Letter Sequence Other |
---|
|
|
MONTHYEARML0508701832005-03-22022 March 2005 Technical Specifications, Elimination of Monthly Operating and Occupational Radiation Exposure Report Requirements, Project stage: Other ML0508106582005-03-22022 March 2005 License Amendment Nos. 239 & 220, Elimination of Monthly Operating and Occupational Radiation Exposure Report Requirements Project stage: Other 2005-03-22
[Table View] |
|
---|
Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23181A1352023-08-22022 August 2023 Issuance of Amendment Nos. 295 and 278 License Amendment Request to Remove the Refueling Water Chemical Addition Tank and Change the Containment Sump Ph Buffer ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22068A0712022-03-22022 March 2022 Issuance of Amendment Nos. 292 and 275 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML21323A1742021-12-22022 December 2021 Issuance of Amendment Nos. 289 and 272 to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A ML21232A2172021-10-19019 October 2021 Issuance of Amendment Nos. 288 and 271 to Revise Technical Specifications Battery Surveillance Testing ML20325A0952021-03-19019 March 2021 Issuance of Amendment to Revise Technical Specifications to Allow Usage of a Small Break Loss of Coolant Accident Methodology (Non-Proprietary) ML20302A1792020-10-29029 October 2020 Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology ML20099F8732020-04-17017 April 2020 Audit Proposed License Amendment Request for the Addition of Westinghouse Topical Report WCAP-16996-P-A, Revision 1 (EPID L-2019-LLA-0243 and EPID L-2019-LLA-0236 ML19319A5832020-01-17017 January 2020 Issuance of Amendment Nos. 285 and 268 to Revise Technical Specifications Regarding Emergency Diesel Generator Maximum Voltage Limits ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19274C9982019-11-13013 November 2019 Issuance of Amendments Regarding Installation of Water Headers in Flood Protection Dike ML19238A1272019-09-12012 September 2019 Issuance of Amendment Nos. 282 and 265 to Revise Technical Specifications Regarding Open Phase Protection ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML18290A8522018-11-27027 November 2018 Issuance of Amendments 280, 263 to Revise Technical Specifications Regarding Ventilation System Surveillance Requirements in Accordance with TSTF-522 ML18180A1972018-07-27027 July 2018 Issuance of Amendments to Revise Technical Specifications Regarding New and Spent Fuel Storage (CAC Nos. MF9712 and MF9713, EPID L-2017-LLA-0240) ML16252A4782016-10-17017 October 2016 Issuance of Amendments Revising Technical Specifications to Address the Issue Identified in Westinghouse NSAL-09-5, Revision 1, and NSAL-15-1, Revision 0 ML16013A4442016-02-22022 February 2016 (NAPS) - Issuance of Amendment for Changes to Technical Specification (TS) 3.8.1 - AC Sources, Operating Revised Surveillance Requirement ML15307A3002016-02-0202 February 2016 (NAPS) - Issuance of Amendments for Changes to the Emergency Action Level Revisions - Correction of Equipment Mark Number ML15245A4822015-10-0707 October 2015 Millstone Power Station, Surry Power Station, and North Anna Power Station - Issuance of Amendments to Revise the Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15187A4242015-07-27027 July 2015 Issuance of Amendments to Change the Reactor Coolant System Pressure and Temperature Limits Regarding Vacuum Fill Operations ML15133A3812015-06-16016 June 2015 Issuance of Amendments to Extended Type a Test Frequency to 15 Years ML15083A4362015-05-14014 May 2015 Issuance of Amendments Regarding Alternate Control Rod Position Monitoring ML14188C4532014-08-27027 August 2014 Issuance of Amendments Regarding Modification of Control Bank Sequence and Overlap Technical Specifications ML14169A3592014-08-12012 August 2014 Stations, Units 1 and 2, Issuance of Amendments Regarding Addition of an Analytical Methodology to the Core Operating Limits Reports and an Increase to the Surry Minimum