for qualification:
YES NO This material is developed for FPL Energy training programs by the Training Group.Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the authorization of the Training Manager.
I DATE:
PREPARED BY:
INSTRUCTOR REVIEWED APPROVED BY:
BY:
DATE:
DATE: R & b r
JOB PERFORMANCE WORKSHEET 1.O Task Number and
Description:
Position:
RO 01 50200501 Perform A Manual QPTR Calculation
2.0 Conditions
A Plant is now at 100°/~ power after recovering from a dropped rod at EOL.
B. The main plant computer has been inoperable since yesterday (It was inoperable when the rod dropped).
C. The Detector Current Comparator upper section deviation alarm is lit.
D. The seven day QPTR surveillance is scheduled to be done this shift.
E. Incore/Excore calibration was performed yesterday (before the rod dropped).
3.0 Standards
Perform the manual QPTR surveillance per RXl703, QPTR Surveillance.
4.0 Student Materials:
Copy of the Directions Tear-Off Sheet Calculator RX1703, QPTR Surveillance, Rev. 7, Chg. 1 5.0 Limitations on performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0027J Page 2 of 10
-~
JOB PERFORMANCE WORKSHEET SYS 01 5 015 01 5 GEN Gen 6.0
References:
KA Description Value RO/SRO A I.04 Ability to monitor changes in QPTR.
3.513.7 2.1.7 Ability to evaluate plant performance and make 3.714.4 K5.12 Knowledge of QPTR.
3.213.6 K5.16 Definition and calculation of QPTR.
2.913.4 operational judgments based on operating characteristics, reactor behavior, and instrument behavior.
plant procedures during all modes of operation.
2.1.23 Ability to perform specific system and integrated 3.914.0 Procedures
- RX1703, QPTR Surveillance.
OS1 000.05, Power Increase.
ON1251.01, Loss Of Plant Computer.
7.0 Setting
Classroom
- 1. Give the student a copy of 100% power NI cabinet values.
- 2. Examiner must prepare a completed RXl703A in advance. It shall reflect the JPM values for NI cabinet detector currents and the RE-17 100°/o power, 0% AFD values
- 3. Use values listed in RE-17.
8.O Safety Considerations :
None 9.0 Approximate Completion Time:
20 minutes 10.0 Directions to the Student(s):
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
I. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0027J Page 3 of 10
JOB PERFORMANCE WORKSHEET A. You are the Primary Operator. You are going to perform the QPTR surveillance.
B. The following information is provided to you:
- 1. Plant is now at 100% power following the recovery of a dropped rod at EOL.
- 2. The main plant computer has been inoperable since yesterday.
- 3. The Detector Current Comparator upper section deviation alarm is lit.
- 4. The QPTR surveillance is scheduled to be done this shift.
- 5. IncorelExcore calibration was performed yesterday (before the rod dropped).
C. You may request a Peer Check of your actions while performing the task.
D. Perform the task using RX1703, QPTR Surveillance.
E. To perform the task successfully, you must performkimulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. (Statement optional for multiple JPMs)
During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete.
I. We will begin after the Initiating Cue is read.
J. I will act as the US and provide the cues and communications for this JPM. Do you have any questions?
1 I
.O Initiating Cue:
US to Primary Operator, Primary Operator (or students name), perform the QPTR Surveillance in accordance with RX1703 and the data provided.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0027J Page 4 of 10
PERFORMANCE CHECKLIST D=Discuss ELEMENTISTEP STANDARD EVALUATION I N IT I ALS/DAT E S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 1.
P Start time Initiating cue read.
0 Obtains a copy of
~
RX1703.
NOTE: After the correct procedure is located, give the student the copy from the JPM. When the correct form is referenced, give the student a blank form from the JPM.
CUE:
When SM is informed to make an entry into action statement tracking log and database; Acknowledge the communication.
CUE:
If student asks: The QPTR alarm surveillance has been entered and the RTS is being generated. Continue with the QPTR calculation.
CUE:
peer check your actions. Please continue with the task.
