Outage Status Report with Handwritten Notations
ML050870059
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/20/2004
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2004-0282
Download: ML050870059 (1)


Text

NM Committed to Nuclear Excellence ag ttsReport ~,g 6AAL-fl--

Plant:

Point Beach Unit I Dav:

Tuesdav Todav's Date / Time:

4/20/04 0400 OutageDuration: Day.,17^; of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0

First Aid cases 0

Significant near misses 0

Total for this outage 1

  • Summary:
  • Pending OSHA Injury-Back Strain Radiological Dose outage to date 25.017 Projected to date 51.394 Outage Goal
  • 75 R Difference

-26.377 Number of PCEs 5

Summary:

Nuclear 6 6 c, coi am a, X Am c-c-C Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0

D erO Summary:

Plant Status Mode:

E Hot Standby (Mode 3) a Hot Shutdown (Mode 4)

E Cold Shutdown ('Mode 5) js 0Refueling Shutdown (Mode 6)

RCS:

Temperature:

l98-Pressure:

Vented to Atmosphere RV Level:

p69% o of Time to Boil:

R45 Minui Shutdown Safety Assessment Reactivity:

Green Core Cooling:

(iYello

- e Power Availability:

Green Containment:

Green Inventory:

. Yellow A

Spent Fuel Pool Cooling:

N/A Shutdown Safety Assessment Protected Equipment:

Unit I A and B Steam Generator Nozzle Dam Panels and Associated Equipment Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)

  • f'oou.41A e R

?8V£

_ )iCAf POfr Schedule:

Activities Required to Exit Yellow Risk Conditions wO Feu ~ S a s nfc1e In -9 R tft4/'

D/

G I

1) Z-13 Polar Crane Aux Hoist Return to Service L se sc4Z~"'

'65J""C ;4

2) Reactor Vessel Head Stud Rack Removal d9 IO Et6

& O

  • _~*

4 4 t 4 j~)

'^Jo F

1 Z i3)

B R C P M otorM ove M

USE{

Of J05 4As'e 'd'

/2cI~

4) Install Cavity Seal Ring

.%e.A L5c fZ'iD ADD~'

v-

'#,4ff

'£$uo"S5

5) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/20/04 Scott Manthei 4(04/04 I P2A Charging Pump Troubleshooting 4/23/04 Clay Hill 4108/04 Incorporate Lessons Learned from I s Reduced Inventory Orange Path 4/20/04 Dave Dyzak Upcoming M aor Milestones Scheduled Actual Scheduled Actual Date TimeDate ime D

Time Date T Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup >2000 4/25/04 0900 Head Lift 4/09/04 0900 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 8