Text
- -
7,n Committed to Nulr x
,I.
. CmmitedtoNuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC
j r:
I -
May 25,2004 NRC 2004-0059 10 CFR 50.55a(a)(3)(i) !
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Unit I Docket 50-266 License No. DPR-24 Sunmlement 4 to Reactor Vessel Closure Head Penetration Repair and Flaw Characterization Relief Requests MR 02-018-1, Revision I and MR 02-018-2.
Revision I
References:
(1)
(2)
(3)
(4)
(5)-
Letter from NMC to NRC dated May 13, 2004 (NRC 2004-0051)
NRC Safety Evaluation dated September 10, 2003 NRC Safety Evaluation dated September 24, 2003 Letter from NMC to NRC dated May 15, 2004 (NRC 2004-0053)
Letter from NMC-to NRC dated May 20, 2004 (NRC 2004-0056)
In reference 1, Nuclear Management Company, LLC (NMC), licensee for Point Beach Nuclear Plant (PBNP), requested revision to the relief, granted in references 2 and 3, pertaining to reactor vessel closure head (RVCH) penetration repair and flaw characterization. References 4 and 5 provided supplemental information in support of the requested relief.
In reference 5, NMC committed to submit copies of the minutes from the Electric Power Research Institute - Materials Reliability Program (EPRI-MRP) crack growth expert panel meeting regarding primary water stress corrosion cracking (PWSCC) held on October 3, 2003. This letter fulfills that commitment.
Enclosed with this letter are proprietary and nonproprietary versions of the October.3, 2003 meeting minutes, which were requested by NRC staff.
Also included in the enclosures to this letter is an EPRI proprietary authorization affidavit.
As enclosure I contains information proprietary to EPRI, It is supported by an affidavit signed by EPRI, the owner of the information. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR 2.790 of the Commission's regulations.
ltmnm tsreHrdwdedled 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 I floftJwaJ Freedom d Inbrk606 Telephone: 920.755.2321
,~exemptionsg t
rj
Document Control Desk Page 2 Accordingly, It Is respectfully requested that the information, which is proprietary to EPRI, be withheld from public disclosure in accordance with 10 CFR 2.790.
Correspondence regarding the proprietary aspects of the items listed above, or the supporting EPRI Affidavit, should reference the affidavit and be addressed to.
Warren J. Bilanin, Director Nuclear Power Sector, Electric Power Research Institute, Nuclear Power Sector, 3412 Hillview Avenue, Palo Alto, California, 94304.
This submittal contains no new regulatory commitments and fulfills one commitment.
Gary D. Van Middlesworth Site Vice-President, Point Beach Nuclear Plant Nuclear Managernent Company, LLC
Enclosures:
i -
Minutes of EPRI-.MRP PWSCC Crack Growth Expert Panel Meeting, October 3, 2003 - Gaithersburg, Maryland (proprietary) 11 -
Minutes of EPRI-MRP PWSCC Crack Growth Expert Panel Meeting, October 3, 2003 - Gaithersburg, Maryland (non-proprietary)
IlIl -
EPRI Letter dated May 24, 2004, Transmittal of Proprietary Authorization Affidavit cc:
Project Manager, Point Beach Nuclear Plant, USNRC Regional Administrator, Region l1l, USNRC NRC Resident Inspector, Point Beach Nuclear Plant PSCW
ENCLOSURE II SUPPLEMENT 4 TO REACTOR VESSEL CLOSURE HEAD PENETRATION REPAIR AND FLAW CHARACTERIZATION RELIEF REQUESTS MR 02-018-1, REVISION 1 AND MR 02.018-2, REVISION 1 MINUTES OF EPRI-MRP PWSCC CRACK GROWTH EXPERT PANEL MEETING, OCTOBER 3, 2003-GAITHERSBURG, MARYLAND (NON-PROPRIETARY)
POINT BEACH NUCLEAR PLANT, UNIT I I
I
I -
.. I,,
I1 1
I.,
I.:.
I 1. --; -
- i I4I.
I I
- I I.