If the student requests a Peer Check at any time during the JPM, respond: No one is available to NOTE: Provide Detector current data for upper & lower detectors
- 2.
P Refers to section 4.1, Surveillance With QPTR Alarm Inoperable:
- a. RECORD the current output a.
Records detectors from the top (A) and bottom (6) detector of each channel on Form A, Quadrant Power Tilt Calculation Sheet.
output in row 1 of Form A (records values in microamps):
0 N41 top detector 0
N42 top detector 0
N43 top detector N44 top detector 0
N41 bottom detector N42 bottom detector 0
N43 bottom detector 0
N44 bottom detector Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0027J Page 5 of 10
PERFORMANCE CHECKLIST D=Discuss ELEMENTKTEP STANDARD EVALUATION INITIALS/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical NOTE:
Provide the student with a copy of RE-17 if asked.
- 3.
P Using data from Technical Data Book Figure RE-17, RECORD the 100% power, 0%
AFD detector current, for the top (A) and bottom (B) detector of each channel on Form A, Quadrant Power Tilt Calculation Sheet.
- 4.
P CALCULATE the normalized detector current by dividing each detector current by its 100% power, 0% AFD current.
RECORD the results on Form A, Quadrant Power Tilt Calculation Sheet.
- 5.
P CALCULATE the average normalized detector current for the top detectors and for the bottom detectors. RECORD the results on Form A, Quad rant Power Tilt Calculation Sheet.
- 6.
P CALCULATE the Quadrant Power Tilt Ratio for each detector by dividing each normalized detector current by its associated average normalized detector current.
COMPLETE Form A, Quadrant Power Tilt Calculation Sheet.
From TDB fig RE-17, Records 100% power, 0%
AFD values in Row 2:
0 4 Top Detectors 0
4 Bottom Detectors Calculates and records Normalized Detector Currents in Row 3:
0 4 Top Detectors 0
4 Bottom Detectors Calculates and records average normalized detector currents in Row 4:
0 Top Bottom Calculates and records QPTR for each detector in Row 5:
4Top 0
4 Bottom Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0027J Page 6 of 10
PERFORMANCE CHECKLIST D=Discuss ELEMENTKTEP
=Perform
- denotes a S=Simulate critical steP STANDARD
- denotes critical standard EVALU AT1 ON SAT UNSAT IN IT1 ALS/DATE NOTE: If the student expresses a rounded off value, then that value shall be compared against the standard The only value that is critical is the out of tolerance (asterisked ) QPTR value.
CUE:
- 7.
CUE:
- 9.
CUE:
- 9.
If the student inquires about the RTS provide the following cue: The RTS is being printed out, please circle the maximum power tilt ratio on your calculation sheet, and continue with the procedure.
P RECORD the maximum power
- Identifies (circles) the tilt ratio on applicable RTS.
maximum power tilt ratio consistent with the answer key.
If the student does not report TS compliancehon-compliance, provide the cue: Is QPTR within Tech. Spec. Limits?
P If the Quadrant Power Tilt
- Determines and reports that QPTR is outside TS Ratio is determined to be greater than 1.02, immediately limits.
NOTIFY the SS/US.
The JPM is complete.
Stop time Evaluator calculates the time to complete the task.
Start - Stop time is s 20 minutes.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0027J Page 7 of 10
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an elementktep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0027J Page 8 of 10
TEAR-OFF SHEET FOR JPM L0027J Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task A. You are the Primary Operator. You are going to perform the QPTR surveillance.
- 6. The following information is provided to you:
- 1. Plant is now at 100% power following the recovery of a dropped rod at EOL.
- 2. The main plant computer has been inoperable since yesterday.
- 3. The Detector Current Comparator upper section deviation alarm is lit.
- 4. The QPTR surveillance is scheduled to be done this shift.
- 5. Incore/Excore calibration was performed yesterday.
C. You may request a Peer Check of your actions while performing the task.
D. Perform the task using RX1703, QPTR Surveillance E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful cornpletion of the task.
