ORDER FOR SUPPLIES OR SERVICES PAGE OF PAGES

.IMPORTANT: Mark an packages and papers th contract andlor order numbers.

EPA NO.

l l

1. DATE OF ORDER j2.

CONTRACT NO. (If any)

b. SHIP TO:

I I da NAME OF CONSIGNEE

3. ORDER NO.

MODIFICATIONNO.

4.REQUISmONWREFERENCENO.

U.S. Nuclear Regulatory Commission 042 NRR-03-037-042 Ofc. of Nuclear Reactor Reoulation

5. ISSUING OFFICE (Address correspondence to)
b. STREETADDRESS U.S. Nuclear Regulatory Commission Division of Contracts Two White Flint North -

MS T-7-I-2 c.CITY.

STATE

. ZIP CODE Contract Management Branch No. 2 Washington, DC 20555 Washington DC 20555

7. TO I.

SHIP VIA a NAME OF CONTRACTOR BECKMAN AND ASSOCIATES INC B. TYPE OF ORDER

b. COMPANY NAME b
a.

PURCHASE ORDER

[] b. DELIVERY/TASK ORDER Reference your Except for billing Instructions on tIre reverse. this

c. STREET ADDRESS Please furnish tre following on the terms and deliveryltask order Is aubjed to nstsuctions 1071 STATE ROUTE 136 conditons apedlied on both iades of Ns' order contained on this sIde only of Iris fons and is

________________________________an___

d on tha attached sheet if arny, Incluidng Issued subject to the terrrs and conditions

d. CITY
a. STATE I. ZIP CODE delivery as hIdicated.

of the above-nurnbered contract BELLE VERNON PA 150122926

9. ACCOUNTING AND APPROPRIATION DATA
10. REQUISITIONING OFFICE NRR B&R No.:

520-15-122-142 Job Code:

J-3020 BOC: 252A APPN NO.: 31X0200.520 FFS#: NRR03037042 Ofc. of Nuclear Reactor Regulation OBLIGATE:

$38,123.95

11. BUSINESS CLASSIFICATION (Check appropriate box(es))

[]a.

SMALL

[]b.

OTHER THAN SMALL

c. DISADVANTAGED

]

d. W0MEN-OWNED
12. F.O.B. PO14.

GOVERNMENT BiL NO.

15. DELIVER TO F.O.B. POINT
16. DISCOUNT TERMS N/A I

ON OR BEFORE 4I See Attached N/A

13. PLACE OF FOR INFORMATION CALL (No colled cats) a INSPECTION lb. ACCEPTANCE MONA SELDEN T

J301-415-7907

17. SCHEDULE (See reverse for Rejections)

QUANTITY UNIT QUANTITY ITEM NO.

SUPPLIES OR SERVICES ORDERED UNIT PRICE AMOUNT ACCEPTED (A)

(B)

(C)

(0)

(E)

(F)

(G)

SEE ATTACHED PAGE 2 OF 2 FOR DESCRIPTION OF TASK ORDER NO.

042 UNDER NRC-03-03-037 NOTE:

CONTRACTOR IS REQUIRED TO SIGN PAGE 2 OF THIS DOCUMENT AND RETURN TWO COPIES TO THE ISSUING OFFICE.

18. SHIPPING POINT
19. GROSS SHIPPING WEIGHT
20. INVOICE NO.

I SUBTOTAL

21. MAIL INVOICE TO:

17(h)

.E TOTAL ING U.S. Nuclear Regulatory Commission (Cont INSTRUCTIONS D

iio ofCnrcspages)

ONDiiinoCotat REVERSE

b. STREET ADDRESS (or P.O.

Box) 1()

Contract Management Branch No.

2 GRAND

c. CITY
d. STATE
e. ZIP CODE 38,123.95 TOTAL Washigo DC 20555
22. UNITED STATES OF AMERICA Donald A.

(p ing BY (Signature)

D A.-King

\\______________

_ ___C TiTLE CONTRACTINGIORDERING OFFICER qIdEMPLITlE-ADlDO1 C

arkoPn i

NRC-03-03-037 TASK ORDER NO. 042 Page 2 of 2

SUBJECT:

ISSUANCE OF TASK ORDER NO. 042 "BRUNSWICK TRIENNIAL FIRE PROTECTION INSPECTION" UNDER CONTRACT NO. NRC-03-03-037 This confirms the verbal authorization that was provided to Beckman and Associates, Inc.

(BAA), effective October 8, 2004, to begin work under the subject task order, with a temporary ceiling of $20,000.00.

In accordance with Section G.5, Task Order Procedures, of the subject contract, this definitizes the subject task order. The effort shall be performed in accordance with the enclosed Statement of Work.

Task Order No. 042 shall be in effect from October 8, 2004, through December 10, 2004, with a cost ceiling of $38,123.95. The amount of $36,886.03 represents the estimated reimbursable costs, and the amount of $1,237.92 represents the fixed fee.

The followin individual i considered to be essential to the successful performance of work hereunde The Contractor agrees that such personnel shall not be removed f r the task order without compliance with Contract Clause H.4, Key Personnel.