2 Pages Follow
-~
Non-Proprietary POWERING PROGRESS THROUSH G
O I
SCIENCE AND flCHINOWOY PW R M R P PWR Materials Reliability Program PWR MRP 2003-38 October20, 2003 TO:
EPRI-MRP PWSCC Crack Growth Expert Panel Alloy 600 ITG and WG Chairmen/Vice-chairmen All EPRI staff directly involved with Alloy 600 ITG Contractors currently working on this subject for the MRP FROM:
John Hickling
SUBJECT:
Minutes of EPRI-MRP PWVSCC Crack Growth Expert Panel Meeting, October 3, 2003-Gaithersburg, Maryland The final minutes of the subject meeting (incorporating comments from Panel members) are enclosed. They are being distributed more widely than usual so as to have an interim record of the agreement reached on CGR disposition curves for the Alloy 600 weld metals 182/132/82 prior to production and approval of a formal MRP report that will be analogous to MRP-55 for CGR through PWSCC in thick-section base material.
Please note that the information contained herein is preliminary in nature and should NOT be used as the basis for official submissions of any kind. Until the final report is available, all communications as to the results of the Panel's work must be channeled via EPRI. and no diagrams, equations, etc. shall be provided to outside bodies without prior, specific MRP approval.
If you have any comments or questions please contact me at 650-855-8976, or by email at ihicklin(aepri.com.
John Hickling Technical Leader - Materials Issues Nuclear Power - Science & Technology Dept.
Date:
Place:
Subiect:
Attendees:
Summary:
Non-Proprietary MRP 2003-38: Minutes of EPRI-MRP PWVSCC Crack Growth Expert Panel Meeting, October 3, 2003'- Gaithersburg, Maryland October 3, 2003 Marriott Washingtohian Center, Gaithersburg, MD EPRI-MRP PWVSCC Crack Growth Expert Pane! Meeting See Attachment I The following summarizes the results of the meeting - see the subsequent text for a summary of the discussions leading to these. Italics are used throughout to denote action items or decisions reached.
- 1. Content Deleted -MRP/EPRI Proprietary Material
- 2. Content Deleted--MRP/EPRI Proprietary Material Ex -.
Ex If
- 3. Content Deleted-MRP/EPRI Proprietary Material
' t
,;I
- 4. Content Deleted-MRP/EPRI Proprietary Material Content Deleted - MR-P/EPRI Proprietary Material S. Content Deleted - MRP/EPRI Proprietary Material gg. 4
- 6. The panel agreed on the structure for the final report and assigned lead responsibilities for*
preparing various sections - a draft will be provided for ITG review in December 2003.
u ENCLOSURE III SUPPLEMENT 4 TO REACTOR VESSEL CLOSURE HEAD PENETRATION REPAIR AND FLAW CHARACTERIZATION RELIEF REQUESTS MR 02-018-1, REVISION I AND MR 02.018-2, REVISION 1 EPRI LETTER DATED MAY 24, 204, TRANSMITTAL OF PROPRIETARY AUTHORIZATION AFFIDAVIT POINT BEACH NUCLEAR PLANT, UNIT 1 3 Pages Follow
_I.
.I W
E LE C T R iF Y;..JTHE WO RL D 1=0121 May 24, 2004 Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike -'
...I -
washington li
Subject:
Gentlemen:
Documentation: "Summary of Minutes of EPRI-MRP PWSCC Crack Growth Expert Panel Meeting, October 3, 2003 - Gaithersburg, Maryland" Attached to MRP Letter 2003-3 8 dated October 20, 2003 I-
.1 ~..
1 :
This is a request tinider'I0CFR2.790(a)(4) that the NRC withhold from public disclosure the infomriation'identified iinthe ehclosed affidaviticons'isting' of EPRI o'wned Proprietarylnformration identified ab'oVe (the '6Doc-uime'ntati'n'). ACotples'of the Documrie'nitation and the iiffdavit in support of this requ-est 'ar 'en6eoid. Th6bocumeniation 'Cohsists'niy'of th'esuim'miry'of the October 3, 2003 'ieetin'g rninutes'..'Supportini-g details provided in themhinuies'a'r'e'nt inielud&edin this'subnmittal because'of their prelimiinary nature the inforinal eo'ntext in wh'ih 'tiey were de'veloped,'ard their' release would violate MRP administrative procedures conceming industry review and approval:-The information contained in the summary is also considered preliminary, but is not expected to change when published inaiia anticipated EPRI tehnicial irepo-EPRI desir'es t6disc6ise the 'Documen'etatidn?.iii conifidence't' the'NRC asi'aTmeans of ex'ehang information in' s'upport 't'frep airsof Point Bea'ch 'Nucle'ar Plant'Unit'1CRDM Nozzle 26. -;Further,' #
EPRI welcomes any discussion with the NRC regarding the "Documentation" that the NRC desires to conduct.