F. (Statement optional for multiple JPMs)
During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete.
I. We will begin after the Initiating Cue is read J. The evaluator will act as the US and provide the cues and communications for this JPM. Do you have any questions?
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0027J Page 9 of 10
TEAR-OFF SHEET FOR JPM L0027J Initiating Cue:
US to Primary Operator. Primary Operator (or students name), perform the QPTR Surveillance in accordance with RX1703 and the data provided.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0027J Page 10 of 10
FPL Seabrook Station JOB PERFORMANCE MEASURE L0043J SHUTDOWN MARGIN CALCULATION (MODE 1)
Student Name:
Badge #:
Evaluator Name:
- Badge #:
Student Signature:
Date:
(optional)
Evaluator Signature:
- Date:
Training Coordinator Signature:
Date:
(optional)
SAT UNSAT This JPM was administered for qualification:
YES NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the authgrization of the Training Manager.
REVIEWED BY:
DATE:
APPROVED BY:
DATE: L / ? / d y
4.o 2.0 3.0 4.0 5.0 6.0 Description JOB PERFORMANCE WORKSHEET Value ROISRO Task Number and
Description:
SYS 001 000 APE 005 GEN GEN Position:
RO KA K5.08 AK1.05 2.1.7 2.1.25 001 01 00401 Perform Shutdown Margin Calculations Reason for rod insertion limits & effect on SDM.
Calculation of minimum shutdown margin.
Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
Ability to obtain and interpret station reference materials such as graphs, monographs, and tables which contain performance data.
Conditions:
3.914.4 3.314.1 3.714.4 2.813.1 A. The plant is in Mode 1, EOL at 100% RTP, 300 ppm boron and stable.
- 6. During performance of OX1410.02, Quarterly Rod Op Surveillance, rod H-2 dropped to the bottom of the core.
C. Rod H-2 cannot be moved.
D. The Dropped Rod abnormal, OS1210.05 actions are being performed.
Standards:
Determine the shutdown margin within t 150 pcm.
Student Materials:
Copy of the Tear-Off Sheet.
RX1707, Shutdown Margin Surveillance, Rev. 7 Chg. 04.
Primary Technical Data Book curves RE-8 Rev. 10-10-03, RE-18 Rev. 01-10-01, and RE-I 9 Rev. 10-1 3-03.
Limitations on performance:
Simulate/Perform all steps. Verbalize all actions to the evaluator.
Even if requested, no Peer Checks will be provided during the JPM.
References :
0 RX1707, Shutdown Margin Surveillance Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0043J Page 2 of 9
JOB PERFORMANCE WORKSHEET
7.0 Setting
Simulator, Control Room or Classroom
- 1. Simulator setup requires event to be actuated and frozen as a static scenario.
Alternatively, the calculation may be performed outside the simulator.
- 2. Because simulator core cycle may lag core cycle in the plant and appropriate Primary TDB figures will vary, the instructor must prepare an answer key prior to performance of this JPM for the selected setting.
- b. Enter malfunction {IMF CPOlO Dropped Rod: RCCA H-2).
- c. Stabilize the plant at 100°/o RTP
- 1) Place Rods in Manual
- 2) Decrease turbine load & match TCIJGITREF
- 3) Reset C-7 if necessary
- 3. Simulator setup as follows:
8.O Safety Considerations :
None 9.0 Approximate Completion Time:
15 minutes 10.0 Directions to the Student(s):
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are going to calculate Shutdown Margin in Mode 1 B. The following information is provided to you:
- 1. The plant is in Mode 1, at 100°/o RTP, EOL, 300 ppm boron and stable. Core burnup is 18,000 MWDIMTU.
- 2. During performance of OX141 0.02, Quarterly Rod Operability Surveillance, rod H-2 dropped to the bottom of the core.
- 3. Rod H-2 cannot be moved up or down.
- 4. The Dropped Rod abnormal, OS1 21 0.05 actions are being performed.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0043J Page 3 of 9
JOB PERFORMANCE WORKSHEET C. You may request a Peer Check of your actions while performing the task D. Perform the task using RX1707, Shutdown Margin Surveillance.