Temperature for Criticality ML13186A1972013-09-25025 September 2013 Independent Spent Fuel Storage Installations - Issuance of Amendments for Changes to the Emergency Action Level Revisions ML13032A1542013-02-14014 February 2013 Issuance of Amendment for Temporary Change to Allow Two Inoperable Demand Position Indicators Per Control Bank ML13018A1402013-01-28028 January 2013 Issuance of Amendments to Adopt Technical Specification Task Force 510, Revision 2, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection ML12249A2992012-11-20020 November 2012 Issuance of Amendments to Eliminate the Steam Generator Water Level Low Coincident with Steam Flow/Feedwater Flow Mismatch Reactor Trip ML12054A1622012-02-29029 February 2012 Issuance of Amendments Regarding Addition of Analytical Methodology to Core Operating Limits Reports for the Critical Heat Flux Correlation (TACs ME4262 and ME4263) ML12054A1682012-02-29029 February 2012 Issuance of Amendments 267 & 248 Regarding Addition of Analytical Methodology to Core Operating Limits Report for Best Estimate Large Break Loss-of-Coolant Accident (TAC Nos. ME4933 and ME4934) ML11229A0632011-09-28028 September 2011 Issuance of Amendments Regarding Revision of Operability Requirements and Actions for Reactor Coolant System Leakage Detection Instrumentation ML11192A2492011-08-31031 August 2011 Issuance of Amendment Regarding Cyber Security to Dominion Plants ML1106011962011-04-14014 April 2011 Issuance of Amendments Regarding the Use of Optimized Zirlo Fuel Rod Cladding ML1031406572011-01-31031 January 2011 Issuance of Amendments to Adopt Technical Specification Task Force (TSTF) 425, Revision 3 for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program ML1032201142011-01-26026 January 2011 License Amendments, the Amendment Provides Authorization to Upgrade Selected Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels, Rev. 5... ML1010202472010-05-0404 May 2010 Issuance of Amendments to Adopt TSTF-427, Revision 2, to Add New Limiting Condition for Operation 3.0.9 Regarding Unavailability of Barriers ML0935004002010-03-0303 March 2010 Issuance of Amendments to Adopt TSTF-490, Revision 0, Regarding Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Using the Consolidated Line Item Improvement Process ML0922506162009-10-22022 October 2009 Units, 1 and 2, Issuance of Amendments 257 & 238 Regarding Measurement Uncertainty Recapture Power Uprate ML0919000072009-07-29029 July 2009 Issuance of Amendment to Eliminate Working Hour Restrictions from Technical Specifications to Support Compliance with 10 CFR Part 26, TSTF-511 ML0826201812008-10-0909 October 2008 Issuance of Amendments Nos. 253 & 234 Regarding LCO 3.8.7 and 3.8.9, Shared Components ML0815105622008-06-30030 June 2008 Issuance of Amendment Regarding One-Time 5-Year Extension to Type a Test Interval ML0726809452007-10-31031 October 2007 Issuance of License Amendments 252 and 232 Control Room Habitability, Using the Technical Specification Task Force Traveler, TSTF-448, Revision 3 ML0721902592007-10-17017 October 2007 Issuance of License Amendments 251 and 231 Technical Specification Change to Add Limiting Condition for Operation 3.0.8 on the Inoperability of Snubbers, Using the Consolidated Line Item Improvement Process, TSTF-372, Rev 4 ML0721400162007-08-0202 August 2007 Revised Pages of Facility Operating License Nos. NPF-4 and NPF-7 ML0707200432007-03-13013 March 2007 Units, 1 and 2, Issuance of License Amendments 250 and 230 Regarding Technical Specification Changes Per Generic Safety Issue (GSI) 191 ML0636000332006-12-28028 December 2006 Issuance of Corrected Page for Amendment Nos. 248 and 228 ML0634003072006-12-11011 December 2006 License Amendments 249 and 229 Regarding Diesel Fuel Oil Testing Program ML0629004582006-10-16016 October 2006 License Amendments 248 and 228 Regarding Consolidated Line Item Improvement Process for the Steam Generator Tube Integrity 2023-08-22
[Table view] Category:Safety Evaluation