The 'Docuinent'ation"is for the NRC'sintemai use iand maybe used only forf he puipses for' which'it is disclos-ed by EPRI. The '6
'ocurriinfation" nh`ould 'n'ot beotherwise used or disclos6d to any pes'outside ihteNRC 'with6ufpriofwritten perimisionfro-m EPRL-".
ts;wX-5;.-<-e k.4;sroi<
t.i
- ~
- s.
t ;.
- )-jj If you iave anyjq'uesti6ns about'the legal aspects'of this request fo r'withholding, please do n6ot hesitate'to'contacti'ielat (650) 855-2340.' Questions on the-c-intents'of the 'Documenftation"' should be direc6ted toMs.Christin' king of EPRI 'at (650) 855-2605. - ;
,,~
- 8.!s.
- tr'>*.
~
A,-.,;
Sincerely, A,
0...
a J~.
.oo
.1 Warren J. Bilanin Directo, Nucle6r Po-wer Sector ' '
ij Enclosures c:
Nichole Edraos, EPRI COAPORAYt HWADOUARTIFS 3412 1ililiew Avenue I Palo Alto CA S4304-1395 USA l 650.855.20001 Customer Service 800.313.3774 l www.epri.com
- ~~
AFFIDAVrT RE:
Documentation: "Summary of Minutes of EPRI-MRP PWSCC Crack Growth Expert Panel Meeting, October 3, 2003 - Gaithersburg, Maryland" Attached to MRP Letter 2003-38 dated October20, 2003 I, WARREN J. BILANIN, being duly sworn, depose and state as follows:
I am a Director at the Electric.Power.:Research Institute ("EPRr') and I have been specifically.delegated responsibility for.the Documentation listed above that is sought under this affidavit to be withheld (the "Documentation") and authorized to apply for their withholding on behalf 6f EPRI. This affidavit is submitted to;the Nuclear RegulatoryCortnmission ('NRC")
pursuant to 10 CFR 2.790 (a)(4) based on the fact that the Documentation consists of trade secrets of EPRI and that the NRC will receive the Documentation from EPRI under privilege and in confidence.
- Tlhe basis for withholding such Documentation from the public is set forth below:
(i) The Documentation has been held in confidence bygEPRI, its owner., All those accepting copies of the Documentation must agree to preserve the confidentiality of the Documentation.
(ii) The Documentation is a type customarily held in confidence by EPRI and there is a rational basis thereof. The Documentation is a type, which EPRI considers as a trade secret(s) and is held in confidence by:EPRI because to disclose it would prevent EPRI from licensing kthe Documentation at fees, which would allow EPRIto recover its investment.-If consultantts and/or.
other businesses providing services,in -the electric/nuclear, power industry weie,able to publicly obtain the Documentation, they would be able to use it commercially for profit and avoid spending the large amount of money that EPRI was required to spend in preparation of the Documentation.,
The rational basis that EPRI has for classifying this/these Documentation(s) as a trade secrets is justified by the Uniform Trade Secrets Act. which.California~adoptedin 1984 and which has been adopted by over twenty states. The Uniforn Trade Secrets Act defines a "trade secret" as follows:
. 'Trade secret" means information, including a formula, pattern, compilation, program, device, method, technique, or process, thai:
program (1) Derives independent economic value, actual or potential, from not being generally known to the public or to other persons who can obtain economic value from its disclosure or use; and
(2) Is the subject of efforts that are reasonable under the circumstances to maintain its secrecy.
(iii) The Documentation will be transmitted to the NRC in confidence.
(iv) The Documentation is not available in public sources. EPRI developed the Documentation only after making a determination that the Documentation was not available from public sources. It required a large expenditure of dollars for EPRI to develop the Documentation. In addition, EPRI was required to use a large amount of time of EPRI employees. The money spent, plus the value of EPRI's staff time in preparing the Documentation, show that the Documentation is highly valuable to EPRI. Finally, the Documentation was developed only after a long period of effort of several years.
(v) A public disclosure of the Documentation would be highly likely to cause substantial harm to EPRI's competitive position and the ability of EPRI to license the Documentation both domestically and internationally. The Documentation can only be acquired and/or duplicated by others using an equivalent investment of time and effort.