E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. (Statement optional for multiple JPMs)
During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facilitys procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete I.
We will begin after the Initiating Cue is read.
J. I will act as the US and provide the cues and communications for this JPM. Do you have any questions?
11.O initiating Cue:
US to student (or students name), Based on given plant conditions, CALCULATE the Shutdown Margin per RX1707.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0043J Page 4 of 9
PERFORMANCE CHECKLIST D = Discuss E LE M E N T/ST E P STANDARD EVALUATION INITIALS/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical NOTE: Provide RE procedure M I 7 0 7 & curves RE-8, RE-18, and RE-19 upon the students request.
- 1.
P Start time Initiating cue read CUE:
peer check your actions. Please continue with the task.
If the student requests a Peer Check at any time during the JPM, respond: No one is available to
- 2.
P Refer to section 4.4 of RX1707, Refers to section 4.4 of Shutdown Margin Verification RX1707.
With Inoperable Rod(s) -
Immovable, Untrippable Or Dropped.
- 3.
P Shutdown Margin Verification with inoperable rod(s) in MODES 1 and 2 is accomplished by completing Part I of Form C, Shutdown Margin Determination
- Immovable, Untrippable or Dropped Rod(s).
- a. Determine number of
- a. Records number of Immovable, Untrippable and Dropped Rod(s) of Form C dropped rods on Part 1 (value a = 1).
- b. Determine maximum Worth
- b. Obtains / records RE-18 Individual of Immovable, UTtrippable or Dropped Rod (Primary Technical Data Book Figure RE-18 value for dropped rod.
(value b = RE-18 value for dropped rod.)
-__ _ _ ~
- c. DetermineTotal Unavailable
- c. Calculates Unavailable Rod Worth Rod Worth (value c).
(value a) x (value b) =
(value c).
CUE:
If student request boron concentration, reply RCS boron concentration is 300 ppm.
- d. Determine Total Power
- d. Obtainslrecords Total
~~
Defect - For Current Relative Power (Primary Technical Power Defect for current power (value d).
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0043J Page 5 of 9
PERFORMANCE CHECKLIST 0 = Discuss E LE ME N T/STE P STANDARD EVALUATION INITIALS/DATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical Data Book Figure RE-8).
- e. Determines worth of the
- e. Obtainshecords current Control Banks Inserted to the Rod Insertion Limit - For Current Relative Power (value e).
(Primary Technical Data Book Figure RE-19).
power worth of control banks inserted to RIL
~- __
- f. Determines Total Control and f.
Obtainslrecords Total Control & SD Rod Worth Minus Stuck Rod from Shutdown Rod Worth Minus Stuck Rod and less 10%
uncertainty (Primary RE-18 (value f).
Technical Data Book Figure
~
RE-18).
- g. Determines Shutdown Margin *g. Calculates SDM within t
[f - (c + d + e)] I 1,000 0.15 %.IWK of answer key.
UE:
The JPM is complete.
4 Stop time Evaluator calculates the time to complete the task.
Time to complete the task I 15 minutes.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0043J Page 6 of 9
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an elementistep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0043J Page 7 of 9
~
TEAR-OFF SHEET FOR JPM L0043J Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task A. You are going to calculate Shutdown Margin in Mode 1
- 6. The following information is provided to you:
- 2. During performance of OX141 0.02, Quarterly Rod Operability Surveillance, rod H-2 dropped to the bottom of the core.
- 3. Rod H-2 cannot be moved up or down.
- 4. The Dropped Rod abnormal, OS1210.05 actions are being performed.
C. You may request a Peer Check of your actions while performing the task.
D. Perform the task as per RX1707, Shutdown Margin Surveillance E. To perform the task successfully, you must performisirnulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. (Statement optional for multiple JPMs)
During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facility's procedural guidance and the indications available.
G. (Statement optional for multiple JPMs)
Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete I. We will begin after the Initiating Cue is read.