The issuance of this task order does not amend any terms or conditions of the subject contract.

Acceptance of Task Order No. 042 should be made by having an official, authorized to bind your organization, execute three copies of this document in the space provided and return two copies to the Contract Specialist. You should retain the third copy for your records.

Enclosure:

Statement of Work ACCETD: T erNo. 042 NAME TITLE DATE

CONTRACT NRC-03-03-037 STATEMENT OF WORK Task Order No. 042 TITLE: Brunswick Triennial Fire Protection Inspection INSPECTION REPORT NUMBER: 50-324/2004-010; 50-325/2004-010 B&R NUMBER: 520-15-122-142 JOB CODE: J-3020 NRC PROJECT OFFICER:

Donald Norkin, NRR, (301) 415-2954 TEAM LEADER:

Charlie Payne, Region 11 (404) 562-4669 PERIOD OF PERFORMANCE: 10/08/04 - 12/10/04 BACKGROUND In accordance with the Baseline Inspection portion of the NRC Reactor Oversight Process, a Triennial Fire Protection (TFP) inspection will be conducted for the Brunswick nuclear plant, near Southport, NC. The following inspection procedure will be used and provided by the Team Leader:

71111.05, "Fire Protection" OBJECTIVE The objective of this task order is to obtain expert technical assistance in the Electrical area to assist the NRC inspection team in the performance of the inspection. The specialist shall have a design background (such as from an architect-engineer firm) and experience/knowledge regarding:

- a general knowledge of Appendix R electrical separation requirements

- ability to determine cable routing from drawings and then walk them down in the plant

- ability to read drawings and perform a circuit analysis for vulnerability to fire damage

- ability to assess electrical repairs (i.e., assess Appendix R "cold shutdown repairs")

- knowledge of breaker coordination WORK REQUIREMENTS AND SCHEDULE It shall be the responsibility of the contractor to assign qualified technical staff, employees, and subcontractors, who have the required educational background, experience, or combination thereof, to meet both the technical and regulatory objectives of the work specified in this Statement of Work (SOW). The NRC will rely on representation made by the contractor concerning the qualifications of the personnel proposed for assignment to this task order Attachment

including assurance that all information contained in the technical and cost proposals, including resumes and conflict of interest disclosures, is accurate and truthful.

The Team Leader may issue technical direction from time to time during the duration of this task order. Technical direction must be within the general Statement of Work stated in this task order, and shall not constitute new assignments of work or changes of such nature as to justify an adjustment in cost or period of performance. The contractor shall refer to the basic contract for further information and guidance on any technical directions issued under this task order.

Any modifications to the scope of work, cost, or period of performance of this task order must be issued by the Contracting Officer and will be coordinated with the Project Officer. Specific tasks under this task order are:

1. On-site inspection preparation (bag visit) on, or about, October 12-14, 2004 (3 days).
a.

Complete site access and badging requirements. Become familiar with the plant arrangement.

b.

Select the fire areas to be inspected in detail.

2. Inspection preparation on, or about, October 25-29, 2004 at the region office.
a.

Obtain a thorough understanding of the selected system(s) by review of licensee provided documentation.

b.

Develop a list of questions or areas of concern.

c.

develop a risk informed inspection plan.

3. On-site inspection on, or about, November 1-5, 2004 and November 15-19, 2004. Review and document inspection activities in the contractor's office on, or about, November 8-12, 2004.
a.

Perform the inspection in accordance with Inspection Procedure 71111.05, 'Fire Protection".

b.

Discuss potential findings with the Team Leader.

c.

Document items such as inspection scope and list of documents reviewed.

4. Inspection documentation on, or about, November 22-26, 2004 in the contractor's office.

Final inspection report input is due on, or about, November 29, 2004.

a.

Follow the guidelines of NRC Inspection Manual Chapter 0612, "Power Reactor Inspection Reports", as directed by Team Leader.

b.

Twenty hours is normal for the documentation week. Dependent on risk significance of findings, actual hours could differ (at the discretion of the Team Leader).

Attachment

REPORT REQUIREMENTS During Tasks 2 and 3, the contractor shall provide an inspection plan and inspection related documentation, as directed by the Team Leader.

At the end of Task 4, a feeder to the final inspection report shall be provided to the Team Leader in an electronic format acceptable to the Team Leader. A hard copy shall be provided to the Project Officer. The contractor shall not undertake any further efforts toward report finalization, such as management review of the feeder report.

TRAVEL (for estimating purposes only) for each individual:

One 3 day trip to the plant site.

One 5 day trip to the region office.

Two 5 day trips to the plant site.

The contractor shall coordinate all travel arrangements in advance with the NRC Team Leader.

NRC FURNISHED MATERIAL Documents required to prepare for the inspection will be provided by the NRC Team Leader.

OTHER APPLICABLE INFORMATION The work specified in this SOW is 100% licensee fee recoverable. The contractor shall provide fee recovery information in the monthly progress reports in accordance with the requirements of the basic contract.

Attachment