MONTHYEARML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23181A1352023-08-22022 August 2023 Issuance of Amendment Nos. 295 and 278 License Amendment Request to Remove the Refueling Water Chemical Addition Tank and Change the Containment Sump Ph Buffer ML23072A0892023-05-0101 May 2023 (Amendments 346 & 286), North Anna 1 & 2 (Amnds 294 & 277), Surry 1 & 2 (Amnds 311 & 311), and Summer 1 (Amd 225) - Issuance of Amendments to Revise TSs to Adopt TSTF-554 Revise Reactor Coolant Leakage Requirements ML21320A0072022-09-0707 September 2022 Review of Appendix E to DOM-NAF-2, Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code (EPID L-2021-LLT-0000) (Non-Proprietary) ML22196A1972022-07-28028 July 2022 Request for Relief Request N2-I4-LMT-004 Inservice Inspection Limitations ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22068A0712022-03-22022 March 2022 Issuance of Amendment Nos. 292 and 275 to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML22019A0022022-03-0808 March 2022 Regarding Request to Utilize Code Case OMN-28 ML22041A0102022-03-0101 March 2022 V.C. Summer 1, Issuance of Amendment Nos. 283 (Millstone), 291 and 274 (North Anna), and 221 (Summer) to Revise TSs to Adopt TSTF-569 Revision of Response Time Testing Definition ML21323A1742021-12-22022 December 2021 Issuance of Amendment Nos. 289 and 272 to Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A ML21232A2172021-10-19019 October 2021 Issuance of Amendment Nos. 288 and 271 to Revise Technical Specifications Battery Surveillance Testing ML21264A0112021-10-18018 October 2021 Safety Evaluation Report Related to the Subsequent License Renewal of North Anna Power Station, Units 1 and 2 ML21075A0452021-03-26026 March 2021 Request to Utilize Code Case N-885 ML20325A0952021-03-19019 March 2021 Issuance of Amendment to Revise Technical Specifications to Allow Usage of a Small Break Loss of Coolant Accident Methodology (Non-Proprietary) ML20364A0402021-01-15015 January 2021 Request for Relief Request N1-I4-LMT-003 Inservice Inspection Limitations ML20350B8062020-12-28028 December 2020 Request for Relief Request N1-I5-NDE-002 Inservice Inspection Alternative ML20302A1792020-10-29029 October 2020 Non-Proprietary, Issuance of Amendment Nos. 286 and 269 to Revise Technical Specifications to Allow Usage of a Full Spectrum Loss of Coolant Accident Methodology ML20253A3292020-09-30030 September 2020 Revised License Renewal Commitment Pressurizer Surge Line Weld Inspection Frequency ML20252A0042020-09-23023 September 2020 Request for Relief Request Fifth 10-Year Interval ML20252A0072020-09-15015 September 2020 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI ML20031E7842020-02-19019 February 2020 Request for Relief Request P-9 to Defer Performance of Comprehensive Pump Test ML19319A5832020-01-17017 January 2020 Issuance of Amendment Nos. 285 and 268 to Revise Technical Specifications Regarding Emergency Diesel Generator Maximum Voltage Limits ML19305D2482019-12-31031 December 2019 Issuance of Amendments Adoption of Emergency Action Level Schemes Per NEI 99-01, Rev. 6 ML19274C9982019-11-13013 November 2019 Issuance of Amendments Regarding Installation of Water Headers in Flood Protection Dike ML19238A1272019-09-12012 September 2019 Issuance of Amendment Nos. 282 and 265 to Revise Technical Specifications Regarding Open Phase Protection ML19143A3422019-05-29029 May 2019 Inservice Inspection Alternative Request N2-I4-LMT-003 ML19140A2882019-05-28028 May 2019 Inservice Inspection Alternative Requests N1-I5-CMP-001 and N2-I5-CMP-001 ML19135A3242019-05-21021 May 2019 Inservice Inspection Alternative Request N1-I4-CS-002 ML19093B2742019-04-15015 April 2019 Inservice Inspection Alternative Requests N1-I5-SPT-001 and N2 I5 Spt 001 ML19092A4172019-04-15015 April 2019 Unit Nos.1 and 2 Inservice Inspection Alternative Requests N1-I5-NDE-001 and N2 I5 NDE 001 ML19031B2272019-02-27027 February 2019 Issuance of Amendment Nos. 281, 264, 294, and 294 