J. The evaluator will act as the US and provide the cues and communications for this JPM. Do you have any questions?
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
L0043J Page 8 of 9
TEAR-OFF SHEET FOR JPM L0043J Initiating Cue:
US to student (or students name), Based on given plant conditions, CALCULATE the Shutdown Margin per RX1707.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0043J Page 9 of 9
FPL Seabrook Station JOB PERFORMANCE MEASURE LO0021 AC POWER SOURCE WEEKLY SURVEILLENCE Student Name:
Badge #:
Eva I uator Name:
Badge #:
Student Signature:
Date:
(optional)
Evaluator Signature:
Date:
Training Coordinator Signature:
Date:
(optional)
SAT UNSAT This JPM was administered for qualification:
NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation.
This material may not be reproduced without the authorization of the Training Manager.
n PREPARED BY:
DATE:
12 a7 #q I
C 1
1 INSTRUCTOR I
REVIEWED BY:
APPROVED BY:
DA DA
'E:
'E: 'L(r[q
JOB PERFORMANCE WORKSHEET Sys-Mode 062 1.0 2.0 3.0 4.0 5.0 6.0 KA Description Value ROlSRO A4.01 Ability to operate and monitor all breakers 3.3-3.1 Task Number and
Description:
Position:
RO 0620200601 Coordinate AC Power Sources Weekly Operational Check.
Conditions:
A. The plant is in MODE 1 (2, 3 or 4)
B. The RCS is 557°F and 2235 psig.
C. The A EDG is out of service due to a failed surveillance.
Standards:
Perform the AC Power Source Weekly Surveillance MODES 1 through 4 OX1446.01 to ensure operability of offsite sources.
Student Materials:
A. Copy of the Tear-Off Sheet B. Access to The MPCS C. Copy of OX1446.01, Rev 8, Chg 8, AC Power Source Weekly Surveillance Limit at i o n s on perform an ce :
Simulate/Perform all steps. Verbalize all actions to the evaluator
References:
Procedures OX1446.01 AC Power Source Weekly Surveillance Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOO02 Page 2 of 8
7.0
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
- 7.
8.0 9.0 10.0 JOB PERFORMANCE WORKSHEET Setting:
Simulator This JPM can be performed on any MODE 4 or higher IC.
Place the simulator in RUN.
Insert mfED031 (DG-1A Auto Start Failure)
Override DG-I A Emergency Stop Pushbuttons Place A EDG Output Breaker to PTL and rackout breaker Hang Danger tag on output breaker.
Note that IC#217 has been snapped with these commands such that other JPMs may be performed simultaneously.
Safety Considerations:
None Approximate Completion Time:
10 minutes Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are the Secondary Operator. You are going to perform OX1446.01 AC Power Source Weekly Surveillance MODES 1 through 4 to ensure operability of offsite sources B. The following information is provided to you:
- 1. The plant is in MODE 1 (2, 3 or 4).
- 2. The RCS is 557°F and 2235 psig.
- 3. The A EDG is out of service due to a failed surveillance.
C. The performance must meet the following standard:
I. Determine the operability of offsite sources per AC Power Source Weekly S u rvei I la n ce D. Perform the task using OX1446.01 AC Power Source Weekly Surveillance Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0002i Page 3 of 8
JOB PERFORMANCE WORKSHEET E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of this task.
F. During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facility's procedural guidance and the indications available.
G. Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete I. We will begin after the "Initiating Cue" is read J. I am the US in the control room. I will provide the cues and communications for this JPM. Do you have any questions?
11.O Initiating Cue:
US to Primary Operator, "Secondary Operator, (or student's name) using the provided OX1446.01, determine the operability of the Offsite AC Power Sources for Bus 5UAT/Bus 6RAT (Form A)".
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOO02 Page 4 of 8
PERFORMANCE CHECKLIST D= Discuss E LEMENTETEP STANDARD EVALUATION INITIALWDATE
=;=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- de notes critical
- 1.
P Start time Initiating cue read.
NOTE: Provide the student a copy of OX1446.01
- 2.
