MillstoneEIS - Comments of Connecticut DEP on Document NUREG-1.437, Supplement22a
- Pigs, 1 1 From:
To:
Date:
Subject:
"Merrily Gere' <merrily.gere @ po.state.ct.us>
<MillstoneEIS © nrc.gov>
Tue, Mar 8, 2005 9:45 AM Comments of Connecticut DEP on Document NUREG-1437, Supplement22 Attached please find the comments of the Connecticut Department of Environmental Protection Bureau of Air Management on the Draft Generic Impact Statement for the License Renewal of the Millstone Power Station Units 2 and 3 (NUREG-1437, Supplement 22). These comments will also arrive by U.S. mail.
Merrily A. Gere Environmental Analyst 2 Connecticut Department of Environmental Protection Bureau of Air Management 79 Elm Street Hartford, CT 06106-5127 Tel: (860) 424-3416 7To conserve, improve and protect the natural resources and environment of the State"
/a 7/? /1/7Z 63 CC:
"Edward Wilds" <edward.wilds@po.state.ct.us>
") 0, " , 1-q "..
e-, -;-51, Z..),
' '#-?) A-L
/ --':".
,,~f
'C-'
- 4) 3~
I cAtem p\\GW 10000 1.TM P Page 1 11 c:\\temp\\GWIOQOO1.TMP Page 1 I Mail Envelope Properties (422DBA72.BE9: 6: 60393)
Subject:
Creation Date:
From:
Comments of Connecticut DEP on Document NUREG-1437, Supplement22 Tue, Mar 8, 2005 9:09 AM "Merrily Gere" <merfi y.gere @po.state.ct.us>
Created By:
merri v.aere @ po.state.ct.us Recipients nrc.gov OWGWPO02.HQGWDO01 MillstoneEIS po.state.ct.us edward.wilds CC (Edward Wilds)
Post Office OWGWPOO2.HQGWDOO1 Files Size MESSAGE 568 Comment on Millstone relicensing final.doc Merrily Gere.vcf 130 Mime.822 40937 Route nrc.gov po.state.ct.us Date & Time Tuesday, March 8, 2005 9:09 AM 28160 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
None Standard No None No Standard
~ MillstoneEIS - Comment on Millstone relicensing final.doc Page 1 81 Milstoe~l -
ommnt n Mllson reicesin fial~oc aae1-VIA ELECTRONIC AND REGULAR MAIL March 2, 2005 Chief, Rules and Directives Branch U.S. Nuclear Regulatory Commission Mail Stop T6-D59 Washington, DC 20555-0001 MillstoneEIS@nrc.gov Re:
Comments of the Connecticut Department of Environmental Protection -
Bureau of Air Management --
Draft Generic Impact Statementfor License Renewal of Nuclear Plants Regarding Millstone Power Station, Units 2 and 3 NUREG-1437, Supplement 22 To the Chief of the Rules and Directive Branch:
The Connecticut Department of Environmental Protection Bureau of Air Management (the Bureau) submits these comments on the U.S. Nuclear Regulatory Commission's (NRC's) Draft Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Millstone Power Station, Units 2 and 3 (Draft EIS). The Draft EIS discusses the environmental impacts of the proposal to renew the operating licenses for Units 2 and 3 of the Millstone Power Station, including the alternatives to license renewal. The Bureau has considered the alternatives presented in the Draft EIS and is concerned that any fossil-fueled alternative electricity supply will have negative air quality impacts as compared to re-licensing the Millstone units.
If the license for the Millstone units is not renewed, additional fossil-fueled generation would likely be necessary to meet the state demand for electricity, as an alternative consisting only of demand reduction, energy efficiency and alternative energy sources is not feasible in the given timeframe. Moreover, the Connecticut Energy Advisory Board's 2004 energy plan specifically identified the inadequacy of the State's transmission infrastructure. Failure to re-license units 2 and 3 will further exacerbate this problem. The Bureau supports the use of clean alternative energy sources and measures that reduce electricity demand. However, the Bureau recognizes that such measures require immediate and substantial changes in behavior with regard to energy use, a substantial investment in low-and no-emitting resources and large-scale implementation of energy conservation and load reduction measures by residential and industrial energy users.
Such changes can only occur over a longer timeframe than that allowed by denial of the license renewal.
The air quality impact of replacing the electricity generated by the Millstone units with electricity generation by large-scale fossil-fueled electric generators is substantial. As the Draft EIS identifies, emissions of nitrogen oxides (NOx), sulfur oxides, carbon monoxide, particulate
I MillstoneEIS - Comment on Millstone relicensing final.doc Page 2 i1 matter and hazardous air pollutants would increase. Increased NOx emissions are a particular
i MillstoneEIS - Comment on Millstone relicensing final.cloc Page 3 11 Miison1
-- Commen on Miltnerlc tia-o Pg Chief, Rules and Directives Branch Page 2 concern to the Bureau since reductions in emissions of ozone precursors are of immediate importance to Connecticut's strategy to attain and maintain the national ambient air quality standards (NAAQS) for ozone. In order to attain the new 8-hour ozone NAAQS statewide by 2010, as required by the U.S. Environmental Protection Agency (EPA), Connecticut is now in the process of identifying additional reductions that may be obtained from a variety of sources in the state. Furthermore, the same assessment is underwvay for fine particulate matter, in order to comply with EPA's designations under the NAAQS for particulate matter less than 2.5 microns in diameter.
The Bureau appreciates the opportunity to submit these comments and will be glad to provide any additional information that you may require.
Sincerely,
/s/Anne R. Gobin, Chief Bureau of Air Management ARGIMAG/mag