to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes ML19039A2362019-02-14014 February 2019 Inservice Inspection Alternative N2-I4-NDE-007 ML18290A8522018-11-27027 November 2018 Issuance of Amendments 280, 263 to Revise Technical Specifications Regarding Ventilation System Surveillance Requirements in Accordance with TSTF-522 ML18225A0202018-08-29029 August 2018 ISFSI; North Anna 1 & 2 Isfsls, and Unit 3; Surry Power 1 & 2, and Isfsls); Dominion Energy Kewaunee, Inc. (Kewaunee Power Station and Isfsi): Request for Threshold Determination Under 10 CFR 50.80 ML18180A1972018-07-27027 July 2018 Issuance of Amendments to Revise Technical Specifications Regarding New and Spent Fuel Storage (CAC Nos. MF9712 and MF9713, EPID L-2017-LLA-0240) ML18031A2222018-02-0606 February 2018 Letter to D. G. Stoddard Issuance of Renewed Materials License No. SNM-2507 for the North Anna Power Station Independent Spent Fuel Storage Installation (Cac/Epid Nos. 001028/L-2017-RNW-0010 and 000993/L-2017-LNE-0008) ML18029A1842018-02-0202 February 2018 Proposed Inservice Inspection Alternatives N1-I4-NDE-010 and N2-I4-NDE-005 (CAC Nos. MF9534 and MF9535; EPID L-2017-LLR-0029) ML18019A1952018-01-24024 January 2018 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination (CAC Nos. MF9923, MF9924, MF9925, MF9926, MF9927, and MF9928; EPID L-2017-LLR-0060) ML18005A1092018-01-10010 January 2018 Relief Request (RR) N1-I4-LMT-002, Limited Coverage Examinations for the Fourth Ten-Year Inspection Interval (CAC No. MF9689; EPID L-2017-LLR-0024) ML17332A0782017-12-12012 December 2017 ISFSI; Millstone and ISFSI; North Anna and ISFSI; Surry and ISFSI - Request for Approval of Revision 24 of the Nuclear Facility Quality Assurance Program Description Topical Report, DOM-QA-1 (CAC Nos. MF9732-MF9739; EPID L-2017-LLQ-0001) ML17332A6632017-12-0606 December 2017 Proposed Inservice Inspection Alternatives N1-I4-NDE-009 and N2-I4-NDE-004 (CAC Nos. MF9298 and MF9299; EPID L-2016-LLR-0018) ML17221A2522017-08-17017 August 2017 Proposed Alternative to Implement Code Case N-839 ML17053A2432017-07-21021 July 2017 Relief Request (RR) N1-I4-NDE-008, and N2-I4-NDE-003 Inservice Inspection Program ML17046A3162017-04-0606 April 2017 Connecticut, Virginia, Millstone, North Anna, Surry, Submission of Revision 21 of the Quality Assurance Topical Report for NRC Approval and Submission Revision 22 for Information Only (CAC Nos. MF8128 - MF8234) ML16252A4782016-10-17017 October 2016 Issuance of Amendments Revising Technical Specifications to Address the Issue Identified in Westinghouse NSAL-09-5, Revision 1, and NSAL-15-1, Revision 0 ML16209A4132016-07-27027 July 2016 Safety Evaluation For North Anna Power Station, Units 1 And 2, Proposed License Amendment To Revise The Technical Specifications To Address The Issue Identified In Westinghouse Documents NSAL-09-5. Rev. 1 and NSAL-15-I (TAC No. MF7186 and MF7187) ML16028A4342016-03-0101 March 2016 Relief Request (RR) N1-I4-SPT-006, Inservice Inspection Program ML16013A4442016-02-22022 February 2016 (NAPS) - Issuance of Amendment for Changes to Technical Specification (TS) 3.8.1 - AC Sources, Operating Revised Surveillance Requirement ML15307A3002016-02-0202 February 2016 (NAPS) - Issuance of Amendments for Changes to the Emergency Action Level Revisions - Correction of Equipment Mark Number 2023-08-22
[Table view] |
Text
March 22, 2005 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711
SUBJECT:
NORTH ANNA POWER STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS ON ELIMINATION OF REQUIREMENTS TO PROVIDE MONTHLY OPERATING REPORTS AND ANNUAL OCCUPATIONAL RADIATION EXPOSURE REPORTS (TAC NOS. MC5432 AND MC5433)
Dear Mr. Christian:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment Nos. 239 and 220 to Renewed Facility Operating License Nos. NPF-4 and NPF-7 for the North Anna Power Station, Unit Nos. 1 and 2. The amendments change the Technical Specifications (TS) in response to your letter dated December 21, 2004.
