NM Committed to Nuclear Excellence ag ttsReport ~,g 6AAL-fl--
Plant:
Point Beach Unit I Dav:
Tuesdav Todav's Date / Time:
4/20/04 0400 OutageDuration: Day.,17^; of 28 Safety Status Industrial - Within the last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> OSHA Recordables 0
First Aid cases 0
Significant near misses 0
Total for this outage 1
- Summary:
- Pending OSHA Injury-Back Strain Radiological Dose outage to date 25.017 Projected to date 51.394 Outage Goal
- 75 R Difference
-26.377 Number of PCEs 5
Summary:
Nuclear 6 6 c, coi am a, X Am c-c-C Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 0
D erO Summary:
Plant Status Mode:
E Hot Standby (Mode 3) a Hot Shutdown (Mode 4)
E Cold Shutdown ('Mode 5) js 0Refueling Shutdown (Mode 6)
RCS:
Temperature:
l98-Pressure:
Vented to Atmosphere RV Level:
p69% o of Time to Boil:
R45 Minui Shutdown Safety Assessment Reactivity:
Green Core Cooling:
(iYello
- e Power Availability:
Green Containment:
Green Inventory:
. Yellow A
Spent Fuel Pool Cooling:
N/A Shutdown Safety Assessment Protected Equipment:
Unit I A and B Steam Generator Nozzle Dam Panels and Associated Equipment Major Activities Completed In Last 24 Hours Critical Path and Near Critical Path Activities (Next 24 Hours)
- f'oou.41A e R
?8V£
_ )iCAf POfr Schedule:
Activities Required to Exit Yellow Risk Conditions wO Feu ~ S a s nfc1e In -9 R tft4/'
D/
G I
- 1) Z-13 Polar Crane Aux Hoist Return to Service L se sc4Z~"'
'65J""C ;4
- 2) Reactor Vessel Head Stud Rack Removal d9 IO Et6
& O
- _~*
4 4 t 4 j~)
'^Jo F
1 Z i3)
B R C P M otorM ove M
USE{
Of J05 4As'e 'd'
/2cI~
- 4) Install Cavity Seal Ring
.%e.A L5c fZ'iD ADD~'
v-
'#,4ff
'£$uo"S5
- 5) Reactor Vessel Head Lift Significant Outstanding Issues Date Issue Due Responsibility 4/03/04 Repair Blowdown Tank Leakage 4/20/04 Scott Manthei 4(04/04 I P2A Charging Pump Troubleshooting 4/23/04 Clay Hill 4108/04 Incorporate Lessons Learned from I s Reduced Inventory Orange Path 4/20/04 Dave Dyzak Upcoming M aor Milestones Scheduled Actual Scheduled Actual Date TimeDate ime D
Time Date T Time Date Time Cooldown <2000 4/03/04 2100 4/03/04 2230 Heatup >2000 4/25/04 0900 Head Lift 4/09/04 0900 Initial 4/28/04 1100 Refueled 4/14/04 0300 On-Line 4/30/04 0100 8