February 2005 Monthly Operating Report for Susquehanna, Units 1 and 2
ML050830262
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/11/2005
From: Saccone R
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-005874
Download: ML050830262 (7)


Text

s.. 11 ppa *&o TM Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem /Boulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com March 11, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005874 The February 2005 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached;.

., I Very truly yours, Robet;accn~

JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. A. Blarney NRC Project Manager, Mr. R V. Guzman 12g-q

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/11/2005 J. J. Hennings (570) 542-3747 OPERATING STATUS

1. Unit Name:

Susauehanna Steam Ele

2.

Reporting Period:

February 2005

3.

Design Electrical Rating (Net MWe):

1177

4.

Maximum Dependable Capacity (Net MWe):

ctric Station (UI) 1135

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

This Month 672 672 672 0

768,728 Yr.-to-Date 1416.0 1416.0 1416.0 0

1,637,902 Cumulative 190,489.0 159,404.0 157,016.0 0

162,278,344 NOTES:

Page I of I

UNIT SHUTDOWNS DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-387 One 03/11/2005 J. J. Hennings (570) 542-3747 REPORT MONTH February 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting To Prevent Recurrence Down

_Reactor 3

No Reactor shutdowns this month Summary: On 3/19/05 a power reduction was taken to perform a planned control rod sequence exchange at 70 to 75%

power. Maintenance was also performed on a Reactor Feed Pump Turbine during that period. 100% power was achieved on 3/22/05.

1.

F. Forced S. Scheduled 2.

Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.

Method:

1 - Manual 2 -Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of I

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:

50-387 Completed by: J. J. Hennings Challenges to Main Steam Safetv Relief Valves None.

Date:

03/11/05 Telephone:

(570) 542.3747

OPERATING DATA REPORT DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03111/05 J. J. Hennings (570) 542-3747 OPERATING STATUS

5.

Unit Name:

Susquehanna Steam Electric Station (U2)

6.

Reporting Period:

February 2005

7. Design Electrical Rating (Net MWe):

1182

8. Maximum Dependable Capacity (Net MNVe):

1140

5.

Hours in Reporting Period

6.

Number of Hours Reactor Was Critical

7.

Hours Generator On-Line

8.

Unit Reserve Shutdown Hours

9.

Net Electrical Energy Generated (MWH)

NOTES:

This Month' 672 604.48 600.03 0

617,193 Yr.-to-Date 1,416 1,348.5 1344.0 0

1,475,438 Cumulative 175,729 154,028.2 152,036.7 0

160,290,578 Page 1 of 1

UNIT SHUTDOWNS DOCKET NO.' -

UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 03/11/05 J. J. Hennings (570) 542-3747 REPORT MONTH February 2005 No.

Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor

/3 2126/05 5

71.97 C

1 Scheduled shut down for Refueling Outage. Following the manual turbine trip, the method of shutting down was by normal control rod insertion ("soft" shut down) with no scram required.

Summary: All power changes this month were planned power reductions. The End of Cycle Coastdown continued from January until Reactor Shutdown on 2/26/05. The method of shutting down the reactor was by normal control rod Insertion ("soft' shutdown) with no scram required.

1.

2.

3.

F. Forced S. Scheduled Reason:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)

Page 1 of 1

SUSQUEHIANNA STEAM ELECTRIC STATION Docket Number:

50-388 Date:

03/11/05 Completed by: J. J. Hennings Telephone:

(570) 542-3747 Challenges to Main Steam Safetv Relief Valves None.