These amendments revise the TS by eliminating the requirements to submit monthly operating reports and annual occupational radiation exposure reports.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Stephen Monarque, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosures:
- 1. Amendment No. 239 to NPF-4
- 2. Amendment No. 220 to NPF-7
- 3. Safety Evaluation cc w/encls: See next page
NRR-058 OFFICE CLIIP LPM PDII-1/PM PDII-2/LA PDII-1/SC NAME WReckley SMonarque EDunnington JNakoski DATE 3/14/05 03/ 18 /2005 03 / 18 /2005 03 / 22 /2005 VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-338 NORTH ANNA POWER STATION, UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 239 Renewed License No. NPF-4
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Virginia Electric and Power Company et al.,
(the licensee) dated December 21, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (I) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-4 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 239, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 22, 2005
VIRGINIA ELECTRIC AND POWER COMPANY DOCKET NO. 50-339 NORTH ANNA POWER STATION, UNIT NO. 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 220 Renewed License No. NPF-7
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Virginia Electric and Power Company et al.,
(the licensee) dated December 21, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (I) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-7 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 220, are hereby incorporated in the renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 90 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 22, 2005
ATTACHMENT TO LICENSE AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-4 LICENSE AMENDMENT NO. 220 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-7 DOCKET NOS. 50-338 AND 50-339 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages as indicated. The revised pages are identified by amendment number and contain vertical lines indicating the areas of change.
Remove Pages Insert Pages 5.6-1 5.6-1 5.6-2 5.6-2 5.6-3 5.6-3 5.6-4 5.6-4 5.6-5 5.6-5
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 239 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-4 AND AMENDMENT NO. 220 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-338 AND 50-339
1.0 INTRODUCTION
By letter dated December 21, 2004, (ADAMS Accession No. ML043560498), the Virginia Electric and Power Company (the licensee) submitted a request for changes to the North Anna Power Station, Unit Nos. 1 and 2, Technical Specifications (TS). The requested change would delete TS 5.6.1, Occupational Radiation Exposure Report, and TS 5.6.4, Monthly Operating Reports, as described in the Notice of Availability published in the Federal Register on June 23, 2004 (69 FR 35067).
2.0 REGULATORY EVALUATION
Section 182a. of the Atomic Energy Act of 1954, as amended, (the Act) requires applicants for nuclear power plant operating licenses to state TS to be included as part of the license. The Commissions regulatory requirements related to the content of TS are set forth in 10 CFR 50.36, Technical specifications. The regulation requires that TS include items in five specific categories, including (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) surveillance requirements; (4) design features; and (5) administrative controls. However, the regulation does not specify the particular requirements to be included in a plants TS.
The Commission has provided guidance for the content of TS in its Final Policy Statement on Technical Specification Improvements for Nuclear Power Reactors (58 FR 39132, published July 22, 1993), in which the Commission indicated that compliance with the Final Policy Statement satisfies Section 182a. of the Act. The Final Policy Statement identified four criteria to be used in determining whether a particular item should be addressed in the TS as an LCO.
The criteria were subsequently incorporated into 10 CFR 50.36 (60 FR 36593, published July 19, 1995). While the criteria specifically apply to LCOs, the Commission indicated that the intent of these criteria may be used to identify the optimum set of administrative controls in TS.