I have read the foregoing and the matters stated therein are true and correct to the best of my knowledge, information and belief. I make this affidavit under penalty of perjury under the laws of the United States of America and under the laws of the State of California.
] Executed at 3412 Hillview Avenue, Palo Alto, being the premises and place of business of the
-Electric Power Research Institute:
date S--
2 C-e 1 Wa>J. Bilanin Subscribed and sworn before me this day:
date oelexn Edraos, Notary Public Q-Lc
~
- Co=m.l1295481 i
51 E
MM.
June 24, 2004 Mr. Warren J. Bilanin, Director Nuclear Power Sector Electric Power Research Institute 3412 Hillview Avenue Palo Alto, CA 94304-1395
SUBJECT:
ELECTRIC POWER RESEARCH INSTITUTE (EPRI), REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MC3221)
Dear Mr. Bilanin:
By letter to the U.S. Nuclear Regulatory Commission (NRC) dated May 25, 2004, the Nuclear Management Company, LLC, submitted an affidavit dated May 24, 2004, executed by you, requesting that the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.790':
"Summary of Minutes of EPRI-MRP PWSCC Crack Growth Expert Panel Meeting, October 3, 2003 - Gaithersburg, Maryland," attached to MRP Letter 2003-38 dated October 20, 2003 A nonproprietary copy of this document has been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The Documentation has been held in confidence by EPRI, its owner. All those accepting copies of the Documentation must agree to preserve the confidentiality of the Documentation.
(ii) The Documentation is a type customarily held in confidence by EPRI and there is a rational basis thereof. The Documentation is a type, which EPRI considers as a trade secret(s) and is held in confidence by EPRI because to disclose it would prevent EPRI from licensing the Documentation at fees, which would allow EPRI to recover its investment. If consultants and/or other businesses providing services in the electric/nuclear power industry were able to publicly obtain the Documentation, they would be able to use it commercially for profit and avoid spending the large amount of money that EPRI was required to spend in preparation of the Documentation. The rational basis that EPRI has for classifying this/these Documentation(s) as a trade
'On February 13, 2004, certain revisions of the NRC's regulations went into effect that renumbered 10 CFR 2.790 as 10 CFR 2.390.
June 24, 2004 secrets is justified by the Uniform Trade Secrets Act, which California adopted in 1984 and which has been adopted by over twenty states. The Uniform Trade Secrets Act defines a "trade secret" as follows:
"Trade secret" means information, including a formula, pattern, compilation, program, device, method, technique, or process, that:
(1) Derives independent economic value, actual or potential, from not being generally known to the public or to other persons who can obtain economic value from its disclosure or use; and (2) Is the subject of efforts that are reasonable under the circumstances to maintain its secrecy.
(iii) The Documentation will be transmitted to the NRC in confidence.
(iv) The Documentation is not available in public sources. EPRI developed the Documentation only after making a determination that the Documentation was not available from public sources. It required a large expenditure of dollars for EPRI to develop the Documentation. In addition, EPRI was required to use a large amount of time of EPRI employees. The money spent, plus the value of EPRI's staff time in preparing the Documentation, show that the Documentation is highly valuable to EPRI.
Finally, the Documentation was developed only after a long period of effort of several years.
(v) A public disclosure of the Documentation would be highly likely to cause substantial harm to EPRI's competitive position and the ability of EPRI to license the Documentation both domestically and internationally. The Documentation can only be acquired and/or duplicated by others using an equivalent investment of time and effort.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted document sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should
June 24, 2004 promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-4018.
Harold K. Chemoff, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page
ML041750139 NRR-084 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME CF Lyon for THarris LRaghavan HChernoff DATE 06/24/04 06/24/04 06/24/04
0
-a Point Beach Nuclear Plant, Units 1 and 2 cc:
Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Mr. F. D. Kuester President & Chief Executive Officer WE Generation 231 West Michigan Street Milwaukee, WI 53201 Regulatory Affairs Manager Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Mr. Jeffery Kitsembel Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Douglas E. Cooper Senior Vice President - Group Operations Palisades Nuclear Plant Nuclear Management Company, LLC 27780 Blue Star Memorial Highway Covert, Ml 49043 Site Director of Operations Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Gary D. Van Middlesworth Site Vice-President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241