P After obtaining a copy of Determines there are no OX1446.01, reviews prerequisites and precaution precautions and prerequisites.
is N/A.
CUE: If dispatcher is asked for line status, inform the student that the line is connected.
Performs Step 4.1.I.I
- 3.
P Completes Form A as directed Verifies the availability of by initial cue for Bus 5UAT.
offsite power from the Bus 5 UAT Breaker to one offsite source by referring to applicable MCB indications. (All three possibilities are listed, only one is required) 0 Checks appropriate blocks on Form A as noted per key.
0 Records appropriate line MW.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0002i Page 5 of 8
PERFORMANCE CHECKLIST D= Discuss E LEME NT/STEP STANDARD EVALUATION INlTlALSlDATE S=Simulate critical step standard SAT UNSAT
=Perform denotes a
- denotes critical Performs Step 4.1.1.2
- 4.
P Completes Form A as directed 0
Verifies the availability of by initial cue for Bus 6RAT.
offsite power from the Bus 6 RAT Breaker to a different offsite source by referring to applicable four possibilities are listed, only one is required) blocks on Form A as noted per key.
MW.
MCB indications. (All
~~~
0 Checks appropriate 0
Records appropriate line
~
CUE: When at step 4.1.2, inform the student it is NOT desired to use Figure 1.
Step 4.1.3
- 5.
P Determine number of operable
- Student should note that 2 offsite sources and record on Table 1.
sources are available and note on Table 1.
CUE: The JPM is co m pletE.
Stop time:
Evaluator calculates the time to complete task.
Time to complete the task
< 10 minutes.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOO02 Page 6 of 8
PERFORMANCE CHECKLIST D= D i scu ss E LE ME NT/STE P STANDARD EVALUATION INITIALSDATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical Performs Step 4.1.1.2
- 4.
P Completes Form A as directed 0
Verifies the availability of by initial cue for Bus GRAT.
offsite power from the Bus 6 RAT Breaker to a different offsite source by referring to applicable four possibilities are listed, only one is required) blocks on Form A as noted per key.
MW.
MCB indications. (All _. ~-
0 Checks appropriate 0
Records appropriate line
~
CUE: When at step 4.1.2, inform the student it is NOT desired to use Figure 1.
Step 4.1.3
- 5.
P Determine number of operable
- Student should note that 2 offsite sources and record on Table 1.
sources are available and note on Table 1.
CUE: The JPM is co m p lete.
Stop time:
Evaluator calculates the time to complete task.
Time to complete the task
< 10 minutes.
~~
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0002i Page 6 of 8
PERFORM AN C E S U M MARY Provide comments on unsatisfactory performance of an elementktep or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0002i Page 7 of 8
TEAR-OFF SHEET FOR JPM L0002i Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task A. You are the Secondary Operator. You are going to perform OX1446.01 AC Power Source Weekly Surveillance MODES 1 through 4 to ensure operability of offsite sources
- 8. The following information is provided to you:
- 1. The plant is in MODE 1 (2, 3 or 4).
- 2. The RCS is 557°F and 2235 psig.
- 3. The 'A' EDG is out of service due to a failed surveillance.
C. I am the US in the control room. I will provide the cues and communications for this JPM. Do you have any questions?
12.0 Initiating Cue:
US to Primary Operator, "Secondary Operator, (or student's name) using the provided OX1446.01, determine the operability of the Offsite AC Power Sources",
for Bus 5UAT/Bus 6RAT (Form A)".
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
L0002i Page 8 of 8
FPL Seabrook Station JOB PERFORMANCE MEASURE LOIT04 INITIATE A LIQUID EFFLUENT WASTE SAMPLE REQUEST Student Name:
Badge #:
~-
Badge #:
Eva I ua tor Name:
Student Signature:
Date:
(optional)
Eva I ua tor Signature:
.- Date:
Training Coordinator Signature:
Date: -
(optional)
SAT UNSAT This JPM was administered for qualification:
NO This material is developed for FPL Energy training programs by the Training Group. Text materials and figures contained in this document are developed for purposes of instruction and should not be used in connection with either plant maintenance or plant operation. This material may not be reproduced without the authorization of the Training Manager.