Addressing administrative controls, 10 CFR 50.36 states that they are the provisions relating to
organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner. The specific content of the administrative controls section of the TS is, therefore, related to those programs and reports that the Commission deems essential for the safe operation of the facility that are not adequately covered by regulations or other regulatory requirements. Accordingly, the NRC staff may determine that specific requirements, such as those associated with this change, may be removed from the administrative controls in the TS if they are not explicitly required by 10 CFR 50.36(c)(5) and are not otherwise necessary to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.
The impetus for the monthly operating report (MOR) came from the 1973-1974 oil embargo.
Regulatory Guide 1.16, Revision 4, "Reporting of Operating Information - Appendix A Technical Specifications," published for comment in August 1975, identifies operating statistics and shutdown experience information that was desired in the operating report at that time. In the mid-1990s, the NRC staff assessed the information that is submitted in the MOR and determined that while some of the information was no longer used by the NRC staff, the MOR was the only source of some data used in the NRC Performance Indicator (PI) Program of that time period (see NRC Generic Letter (GL) 97-02, Revised Contents of the Monthly Operating Report). Beginning in the late 1990s, the NRC developed and implemented a major revision to its assessment, inspection, and enforcement processes through its Reactor Oversight Process (ROP). The ROP uses both plant-level PIs and inspections performed by NRC personnel. In conjunction with the development of the ROP, the NRC developed the Industry Trends Program (ITP). The ITP provides the NRC a means to assess overall industry performance using industry level indicators and to report on industry trends to various stakeholders (e.g., Congress). Information from the ITP is used to assess the NRCs performance related to its goal of having no statistically significant adverse industry trends in safety performance.
The ITP uses some of the same PIs as the PI Program from the mid-1990s and, therefore, the NRC has a continuing use for the data provided in MORs. The NRC also uses some data from the MORs to support the evaluation of operating experience, licensee event reports, and other assessments performed by the NRC staff and its contractors.
Licensees are required by TS to submit annual occupational radiation exposure reports (ORERs) to the NRC. The reports, developed in the mid-1970s, supplement the reporting requirements currently defined in 10 CFR 20.2206, Reports of individual monitoring, by providing a tabulation of data by work areas and job functions. The NRC included data from the ORERs in its annual publication of NUREG-0713, Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities, through the year 1997 but no longer includes the data in that or other reports.
3.0 TECHNICAL EVALUATION
3.1 Monthly Operating Reports As previously mentioned, the administrative requirements in TS are reserved for the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner. The current use of the information from the MORs is not related to reporting on or confirming the safe operation of specific nuclear power plants. Instead, the data is used by the NRC to assess and
communicate with stakeholders regarding the overall performance of the nuclear industry. Data related to PIs for specific plants are reported to the NRC as part of the ROP. The NRC staff has determined that the MORs do not meet the criteria defined for requirements to be included in the administrative section of TS and the reporting requirement may, therefore, be removed.
Although the MORs do not satisfy the criteria for inclusion in TS, the NRC staff nevertheless has a continuing need to receive the data in order to compile its reports on industry trends and to support other evaluations of operating experience. In addition, information such as plant capacity factors that are reported in the MORs are useful to the NRC staff and are frequently asked for by agency stakeholders.
The NRC staff interacted with licensees, industry organizations, and other stakeholders during the development of the Consolidated Data Entry (CDE) program (currently being developed and maintained by the Institute of Nuclear Power Operation), regarding the use of an industry database like CDE to provide data currently obtained from MORs. These discussions also involved the related Revision 1 to TSTF-369, Removal of Monthly Operating Report and Occupational Radiation Exposure Report. As described in Section 4 of this safety evaluation, the licensee is making a regulatory commitment to continue to provide the data identified in GL 97-02 following the removal of the TS requirement to submit MORs and will, therefore, continue to meet the needs of the NRC staff for the ITP and other evaluations. The use of an industry database such as CDE is more efficient and cost-effective for both the NRC and licensees than would be having the NRC staff obtain the needed information from other means currently available. Should a licensee fail to satisfy the regulatory commitment to voluntarily provide the information, the NRC could obtain the information through its inspection program (similar to the process described in NRC Inspection Procedure 71150, Discrepant or Unreported Performance Indicator Data) with the licensee being charged for the time spent by the NRC staff.
