ML050870182
| ML050870182 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/24/2005 |
| From: | Olshan L NRC/NRR/DLPM/LPD2 |
| To: | Rosalyn Jones Duke Energy Corp |
| Olshan L N, NRR/DLPM, 415-1419 | |
| Shared Package | |
| ML050890093 | List: |
| References | |
| TAC MC4550, TAC MC4551, TAC MC4552 | |
| Download: ML050870182 (2) | |
Text
Reporting Requirements 5.6 5.0 ADMINISTRATIVE CONTROLS 5.6 Reporting Requirements The following reports shall be submitted in accordance with 10 CFR 50.4.
5.6.1 Deleted 5.6.2 Annual Radiological Environmental Operating Report NOTE----------------------------------------------
A single submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station.
The Annual Radiological Environmental Operating Report covering the operation of the unit during the previous calendar year shall be submitted by May 15 of each year.
The report shall include summaries, interpretations, and analyses of trends of the results of the radiological environmental monitoring program for the reporting period. The material provided shall be consistent with the objectives outlined in the Offsite Dose Calculation Manual (ODCM), and in 10 CFR 50, Appendix I, Sections IV.B.2, IV.B.3, and IV.C.
OCONEE UNITS 1, 2, & 3 5.0-34 Amendment Nos. 342, 344, & 343 1
Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.3 Radioactive Effluent Release Report
------- NOTE ----------------------------
A single submittal may be made for a multiple unit station. The submittal should combine sections common to all units at the station; however, for units with separate radwaste systems, the submittal shall specify the releases of radioactive material from each unit.
The Radioactive Effluent Release Report covering the operation of the unit in the previous year shall be submitted prior to May 1 of each year in accordance with 10 CFR 50.36a. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit.
The material provided shall be consistent with the objectives outlined in the ODCM and Process Control Program and in conformance with 10 CFR 50.36a and 10 CFR part 50, Appendix I,Section IV.B.1.
5.6.4 Deleted 5.6.5 CORE OPERATING LIMITS REPORT (COLR)
Core operating limits shall be established, determined and issued in accordance with the following:
- a.
Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1.
Shutdown Margin limit for Specification 3.1.1;
- 2.
Moderator Temperature Coefficient limit for Specification 3.1.3;
- 3.
Physical Position, Sequence and Overlap limits for Specification 3.2.1 Rod Insertion Limits;
- 4.
AXIAL POWER IMBALANCE operating limits for Specification 3.2.2;
- 5.
QUADRANT POWER TILT (QPT) limits for Specification 3.2.3; OCONEE UNITS 1, 2, & 3 5.0-35 Amendment Nos. 342, 344, & 3431