4 PREPARED BY:
DATE:
J ~[qiy]d'%
REVIEWED APPROVED BY:
BY:
DA DA
'E:
JOB PERFORMANCE WORKSHEET Sys-Mode KA Description 2.3.1 0 Ability to perform procedures to reduce excessive levels of radiation and guard against personnel exposure.
1.o 2.0 3.0 4.0 5.0 6.0 Value RO/SRO 2.9 i 3.3 Task Number and
Description:
Position:
RO 11 901 53001 Conditions:
A. The plant is in MODE 1 with two Service Water and two Circulating Water pumps running with no expected change in configuration.
B. WL-TK-63A 'A' WTT has been filled to 18,000 gals.
C. The 'A' WTT has to be sampled to prepare a LEW permit for a release to the Transition Structure.
Initiate a release of liquid waste.
Standards:
Using the information provided, initiate a Liquid Effluent Waste Sample Request using CP-4.1, "Effluent Surveillance Program".
Student Materials:
Copy of the Tear-Off Sheet Copy of ON101 8.07, WASTE TEST TANK RECIRCULATION, Rev.04.CHG 06 Copy of CP 4.1, Effluent Surveillance Program, Revl7, CHG04 Li m it at i o n s on perfor man ce :
Perform all steps. Verbalize all actions to the evaluator.
References:
Procedures
- SSCP, ON1018.07, WASTE TEST TANK RECIRCULATION CP 4.1, Effluent Surveillance Program.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT04 Page 2 of 8
~-
JOB PERFORMANCE WORKSHEET 7.0 8.0 9.0 10.0 Setting:
In-plant MCR / Simulator / Classroom Safety Considerations:
PPE, as appropriate for setting Approximate Completion Time:
15 minutes Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task.
A. You are going to perform initiation of a Liquid Effluent Waste Sample Request, using the information provided.
B. The following information is provided to you:
- 1. The plant is in MODE 1 with two Service Water and two Circulating Water pumps running with no expected change in configuration.
- 2. WL-TK-63A 'A' WTT has been filled to 18,000 gals.
- 3. The 'A' WTT has to be sampled to prepare a LEW permit for a release to the Transit ion Structure.
C. The performance must meet the following standard:
- 1. Perform the verification of the completed form.
- 2. Time for completion 15 minutes.
D. Perform the task utilizing OS1 01 8.07. WASTE TEST TANK RECIRCULATION and CP 4.1 Effluent Surveillance Program.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT04 Page 3 of 8
JOB PERFORMANCE WORKSHEET E. To perform the task successfully, you must perform/simulate all critical steps correctly and verbalize all your actions to the evaluator. Practicing STAR techniques and using the station communication standard will safeguard successful completion of the task.
F. During the course of the walkthrough examination, there may be some tasks you will be asked to perform that may require you to implement an alternative method directed by plant procedures in order to complete the assigned task. You are expected to make decisions and take actions based on the facility's procedural guidance and the indications available.
G. Failure to perform or simulate a critical element within the prescribed standard will result in a failure of the task.
H. I will inform you when the JPM is complete I.
We will begin after the Initiating Cue is read.
J. The evaluator will act as the PSO and provides cues and communications for this JPM. Do you have any questions?
1 I
.O Initiating Cue:
US to RO,
Reactor Operator (or student's name) using the information provided, initiate a Liquid Effluent Waste Sample Request in accordance with CP-4.1A.
Provide completed request to the US upon completion for review.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LO IT04 Page 4 of 8
PERFORMANCE CHECKLIST D = Discuss EL E ME NT/STE P STANDARD EVALUATION INlTlALSiDATE S=Simulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical
- 1.
NOTE:
- 2.
- 3.
CUE:
P Start time Initiating cue read and information provided.
