Lt 05000416/2005301 - Grand Gulf Nuclear Station - NRC Initial Operator Licensing Examination Report Notification Letter
ML050810534
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/21/2005
From: Gody A
Operations Branch IV
To: Gerald Williams
Entergy Operations
References
IR-05-301
Download: ML050810534 (5)


See also: IR 05000416/2005301

Text

March 21, 2005

Mr. George Williams

Vice President, Nuclear Operations

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, Mississippi 39150

SUBJECT:

GRAND GULF NUCLEAR STATION - NRC INITIAL OPERATOR LICENSING

EXAMINATION REPORT 05000416/2005-301

Dear Mr.Williams:

In a telephone conversation on March 1, 2005, between Messrs. P. Gage, Chief Examiner, and

M. Ellis, Operations Training Supervisor and M. Rasch, Senior Operations Instructor,

arrangements were made for the administration of licensing examinations at your Grand Gulf

Nuclear Station during the week of August 15, 2005.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for

Power Reactors." The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by April 18, 2005. The written examinations, operating tests, and the supporting

reference materials identified in Attachment 2 of ES-201 and as specified by the chief examiner

will be due by June 20, 2005. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of

the facility licensee shall approve the outlines, examinations, and tests before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use. Any delay in receiving the required examination and reference materials, or the submittal

of inadequate or incomplete materials, may cause the examinations to be rescheduled.

Additionally, an onsite validation of the examination material will be performed during the week

of July 18, 2005. Sufficient staff resources and the simulator should be made available for the

examination validation.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Entergy Operations, Inc.

-2-

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />

per response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response will be made available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. M. Ellis has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact P. Gage at (817) 860-8273, or myself at

(817) 860-8159 .

Sincerely,

/RA/

Anthony T. Gody, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-416

License: NPF-29

Entergy Operations, Inc.

-3-

cc:

Senior Vice President

and Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, MS 39286-1995

Wise, Carter, Child & Caraway

P.O. Box 651

Jackson, MS 39205

Winston & Strawn

1400 L Street, N.W. - 12th Floor

Washington, DC 20005-3502

Jay Barkley, Chief

Energy & Transportation Branch

Environmental Compliance and

Enforcement Division

Mississippi Department of

Environmental Quality

P.O. Box 10385

Jackson, MS 39289-0385

President, District 1

Claiborne County Board of Supervisors

P.O. Box 339

Port Gibson, MS 39150

General Manager

Grand Gulf Nuclear Station

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, MS 39150

The Honorable Charles C. Foti, Jr.

Attorney General

Department of Justice

State of Louisiana

P.O. Box 94005

Baton Rouge, LA 70804-9005

Governor Haley Barbour

Office of the Governor

State of Mississippi

Jackson, MS 39201

Entergy Operations, Inc.

-4-

Jim Hood, Attorney General

State of Mississippi

P.O. Box 22947

Jackson, MS 39225

Dr. Brian W. Amy

State Health Officer

State Board of Health

P.O. Box 1700

Jackson, MS 39215

Robert W. Goff, Program Director

Division of Radiological Health

Mississippi Dept. of Health

P.O. Box 1700

Jackson, MS 39215-1700

Director

Nuclear Safety & Licensing

Entergy Operations, Inc.

1340 Echelon Parkway

Jackson, MS 39213-8298

Director, Nuclear Safety

and Regulatory Affairs

Entergy Operations, Inc.

P.O. Box 756

Port Gibson, MS 39150

Entergy Operations, Inc.

-5-

Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (MRS)

Senior Resident Inspector (GBM)

Branch Chief, DRP/A (WDJ)

Senior Project Engineer, DRP/A (TRF)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

SISP Review Completed: _Yes____ADAMS:  : Yes

G No Initials: ______

Publicly Available G Non-Publicly Available G Sensitive
Non-Sensitive

R:\\_GG\\2005\\GG2005-301lt-pcg.wpd

SOE:OB

C:OB

PCGage/lmb

ATGody

/RA/

/RA/

3/21/2005

3/21/05

OFFICIAL RECORD COPY