Text
N1%
tb~l I-/
.2-
/
c.~
Committed to Nuclear ExceJe5 Plant:
Point Beach Unit I
,5: a
-ea t.,.0 I-zp
- ,e 1/1C 6,_
"4"",
lla-Ox "q(, - J -
Outage Status Report Day:
Thursday Today's Date/Time:
4/08/04 /
0400 Outaee Duration: Day 5
of 28
'. ".., %. _. '. .., I " "' ' "j,
- _,; I I -,,
- -
. '. ' I I
I
,,
-- "" -, -,
- ; -., -
'_;
I.
I
_% ; I I
-,,
7 ..! , !.,. slaritystat,. -I' I
- ,- '!
z Industrial OSHA Recordables in last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 0
First Aid cases in last 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 0
Significant near misses 0
Total for this outage 0
Summary.
0.
Radiological Dose outage to date 12.146 Projected to date 11.086 Outage Goal
<75 R Difference
+1.06 Number of PCEs 2
Summary:
Received more dose than forecast:
Valve Repacking in Regen Hx Area Nuclear Significant human performance errors and events in last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> I
Summary:
Manipulator Crane Disconnect operated by other than an authorized permit holder Mode:
5 Hot Standby (Mode 3) 0 Hot Shutdown (Mode 4) Z Cold Shutdown (Mode 5 0
E Refueling Shutdown (mode 6)
RCS:
Temperature:
104 Pressure:
Vented to Atmosphere RV Level:
24%
Time to Boil:
28 Minutes
-~
Shlitdoi'nSafetyAssessment s
i Reactivity:
Green Core Cooling:
Orange Power Availability:
Green Containment:
Green Inventory:
Orange Spent Fuel Pool Cooling:
N/A ha -
- -c,---';'w iProtectedEgulpnient:.c
.S
':~'a
{,
j There is no protected equipment Malor Activities Completed in Lisf 24 HoursA Critical Path and Near Critical Path Kctivitie"'(ext 24 Hours)
Burped 'A' and 'B' Steam Generator Tubes Schedule:
9 Hrs Behind - Based on Drain to 25% at 0400 on 4/08/04 A & B SIG Manway bolts removed with exception of 4 S/G Primary Manway Removal G02 Diesel Generator Restored Nozzle Dam Installation.
BMI Insulation Installation Replace ISI-845A Drained RCS to 25% (Midloop)
Rx Head Disassembly - Mode 6 oh *,>^ il, 4 -- ; -
- Si fiiif nti ditstindin2 Issue '
Date Issue a
- Due Date Responsibility 4/03/04 Repair Plan for Blowdown Tank Leakage (Assign Project Lead) 4/20/04 Scott Manthei 4/04/04 IP2A Charging Pump Troubleshooting (After Orange Path) 4109/04 Mike Schug 4107/04 Total RCS Activity Potentially >.05mCi/cc, Requires maximizing purification 4/09/04 Tom Garot uY1Meo1-i66
- GRAMt0, Scheduled
- Actuseal Scheditled
.I-Actual Date Time D ite I
'Time
- Date'
' Time" '
Date:
-Time Cooldown <2000 403J04 2100 4/03/04
-2230 Heatup >2000 4/25/04 0900 Head Lift 4109/04 0900 Initial 4/28/04 1100 Refueled 4114104 0300 On-Line 4/30/04 0100 "Y-9w Page I of I I,.,( I
.