It is assumed that the candidate will use CP 4.1 to process through the verification and check ON1018.07 to verify the tank volume and recirculation flow rate. The candidate may choose to verify the tank volume and recirculation rate prior to referring to CP 4.1. These steps can be performed in any order as long as all steps are completed correctly.
P Obtains required procedures.
Obtains CP-4.1, CP-
- 4. IA, and ON1 01 8.07.
P Completes Section 1 of CP-4.1A with all of the following attributes:
(1) Enters name of tank to be *I.
ENTERS WTT A or
~~~
~-
sampled.
W L-TK-63A.
If the candidate wants to verify the amount of liquid in the WTT using the hlPCS. tell him that the MPCS point indicates 18,000 gallons.
(2) Enters total tank or sump
- 2.
ENTERS 18,000 volume to be discharged or transferred.
consistent with initial gallons which is conditions provided and indications, if checked.
~______
(3) Enters recirculation rate.
- 3 ENTERS 150 gpm in the recirculation rate block.
~
(4) Calculates and enters
- 4 CALCULATES and minimum recirculation ENTERS 240 minutes time.
in the minimum recirculation time block.
(5) Enters the disposition of
- 5.
CHECKS discharqe as the tank.
disposition.
d e to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT04 Page 5 of 8
PERFORMANCE CHECKLIST D= Discuss E LE ME NT/STEP STANDARD EVALUATION INITIALYDATE S=Sirnulate critical step standard SAT UNSAT
=Perform
- denotes a
- denotes critical (6) Enters Recirculation Start
- 6.
ENTERS todays date and whatever time is Date & Time appropriate.
-~
(7) Enters Sample Date and
- 7.
ENTERS todays date from recirc start time)
Time and time (+240 minutes (8) Enters the projected CW
- 8.
ENTERS 2 CW pumps
& SW pump combination for the discharge (provided) conditions.
and 2 SW pumps consistent with initial
~~
NOTE: Operator may request specific time based on manpower and scheduling.
CUE: If requested, the projected release time will be eight hours from the sample time.
(9) Enters the projected
- 9.
ENTERS the projected release start date (todays date) and time
(+ 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from sample time) release start date and time (normally 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> from the sample time.
-~
~
~~
(IO) Enters date, time of
- 10. ENTERS time, date and request, and initials of originator.
block.
initials in the Originator
~~
(1 1) Provides completed
- 11. PROVIDES completed section 1 of LEWSR to the US for review.
LEWSR to the US CUE:
The JPM is complete.
Stop time Evaluator calculates the time to complete the task.
Start - Stop time is 5 15 minutes.
ate to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only)
LOIT04 Page 6 of 8
PERFORMANCE
SUMMARY
Provide comments on unsatisfactory performance of an element/step or for deviation from performance as stated. Record interruptions in performance such as retraining, shift change, and processing of procedure changes. Recommend remedial training, if necessary.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT04 Page 7 of 8
TEAR-OFF SHEET FOR JPM LOIT04 Directions to the Student:
Evaluator gives Tear-Off sheet to the student Evaluator reads the following to the student (Optional for multiple JPMs)
Student:
- 1. Ensures task is done correctly.
- 2. May be asked follow-up questions to confirm knowledge of task A.
You are going to perform initiation of a Liquid Effluent Waste Sample Request, using the information provided.
B. The following information is provided to you:
- 1. The plant is in MODE 1 with two Service Water and two Circulating Water pumps running with no expected change in configuration.
- 2. WL-TK-63A 'A' WTT has been filled to 18,000 gals.
- 3. The 'A' WTT has to be sampled to prepare a LEW permit for a release to the Transition Structure.
C. The evaluator will act as the PSO and provides cues and communications for this JPM. Do you have any questions?
11.O Initiating Cue:
US to RO, " Reactor Operator (or student's name) using the information provided, initiate a Liquid Effluent Waste Sample Request in accordance with CP-4.IA.
Provide completed request to the US upon completion for review.
Note to Evaluator - Obtain Tear-Off Sheets from student following JPM completion (Ops only).
LOIT04 Page 8 of 8