The only significant changes resulting from the adoption of TSTF-369 are that the information will be provided quarterly instead of monthly (although the operating data will still be divided by month) and the form of the reporting will be from a consolidated database such as CDE instead of in correspondence from individual licensees. The change of reporting frequency to quarterly has some advantages for both the NRC staff and licensees, since it will coincide with the collection and submission of the ROP PI data. In terms of the specific method used to transmit the data to the NRC, the licensee has committed (see Section 4.0) to provide data identified in GL 97-02 on a quarterly basis. The NRC staff believes that the most efficient process for licensees and the NRC will be for all licensees to use a system such as CDE. Such systems have advantages in terms of improved data entry, data checking, and data verification and validation. The NRC will recognize efficiency gains by having the data from all plants reported using the same computer software and format. Although the data may be transmitted to the NRC from an industry organization maintaining a database such as CDE, the licensee provides the data for the system and remains responsible for the accuracy of the data submitted to the NRC for its plant. The public will continue to have access to the data through official agency records accessible on the Agencywide Documents Access and Management System (ADAMS).
3.2 Occupational Radiation Exposure Reports The information that the NRC staff needs regarding occupational doses is provided by licensees in the reports required under 10 CFR Part 20. The data from the Part 20 reports are sufficient to support the NRC trending programs, radiation-related studies, and preparation of reports such as NUREG-0713. Accordingly, the NRCs limited use of the ORER submitted pursuant to the existing TS requirements no longer warrants the regulatory burden imposed on licensees. Therefore, the NRC staff finds it acceptable that TS 5.6.1 is being deleted and the ORER will no longer be submitted by the licensee.
4.0 VERIFICATIONS AND COMMITMENTS In order to efficiently process incoming license amendment applications, the NRC staff requested each licensee requesting the changes addressed by TSTF-369 using the CLIIP to address the following plant-specific regulatory commitment.
Each licensee should make a regulatory commitment to provide to the NRC using an industry database the operating data (for each calender month) that is described in Generic Letter 97-02 Revised Contents of the Monthly Operating Report, by the last day of the month following the end of each calendar quarter.
The regulatory commitment will be based on use of an industry database (e.g.,
the industrys Consolidated Data Entry (CDE) program, currently being developed and maintained by the Institute of Nuclear Power Operations).
The licensee has made a regulatory commitment to provide the requested data via an industry database (e.g., the CDE) by the end of the month following each calendar quarter.
The NRC staff finds that reasonable controls for the implementation and for subsequent evaluation of proposed changes pertaining to the above regulatory commitment can be provided by the licensees administrative processes, including its commitment management program. The NRC staff has agreed that NEI 99-04, Revision 0, Guidelines for Managing NRC Commitment Changes, provides reasonable guidance for the control of regulatory commitments made to the NRC staff (see Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000). The NRC staff notes that this amendment establishes a voluntary reporting system for the operating data that is similar to the system established for the ROP PI program. Should the licensee choose to incorporate a regulatory commitment into the final safety analysis report or other document with established regulatory controls, the associated regulations would define the appropriate change-control and reporting requirements.
5.0 STATE CONSULTATION
In accordance with the Commissions regulations, the Virginia State official was notified of the proposed issuance of the amendments. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendment relates to changes in recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributors: W. Reckley Date: March 22, 2005
North Anna Power Station, Units 1 & 2 cc:
Mr. C. Lee Lintecum Mr. Jack M. Davis County Administrator Site Vice President Louisa County North Anna Power Station Post Office Box 160 Virginia Electric and Power Company Louisa, Virginia 23093 Post Office Box 402 Mineral, Virginia 23117-0402 Ms. Lillian M. Cuoco, Esq.
Senior Counsel Dr. Robert B. Stroube, MD, MPH Dominion Resources Services, Inc. State Health Commissioner Building 475, 5 th floor Office of the Commissioner Rope Ferry Road Virginia Department of Health Waterford, Connecticut 06385 Post Office Box 2448 Richmond, Virginia 23218 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U. S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117